Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹74,197.87Admitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹87,391.62+₹13,193.76 (17.8%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹97,058.62+₹22,860.76 (30.8%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹97,252.94+₹23,055.07 (31.1%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹97,000
EMD Value
₹1,940
Closing Date
21 Sept 2026, 6:00 pmClosed
Executive Engineer, REW Jammu
Office of the Executive Engineer, REW Jammu
Constt.of Irrigation Channel NLO Ex Cap.Sham Lal and other at Kalyala w.no.8, Pyt. Bhalwal Brahmana Block- Bhalwal Brahmana under PRI Grant Distt.Capex Budget for the year 2026-27. (Block Level)
2026_RDPR_324531_1
e-NIT No. 585 REWJ of 2026-27 dated 14-09-2026
Open Tender
Civil Works
Percentage
30 days
Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹1,940
30 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manually means in trenches for foundation, drain, pipes, cables etc and for shafts, wells. Cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 m inciuding disposal of excavated earth in: AKOS | 21.24 | cum | 479.3 | ₹10,180.33 |
| 2 | P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 4.1 | cum | 4,826.5 | ₹19,788.65 |
| 3 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 6.4 | cum | 5,733.6 | ₹36,695.04 |
| 4 | P/Laying of cement conct. Flooring 40mm thick cement conc. 1:2:4 Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 18.69 | sqm | 510.25 | ₹9,536.57 |
| 5 | Centering and shuttering including strutting,propping etc and removal of form for foundations,footings,bases of column etc for mass concrete | 50 | sqm | 286.35 | ₹14,317.5 |
| 6 | Carriage of sand upto 6 kms by MT | 5.6 | cum | 216.4 | ₹1,211.84 |
| 7 | Carriage of Aggregates upto 6 kms by MT | 11.21 | cum | 216.4 | ₹2,425.84 |
| 8 | Providing and fixing Display board(4.0x3.0) including painting,writing all complete | 1 | no. | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1094795.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .