Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance MIG 354 4TH CROSS STREET MOGAPPAIR ERI SCHEME CHENNAI 37 | CHENNAI | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
21 Jun 2021, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/TP-I/CHN
A-10, Thiru -Vi -Ka Indl Estate, Guindy, Chennai -32
Providing stub setting, concreting, Tower erection in NMD18 (loc.7 and Loc.8) for providing necessary clearance for the proposed coal pipe conveyor and re-routing of 110KV DC line on DC tower from Athipattu 230/110KV SS to dedicated feeder (Altern
2021_EB_202193_1
TP1-003/2021-22
Open Tender
Civil Works
Works
120 days
Chennai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.1 L
22 Jun 2021
7 Jun 2021
22 Jun 2021
7 Jun 2021
21 Jun 2021
7 Jun 2021
180 days
Amount
Clearing juliflora jungle including cost of all labour, lead, lift, etc., complete and as directed by the Dept. Engineer at site.
Conducting check survey and Location pit marking for carrying out survey assesment tools and plants cutting of small trees whereever necessary as directed by Engineer
Levelling the ups and downs of the river bangs by engaging JCB for maring of location for providing well foundation with all hire charges etc complete.
Forming of approach Path/Road with good quality of gravel filling in gunny bags around the tower loc and path way in slushy soil including cost of all materials, labour, lead, lift etc., complete as directed by the dept. engineer at site.
Providing temporary bund around tower location by supply and filling up the empty polythene bags with sand stitchig them conveying the same to site and stacking, laying in position around tower location and disposing off from site after successfull completion of work including polythene bags, jute, thread, and all materials and labour charges for filling sand, alying and filling and bailing out of water etc., complete and as directed by the Engineer at site
Providing shoring and shuttering with CW scantling and planks including cost of all materials,labour lead lift etc complete.As directed by the Engineer at site.
Bailing out of water by pumpset including cost of diesel pumpset 0.5HP cost of all materials labour lead and lift etc complete
plain cement concrete 1:3:6 using 20mm HBG Stone including cost of all materials lead and lift etc complete.
Labour charges for transport of Template including assembling of template, stub and cleat and shifting of template from location to location and reassembling the same including cost of all labour, transport lead, lifts etc., complete as directed by the department engineer at site. (The template will be make own arrangement by the contractor). Prop Tower NMD+18 MC Loc No. 7 & 8
R:C:C 1:1:5:3 using 12 to 20mm metal with form work including cost of all materials, curing,labour, lead, etc., complete.
Providing Steel Reinforcement including cost of steel labour for cutting,bending tying with binding wire and placing reinforcement as directed by the engineer at siteetc complete.
Back filling of pits with excavated earth including watering and consolidation and spread balance earth around the location ,lead and lift etc.complete.
Pipe type earthing - Providing Tower earthing using 25mm dia GI Pipe 3m long into the bore including cost of 60mm dia collar placing over the tower leg as directed by dept engineer at site
Labour charges for erection of tower including cost of transporting charges,sorting out of tower parts,erection of tower,t&p etc complete Prop Towers NMD+18 ( Normal condition )
Welding of exposed bolts and nuts 1 cm each at two places opposite to each other after tightening and punching of tower parts including cost of welding rods all T&P upto bottom cross arm including cost of all materials, labour lead lift etc., complete Prop Tower NMD+18
Providing plastering C:M 1 : 3 12mm thick including cost of all materials labour lead, lift, etc., complete in all respect Prop Tower NMD+18
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
K DHINAKARAN
Dillibabu
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .