Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
26 Jun 2026, 9:00 am
DSCO
SOIL CONSERVATION COMPLEX NEAR DARA STUDIO
Construction of Rain water recharging cum Silt detention and Crate wire structures in Village Surewal Khatana Khad Rajgiri Khad Bathlor Jathwarh Under Sub Division Nurpur Bedi Tehsil Shri Anandpur Sahib District Roopnagar
2026_DOA_169967_1
DSWC/MOH/2026-2027/03
Open Tender
Civil Works
90 days
ROPAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹1.4 L
11 Jun 2026
11 Jun 2026
26 Jun 2026
11 Jun 2026
26 Jun 2026
11 Jun 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Tender No. DSWC/MOH/2026-27/01
1. Construction of Crate Wire Structures Village Bardar,Bari, Kakot, Tehsil & District Rupnagar, 2. Field Drop Structures Village Haripur ,Hirdapur, Babani, Tehsil & District Rupnagar 3. For Construction of Stone Masonary Water Recharging Structures and Crate Wire Structures Village Majri, BhangalaTehsil & District Rupnagar 4. Construction of Gabion Structures Village Masol, Tanda, kasauli, bhagindi Tehsil Kharar, District S.A.S Nagar 5. For Construction of Crate Wire Structures, Run Off Control Structure and Inlet (Ghaat) of Pond Project Village Parach ,Tehsil Kharar, District SAS Nagar 6. Stone Masonary Water Recharging Structure Project No.1, Village - Sanana ,Chhoti Makori, Tehsil and Distt.- Rupnagar ,Punjab
RATES FOR CIVIL WORK( Approved by CCS PUNJAB Chandigarh)
Name & Address of Firm/ Bidder
Total Estimated Cost
Quoted by Contractor (as %age less of estimated Amount) Less (-%) 0 Amount Quoted
2 For Construction of Crate Wire Structures 3 to 7 Project Village Bari ,Tehsil & District Rupnagar
Estimate San.No. 3006 Dated 12-11-2025 for Rs. 229600.00/-
A. CRATE WIRE STRUCTURE-3
2.01 Boulder (18 to 40 kg) 21.53 Per Sqm 1071.88 Twenty Three Thousand Seventy Seven Rupees and Fifty Seven Paise
2.02 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 169.07 Per Cum 62.16 Ten Thousand Five Hundred Nine Rupees and Thirty Nine Paise
2.03 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.5 Per Cum 37 Three Hundred Eighty Eight Rupees and Fifty Paise
2.04 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 76.85 Per Sqm 58 Four Thousand Four Hundred Fifty Seven Rupees and Thirty Paise
2.05 Spreading of wire crates as per PWD specifications CSR 23.37 76.85 Per Sqm 70 Five Thousand Three Hundred Seventy Nine Rupees and Fifty Paise
2.06 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 21.53 Per Cum 321 Six Thousand Nine Hundred Eleven Rupees and Thirteen Paise
GST DIFFERNCE 12% TO 18% @5.35%
B. CRATE WIRE STRUCTURE-4
2.07 Boulder (18 to 40 kg) 15.38 Per Sqm 1071.88 Sixteen Thousand Four Hundred Eighty Five Rupees and Fifty One Paise
2.08 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 124.63 Per Cum 62.16 Seven Thousand Seven Hundred Forty Seven Rupees and No Paise
2.09 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37 Two Hundred Seventy Seven Rupees and Fifty Paise
2.1 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 56.65 Per Sqm 58 Three Thousand Two Hundred Eighty Five Rupees and Seventy Paise
2.11 Spreading of wire crates as per PWD specifications CSR 23.37 56.65 Per Sqm 70 Three Thousand Nine Hundred Sixty Five Rupees and Fifty Paise
2.12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 15.38 Per Cum 321 Four Thousand Nine Hundred Thirty Six Rupees and Ninety Eight Paise
GST DIFFERNCE 12% TO 18% @5.35%
C. CRATE WIRE STRUCTURE-5
2.13 Boulder (18 to 40 kg) 15.38 Per Sqm 1071.88 Sixteen Thousand Four Hundred Eighty Five Rupees and Fifty One Paise
2.14 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 124.63 Per Cum 62.16 Seven Thousand Seven Hundred Forty Seven Rupees and No Paise
2.15 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.5 Per Cum 37 Two Hundred Seventy Seven Rupees and Fifty Paise
2.16 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 56.65 Per Sqm 58 Three Thousand Two Hundred Eighty Five Rupees and Seventy Paise
2.17 Spreading of wire crates as per PWD specifications CSR 23.37 56.65 Per Sqm 70 Three Thousand Nine Hundred Sixty Five Rupees and Fifty Paise
2.18 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 15.38 Per Cum 321 Four Thousand Nine Hundred Thirty Six Rupees and Ninety Eight Paise
GST DIFFERNCE 12% TO 18% @5.35%
D. CRATE WIRE STRUCTURE-6
2.19 Boulder (18 to 40 kg) 21.53 Per Sqm 1071.88 Twenty Three Thousand Seventy Seven Rupees and Fifty Seven Paise
2.2 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 169.07 Per Cum 62.16 Ten Thousand Five Hundred Nine Rupees and Thirty Nine Paise
2.21 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.5 Per Cum 37 Three Hundred Eighty Eight Rupees and Fifty Paise
2.22 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 76.85 Per Sqm 58 Four Thousand Four Hundred Fifty Seven Rupees and Thirty Paise
2.23 Spreading of wire crates as per PWD specifications CSR 23.37 76.85 Per Sqm 70 Five Thousand Three Hundred Seventy Nine Rupees and Fifty Paise
2.24 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 21.53 Per Cum 321 Six Thousand Nine Hundred Eleven Rupees and Thirteen Paise
GST DIFFERNCE 12% TO 18% @5.35%
E. CRATE WIRE STRUCTURE-7
2.25 Boulder (18 to 40 kg) 21.53 Per Sqm 1071.88 Twenty Three Thousand Seventy Seven Rupees and Fifty Seven Paise
2.26 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 169.07 Per Cum 62.16 Ten Thousand Five Hundred Nine Rupees and Thirty Nine Paise
2.27 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.5 Per Cum 37 Three Hundred Eighty Eight Rupees and Fifty Paise
2.28 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 76.85 Per Sqm 58 Four Thousand Four Hundred Fifty Seven Rupees and Thirty Paise
2.29 Spreading of wire crates as per PWD specifications CSR 23.37 76.85 Per Sqm 70 Five Thousand Three Hundred Seventy Nine Rupees and Fifty Paise
2.3 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 21.53 Per Cum 321 Six Thousand Nine Hundred Eleven Rupees and Thirteen Paise
GST DIFFERNCE 12% TO 18% @5.35%
3 For Construction of Field Drop Structures 7 to 12 Project Village Haripur ,Tehsil & District Rupnagar
Estimate San.No. 3876 Dated 29-01-2026 for Rs. 444600.00/-
A. FIELD DROP STRUCTURE-7
3.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.66 Per Cum 37 Three Hundred Ninety Four Rupees and Forty Two Paise
3.02 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.18 Per Cum 3259 Three Thousand Eight Hundred Forty Five Rupees and Sixty Two Paise
3.03 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.81 Per Cum 4802 Three Thousand Eight Hundred Eighty Nine Rupees and Sixty Two Paise
3.04 Sq rubble masonary in 1:5 in foundation CSR 12.17 8.76 Per Cum 5318 Forty Six Thousand Five Hundred Eighty Five Rupees and Sixty Eight Paise
3.05 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 14.57 Per Cum 5780 Eighty Four Thousand Two Hundred Fourteen Rupees and Sixty Paise
3.06 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 26.45 Per Sqm 202.7 Five Thousand Three Hundred Sixty One Rupees and Forty One Paise
GST DIFFERNCE 12% TO 18% @5.35%
B. FIELD DROP STRUCTURE-8
3.07 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 5.22 Per Cum 37 One Hundred Ninety Three Rupees and Fourteen Paise
3.08 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.61 Per Cum 3259 One Thousand Nine Hundred Eighty Seven Rupees and Ninety Nine Paise
3.09 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.36 Per Cum 4802 One Thousand Seven Hundred Twenty Eight Rupees and Seventy Two Paise
3.1 Sq rubble masonary in 1:5 in foundation CSR 12.17 4.32 Per Cum 5318 Twenty Two Thousand Nine Hundred Seventy Three Rupees and Seventy Six Paise
3.11 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 4.57 Per Cum 5780 Twenty Six Thousand Four Hundred Fourteen Rupees and Sixty Paise
3.12 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 11.18 Per Sqm 202.7 Two Thousand Two Hundred Sixty Six Rupees and Eighteen Paise
GST DIFFERNCE 12% TO 18% @5.35%
C. FIELD DROP STRUCTURE-9
3.13 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 5.22 Per Cum 37 One Hundred Ninety Three Rupees and Fourteen Paise
3.14 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.61 Per Cum 3259 One Thousand Nine Hundred Eighty Seven Rupees and Ninety Nine Paise
3.15 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.36 Per Cum 4802 One Thousand Seven Hundred Twenty Eight Rupees and Seventy Two Paise
3.16 Sq rubble masonary in 1:5 in foundation CSR 12.17 4.32 Per Cum 5318 Twenty Two Thousand Nine Hundred Seventy Three Rupees and Seventy Six Paise
3.17 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 4.57 Per Cum 5780 Twenty Six Thousand Four Hundred Fourteen Rupees and Sixty Paise
3.18 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 11.18 Per Sqm 202.7 Two Thousand Two Hundred Sixty Six Rupees and Eighteen Paise
GST DIFFERNCE 12% TO 18% @5.35%
D. FIELD DROP STRUCTURE-10
3.19 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 5.22 Per Cum 37 One Hundred Ninety Three Rupees and Fourteen Paise
3.2 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.61 Per Cum 3259 One Thousand Nine Hundred Eighty Seven Rupees and Ninety Nine Paise
3.21 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.36 Per Cum 4802 One Thousand Seven Hundred Twenty Eight Rupees and Seventy Two Paise
3.22 Sq rubble masonary in 1:5 in foundation CSR 12.17 4.32 Per Cum 5318 Twenty Two Thousand Nine Hundred Seventy Three Rupees and Seventy Six Paise
3.23 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 4.57 Per Cum 5780 Twenty Six Thousand Four Hundred Fourteen Rupees and Sixty Paise
3.24 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 11.18 Per Sqm 202.7 Two Thousand Two Hundred Sixty Six Rupees and Eighteen Paise
GST DIFFERNCE 12% TO 18% @5.35%
E. FIELD DROP STRUCTURE-11
3.25 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 5.22 Per Cum 37 One Hundred Ninety Three Rupees and Fourteen Paise
3.26 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.61 Per Cum 3259 One Thousand Nine Hundred Eighty Seven Rupees and Ninety Nine Paise
3.27 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.36 Per Cum 4802 One Thousand Seven Hundred Twenty Eight Rupees and Seventy Two Paise
3.28 Sq rubble masonary in 1:5 in foundation CSR 12.17 4.32 Per Cum 5318 Twenty Two Thousand Nine Hundred Seventy Three Rupees and Seventy Six Paise
3.29 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 4.57 Per Cum 5780 Twenty Six Thousand Four Hundred Fourteen Rupees and Sixty Paise
3.3 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 11.18 Per Sqm 202.7 Two Thousand Two Hundred Sixty Six Rupees and Eighteen Paise
GST DIFFERNCE 12% TO 18% @5.35%
F. FIELD DROP STRUCTURE-12
3.31 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 5.22 Per Cum 37 One Hundred Ninety Three Rupees and Fourteen Paise
3.32 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.61 Per Cum 3259 One Thousand Nine Hundred Eighty Seven Rupees and Ninety Nine Paise
3.33 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.36 Per Cum 4802 One Thousand Seven Hundred Twenty Eight Rupees and Seventy Two Paise
3.34 Sq rubble masonary in 1:5 in foundation CSR 12.17 4.32 Per Cum 5318 Twenty Two Thousand Nine Hundred Seventy Three Rupees and Seventy Six Paise
3.35 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 4.57 Per Cum 5780 Twenty Six Thousand Four Hundred Fourteen Rupees and Sixty Paise
3.36 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 11.18 Per Sqm 202.7 Two Thousand Two Hundred Sixty Six Rupees and Eighteen Paise
GST DIFFERNCE 12% TO 18% @5.35%
4 For Construction of Field Drop Structures 2 to 9 Project Village Hirdapur ,Tehsil & District Rupnagar
Estimate San.No. 1443 Dated 30-01-2026 for Rs. 914700.00/-
A. FIELD DROP STRUCTURE-2
4.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 6.936 Per Cum 37 Two Hundred Fifty Six Rupees and Sixty Three Paise
4.02 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.82 Per Cum 3259 Two Thousand Six Hundred Seventy Two Rupees and Thirty Eight Paise
4.03 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.58 Per Cum 4802 Two Thousand Seven Hundred Eighty Five Rupees and Sixteen Paise
4.04 Sq rubble masonary in 1:5 in foundation CSR 12.17 6 Per Cum 5318 Thirty One Thousand Nine Hundred Eight Rupees and No Paise
4.05 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 4.65 Per Cum 5780 Twenty Six Thousand Eight Hundred Seventy Seven Rupees and No Paise
4.06 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 13.45 Per Sqm 202.7 Two Thousand Seven Hundred Twenty Six Rupees and Thirty One Paise
GST DIFFERNCE 12% TO 18% @5.35%
B. FIELD DROP STRUCTURE-3
4.07 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 6.936 Per Cum 37 Two Hundred Fifty Six Rupees and Sixty Three Paise
4.08 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.82 Per Cum 3259 Two Thousand Six Hundred Seventy Two Rupees and Thirty Eight Paise
4.09 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.58 Per Cum 4802 Two Thousand Seven Hundred Eighty Five Rupees and Sixteen Paise
4.1 Sq rubble masonary in 1:5 in foundation CSR 12.17 6 Per Cum 5318 Thirty One Thousand Nine Hundred Eight Rupees and No Paise
4.11 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 4.65 Per Cum 5780 Twenty Six Thousand Eight Hundred Seventy Seven Rupees and No Paise
4.12 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 13.45 Per Sqm 202.7 Two Thousand Seven Hundred Twenty Six Rupees and Thirty One Paise
GST DIFFERNCE 12% TO 18% @5.35%
C. FIELD DROP STRUCTURE-4
4.13 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 15.02 Per Cum 37 Five Hundred Fifty Five Rupees and Seventy Four Paise
4.14 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.56 Per Cum 3259 Five Thousand Eighty Four Rupees and Four Paise
4.15 C. Conc. (bajri) in 1:2:4 CSR 23.37 1.07 Per Cum 4802 Five Thousand One Hundred Thirty Eight Rupees and Fourteen Paise
4.16 Sq rubble masonary in 1:5 in foundation CSR 12.17 11.68 Per Cum 5318 Sixty Two Thousand One Hundred Fourteen Rupees and Twenty Four Paise
4.17 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 14.96 Per Cum 5780 Eighty Six Thousand Four Hundred Sixty Eight Rupees and Eighty Paise
4.18 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 28.75 Per Sqm 202.7 Five Thousand Eight Hundred Twenty Seven Rupees and Sixty Two Paise
GST DIFFERNCE 12% TO 18% @5.35%
D. FIELD DROP STRUCTURE-5
4.19 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 15.02 Per Cum 37 Five Hundred Fifty Five Rupees and Seventy Four Paise
4.2 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.56 Per Cum 3259 Five Thousand Eighty Four Rupees and Four Paise
4.21 C. Conc. (bajri) in 1:2:4 CSR 23.37 1.07 Per Cum 4802 Five Thousand One Hundred Thirty Eight Rupees and Fourteen Paise
4.22 Sq rubble masonary in 1:5 in foundation CSR 12.17 11.68 Per Cum 5318 Sixty Two Thousand One Hundred Fourteen Rupees and Twenty Four Paise
4.23 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 14.96 Per Cum 5780 Eighty Six Thousand Four Hundred Sixty Eight Rupees and Eighty Paise
4.24 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 28.75 Per Sqm 202.7 Five Thousand Eight Hundred Twenty Seven Rupees and Sixty Two Paise
GST DIFFERNCE 12% TO 18% @5.35%
E. FIELD DROP STRUCTURE-6
4.25 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.58 Per Cum 37 Three Hundred Ninety One Rupees and Forty Six Paise
4.26 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.98 Per Cum 3259 Six Thousand Four Hundred Fifty Two Rupees and Eighty Two Paise
4.27 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.83 Per Cum 4802 Three Thousand Nine Hundred Eighty Five Rupees and Sixty Six Paise
4.28 Sq rubble masonary in 1:5 in foundation CSR 12.17 8.01 Per Cum 5318 Forty Two Thousand Five Hundred Ninety Seven Rupees and Eighteen Paise
4.29 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 9.42 Per Cum 5780 Fifty Four Thousand Four Hundred Forty Seven Rupees and Sixty Paise
4.3 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 20.71 Per Sqm 202.7 Four Thousand One Hundred Ninety Seven Rupees and Ninety One Paise
GST DIFFERNCE 12% TO 18% @5.35%
F. FIELD DROP STRUCTURE-7
4.31 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.58 Per Cum 37 Three Hundred Ninety One Rupees and Forty Six Paise
4.32 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.98 Per Cum 3259 Six Thousand Four Hundred Fifty Two Rupees and Eighty Two Paise
4.33 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.83 Per Cum 4802 Three Thousand Nine Hundred Eighty Five Rupees and Sixty Six Paise
4.34 Sq rubble masonary in 1:5 in foundation CSR 12.17 8.01 Per Cum 5318 Forty Two Thousand Five Hundred Ninety Seven Rupees and Eighteen Paise
4.35 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 9.42 Per Cum 5780 Fifty Four Thousand Four Hundred Forty Seven Rupees and Sixty Paise
4.36 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 20.71 Per Sqm 202.7 Four Thousand One Hundred Ninety Seven Rupees and Ninety One Paise
GST DIFFERNCE 12% TO 18% @5.35%
G. FIELD DROP STRUCTURE-8
4.37 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.58 Per Cum 37 Three Hundred Ninety One Rupees and Forty Six Paise
4.38 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.98 Per Cum 3259 Six Thousand Four Hundred Fifty Two Rupees and Eighty Two Paise
4.39 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.83 Per Cum 4802 Three Thousand Nine Hundred Eighty Five Rupees and Sixty Six Paise
4.4 Sq rubble masonary in 1:5 in foundation CSR 12.17 8.01 Per Cum 5318 Forty Two Thousand Five Hundred Ninety Seven Rupees and Eighteen Paise
4.41 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 9.42 Per Cum 5780 Fifty Four Thousand Four Hundred Forty Seven Rupees and Sixty Paise
4.42 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 20.71 Per Sqm 202.7 Four Thousand One Hundred Ninety Seven Rupees and Ninety One Paise
GST DIFFERNCE 12% TO 18% @5.35%
H. FIELD DROP STRUCTURE-9
4.43 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 6.936 Per Cum 37 Two Hundred Fifty Six Rupees and Sixty Three Paise
4.44 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 0.82 Per Cum 3259 Two Thousand Six Hundred Seventy Two Rupees and Thirty Eight Paise
4.45 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.58 Per Cum 4802 Two Thousand Seven Hundred Eighty Five Rupees and Sixteen Paise
4.46 Sq rubble masonary in 1:5 in foundation CSR 12.17 6 Per Cum 5318 Thirty One Thousand Nine Hundred Eight Rupees and No Paise
4.47 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 4.65 Per Cum 5780 Twenty Six Thousand Eight Hundred Seventy Seven Rupees and No Paise
4.48 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 13.45 Per Sqm 202.7 Two Thousand Seven Hundred Twenty Six Rupees and Thirty One Paise
GST DIFFERNCE 12% TO 18% @5.35%
5 For Construction of Field Drop Structures 1 to 5 Project Village Babani ,Tehsil & District Rupnagar
Estimate San.No. 1664 Dated 03-02-2026 for Rs. 752300.00/-
A. FIELD DROP STRUCTURE-1
5.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 14.14 Per Cum 37 Five Hundred Twenty Three Rupees and Eighteen Paise
5.02 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.56 Per Cum 3259 Five Thousand Eighty Four Rupees and Four Paise
5.03 C. Conc. (bajri) in 1:2:4 CSR 23.37 1.07 Per Cum 4802 Five Thousand One Hundred Thirty Eight Rupees and Fourteen Paise
5.04 Sq rubble masonary in 1:5 in foundation CSR 12.17 11.68 Per Cum 5318 Sixty Two Thousand One Hundred Fourteen Rupees and Twenty Four Paise
5.05 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 14.9 Per Cum 5780 Eighty Six Thousand One Hundred Twenty Two Rupees and No Paise
5.06 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 28.05 Per Sqm 202.7 Five Thousand Six Hundred Eighty Five Rupees and Seventy Three Paise
GST DIFFERNCE 12% TO 18% @5.35%
B. FIELD DROP STRUCTURE-2
5.07 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 16.54 Per Cum 37 Six Hundred Eleven Rupees and Ninety Eight Paise
5.08 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.76 Per Cum 3259 Five Thousand Seven Hundred Thirty Five Rupees and Eighty Four Paise
5.09 C. Conc. (bajri) in 1:2:4 CSR 23.37 1.13 Per Cum 4802 Five Thousand Four Hundred Twenty Six Rupees and Twenty Six Paise
5.1 Sq rubble masonary in 1:5 in foundation CSR 12.17 13.88 Per Cum 5318 Seventy Three Thousand Eight Hundred Thirteen Rupees and Eighty Four Paise
5.11 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 19.6 Per Cum 5780 One Hundred Thirteen Thousand Two Hundred Eighty Eight Rupees and No Paise
5.12 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 33.3 Per Sqm 202.7 Six Thousand Seven Hundred Forty Nine Rupees and Ninety One Paise
GST DIFFERNCE 12% TO 18% @5.35%
C. FIELD DROP STRUCTURE-3
5.13 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 9.44 Per Cum 37 Three Hundred Forty Nine Rupees and Twenty Eight Paise
5.14 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.76 Per Cum 3259 Five Thousand Seven Hundred Thirty Five Rupees and Eighty Four Paise
5.15 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.86 Per Cum 4802 Four Thousand One Hundred Twenty Nine Rupees and Seventy Two Paise
5.16 Sq rubble masonary in 1:5 in foundation CSR 12.17 8.01 Per Cum 5318 Forty Two Thousand Five Hundred Ninety Seven Rupees and Eighteen Paise
5.17 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 9.95 Per Cum 5780 Fifty Seven Thousand Five Hundred Eleven Rupees and No Paise
5.18 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 21.2 Per Sqm 202.7 Four Thousand Two Hundred Ninety Seven Rupees and Twenty Four Paise
GST DIFFERNCE 12% TO 18% @5.35%
D. FIELD DROP STRUCTURE-4
5.19 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 9.44 Per Cum 37 Three Hundred Forty Nine Rupees and Twenty Eight Paise
5.2 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.76 Per Cum 3259 Five Thousand Seven Hundred Thirty Five Rupees and Eighty Four Paise
5.21 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.86 Per Cum 4802 Four Thousand One Hundred Twenty Nine Rupees and Seventy Two Paise
5.22 Sq rubble masonary in 1:5 in foundation CSR 12.17 8.01 Per Cum 5318 Forty Two Thousand Five Hundred Ninety Seven Rupees and Eighteen Paise
5.23 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 9.95 Per Cum 5780 Fifty Seven Thousand Five Hundred Eleven Rupees and No Paise
5.24 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 21.2 Per Sqm 202.7 Four Thousand Two Hundred Ninety Seven Rupees and Twenty Four Paise
GST DIFFERNCE 12% TO 18% @5.35%
E. FIELD DROP STRUCTURE-5
5.25 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 9.44 Per Cum 37 Three Hundred Forty Nine Rupees and Twenty Eight Paise
5.26 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 1.76 Per Cum 3259 Five Thousand Seven Hundred Thirty Five Rupees and Eighty Four Paise
5.27 C. Conc. (bajri) in 1:2:4 CSR 23.37 0.86 Per Cum 4802 Four Thousand One Hundred Twenty Nine Rupees and Seventy Two Paise
5.28 Sq rubble masonary in 1:5 in foundation CSR 12.17 8.01 Per Cum 5318 Forty Two Thousand Five Hundred Ninety Seven Rupees and Eighteen Paise
5.28 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 9.95 Per Cum 5780 Fifty Seven Thousand Five Hundred Eleven Rupees and No Paise
5.3 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 21.2 Per Sqm 202.7 Four Thousand Two Hundred Ninety Seven Rupees and Twenty Four Paise
GST DIFFERNCE 12% TO 18% @5.35%
6 For Construction of Crate Wire Structures 16 to 21 Project Village Kakot ,Tehsil & District Rupnagar
Estimate San.No. 3924 Dated 03-02-2026 for Rs. 366600.00/-
A. CRATE WIRE STRUCTURE-16
6.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.5 Per Cum 37 Three Hundred Eighty Eight Rupees and Fifty Paise
6.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.5 Per Sqm 187 Sixteen Thousand Five Hundred Forty Nine Rupees and Fifty Paise
6.03 Spreading of wire crates as per PWD specifications CSR 23.37 88.5 Per Sqm 70 Six Thousand One Hundred Ninety Five Rupees and No Paise
6.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 25.2 Per Cum 1384 Thirty Four Thousand Eight Hundred Seventy Six Rupees and Eighty Paise
GST DIFFERNCE 12% TO 18% @5.35%
B. CRATE WIRE STRUCTURE-17
6.05 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.5 Per Cum 37 Three Hundred Eighty Eight Rupees and Fifty Paise
6.06 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.5 Per Sqm 187 Sixteen Thousand Five Hundred Forty Nine Rupees and Fifty Paise
6.06 Spreading of wire crates as per PWD specifications CSR 23.37 88.5 Per Sqm 70 Six Thousand One Hundred Ninety Five Rupees and No Paise
6.07 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 25.2 Per Cum 1384 Thirty Four Thousand Eight Hundred Seventy Six Rupees and Eighty Paise
GST DIFFERNCE 12% TO 18% @5.35%
C. CRATE WIRE STRUCTURE-18
6.09 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.5 Per Cum 37 Three Hundred Eighty Eight Rupees and Fifty Paise
6.1 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.5 Per Sqm 187 Sixteen Thousand Five Hundred Forty Nine Rupees and Fifty Paise
6.11 Spreading of wire crates as per PWD specifications CSR 23.37 88.5 Per Sqm 70 Six Thousand One Hundred Ninety Five Rupees and No Paise
6.12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 25.2 Per Cum 1384 Thirty Four Thousand Eight Hundred Seventy Six Rupees and Eighty Paise
GST DIFFERNCE 12% TO 18% @5.35%
D. CRATE WIRE STRUCTURE-19
6.13 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.5 Per Cum 37 Three Hundred Eighty Eight Rupees and Fifty Paise
6.14 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.5 Per Sqm 187 Sixteen Thousand Five Hundred Forty Nine Rupees and Fifty Paise
6.15 Spreading of wire crates as per PWD specifications CSR 23.37 88.5 Per Sqm 70 Six Thousand One Hundred Ninety Five Rupees and No Paise
6.16 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 25.2 Per Cum 1384 Thirty Four Thousand Eight Hundred Seventy Six Rupees and Eighty Paise
GST DIFFERNCE 12% TO 18% @5.35%
E. CRATE WIRE STRUCTURE-20
6.17 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.5 Per Cum 37 Three Hundred Eighty Eight Rupees and Fifty Paise
6.18 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.5 Per Sqm 187 Sixteen Thousand Five Hundred Forty Nine Rupees and Fifty Paise
6.19 Spreading of wire crates as per PWD specifications CSR 23.37 88.5 Per Sqm 70 Six Thousand One Hundred Ninety Five Rupees and No Paise
6.2 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 25.2 Per Cum 1384 Thirty Four Thousand Eight Hundred Seventy Six Rupees and Eighty Paise
GST DIFFERNCE 12% TO 18% @5.35%
F. CRATE WIRE STRUCTURE-21
6.21 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.5 Per Cum 37 Three Hundred Eighty Eight Rupees and Fifty Paise
6.22 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.5 Per Sqm 187 Sixteen Thousand Five Hundred Forty Nine Rupees and Fifty Paise
6.23 Spreading of wire crates as per PWD specifications CSR 23.37 88.5 Per Sqm 70 Six Thousand One Hundred Ninety Five Rupees and No Paise
6.24 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 25.2 Per Cum 1384 Thirty Four Thousand Eight Hundred Seventy Six Rupees and Eighty Paise
GST DIFFERNCE 12% TO 18% @5.35%
7 For Construction of Stone Masonary Water Recharging Structures 7 to 8 and Crate Wire Structures 28 to 34 Project Village Majri,Tehsil & District Rupnagar
Estimate San.No. 3397 Dated 16-02-2026 for Rs. 1498900.00/-
A. STONE MASONARY WATER RECHARGING STRUCTURE-7
7.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 50.53 Per Cum 38.98 One Thousand Nine Hundred Sixty Nine Rupees and Sixty Five Paise
7.02 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 7.86 Per Cum 3433.35 Twenty Six Thousand Nine Hundred Eighty Six Rupees and Thirteen Paise
7.03 C. Conc. (bajri) in 1:2:4 CSR 23.37 2.876 Per Cum 5058.98 Fourteen Thousand Five Hundred Fifty Rupees and Eighty Nine Paise 14550.89
7.04 Sq rubble masonary in 1:5 in foundation CSR 12.17 35.27 Per Cum 5602.51 One Hundred Ninety Seven Thousand Seven Hundred Twelve Rupees and Fifty Eight Paise 197712.58
7.05 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 68.18 Per Cum 6089.23 Four Hundred Fifteen Thousand One Hundred Sixty Three Rupees and Seventy Paise
7.06 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 80.78 Per Sqm 213.54 Seventeen Thousand Two Hundred Forty Nine Rupees and Seventy Six Paise
7.07 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 26 Per Sqm 197 Five Thousand One Hundred Twenty Two Rupees and No Paise
7.08 Spreading of wire crates as per PWD specifications CSR 23.37 26 Per Sqm 73.75 One Thousand Nine Hundred Seventeen Rupees and Fifty Paise
7.09 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 6 Per Cum 1458.04 Eight Thousand Seven Hundred Forty Eight Rupees and Twenty Four Paise
B. STONE MASONARY WATER RECHARGING STRUCTURE-8
7.1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 36.52 Per Cum 38.98 One Thousand Four Hundred Twenty Three Rupees and Fifty Four Paise
7.11 C. Conc. (gatka) in Foundation in 1:8:16 CSR 10.8 5.49 Per Cum 3433.35 Eighteen Thousand Eight Hundred Forty Nine Rupees and Nine Paise
7.12 C. Conc. (bajri) in 1:2:4 CSR 23.37 1.85 Per Cum 5058.98 Nine Thousand Three Hundred Fifty Eight Rupees and Ninety Seven Paise 9358.97
7.13 Sq rubble masonary in 1:5 in foundation CSR 12.17 25.16 Per Cum 5602.51 One Hundred Forty Thousand Nine Hundred Fifty Nine Rupees and Fifteen Paise 140959.15
7.14 Sq rubble masonary in 1:5 Super Structure CSR 12.17 & 12.25 33.03 Per Cum 6089.23 Two Hundred One Thousand One Hundred Twenty Seven Rupees and Twenty Six Paise
7.15 12.5 mm thick cement sand plaster in 1:4 CSR 15.9 46.41 Per Sqm 213.54 Nine Thousand Nine Hundred Ten Rupees and Thirty Nine Paise
7.16 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 22 Per Sqm 197 Four Thousand Three Hundred Thirty Four Rupees and No Paise
7.17 Spreading of wire crates as per PWD specifications CSR 23.37 22 Per Sqm 73.75 One Thousand Six Hundred Twenty Two Rupees and Fifty Paise
7.18000000000001 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 5 Per Cum 1458.04 Seven Thousand Two Hundred Ninety Rupees and Twenty Paise
C. CRATE WIRE STRUCTURE-28
7.19 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 8.75 Per Cum 38.98 Three Hundred Forty One Rupees and Seven Paise
7.2 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.7 Per Sqm 197 Seventeen Thousand Four Hundred Seventy Three Rupees and Ninety Paise
7.21 Spreading of wire crates as per PWD specifications CSR 23.37 88.7 Per Sqm 73.75 Six Thousand Five Hundred Forty One Rupees and Sixty Two Paise
7.22 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 30.15 Per Cum 1458.04 Forty Three Thousand Nine Hundred Fifty Nine Rupees and Ninety Paise
D. CRATE WIRE STRUCTURE-29
7.19 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 14 Per Cum 38.98 Five Hundred Forty Five Rupees and Seventy Two Paise
7.2 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.25 Per Sqm 197 Seventeen Thousand Three Hundred Eighty Five Rupees and Twenty Five Paise
7.21 Spreading of wire crates as per PWD specifications CSR 23.37 88.25 Per Sqm 73.75 Six Thousand Five Hundred Eight Rupees and Forty Three Paise
7.22 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 27.13 Per Cum 1458.04 Thirty Nine Thousand Five Hundred Fifty Six Rupees and Sixty Two Paise
E. CRATE WIRE STRUCTURE-30
7.23 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10 Per Cum 38.98 Three Hundred Eighty Nine Rupees and Eighty Paise
7.24 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 22 Per Sqm 197 Four Thousand Three Hundred Thirty Four Rupees and No Paise
7.25 Spreading of wire crates as per PWD specifications CSR 23.37 22 Per Sqm 73.75 One Thousand Six Hundred Twenty Two Rupees and Fifty Paise
7.26 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 10 Per Cum 1458.04 Fourteen Thousand Five Hundred Eighty Rupees and Forty Paise
F. CRATE WIRE STRUCTURE-31
7.27 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 14 Per Cum 38.98 Five Hundred Forty Five Rupees and Seventy Two Paise
7.28 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.25 Per Sqm 197 Seventeen Thousand Three Hundred Eighty Five Rupees and Twenty Five Paise
7.29 Spreading of wire crates as per PWD specifications CSR 23.37 88.25 Per Sqm 73.75 Six Thousand Five Hundred Eight Rupees and Forty Three Paise
7.3 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 27.13 Per Cum 1458.04 Thirty Nine Thousand Five Hundred Fifty Six Rupees and Sixty Two Paise
G. CRATE WIRE STRUCTURE-32
7.31 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 14 Per Cum 38.98 Five Hundred Forty Five Rupees and Seventy Two Paise
7.32 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.25 Per Sqm 197 Seventeen Thousand Three Hundred Eighty Five Rupees and Twenty Five Paise
7.33 Spreading of wire crates as per PWD specifications CSR 23.37 88.25 Per Sqm 73.75 Six Thousand Five Hundred Eight Rupees and Forty Three Paise
7.34 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 27.13 Per Cum 1458.04 Thirty Nine Thousand Five Hundred Fifty Six Rupees and Sixty Two Paise
G. CRATE WIRE STRUCTURE-33
7.35 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 14 Per Cum 38.98 Five Hundred Forty Five Rupees and Seventy Two Paise
7.36 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.25 Per Sqm 197 Seventeen Thousand Three Hundred Eighty Five Rupees and Twenty Five Paise
7.37 Spreading of wire crates as per PWD specifications CSR 23.37 88.25 Per Sqm 73.75 Six Thousand Five Hundred Eight Rupees and Forty Three Paise
7.38 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 27.13 Per Cum 1458.04 Thirty Nine Thousand Five Hundred Fifty Six Rupees and Sixty Two Paise
H. CRATE WIRE STRUCTURE-34
7.35 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 14 Per Cum 38.98 Five Hundred Forty Five Rupees and Seventy Two Paise
7.36 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.25 Per Sqm 197 Seventeen Thousand Three Hundred Eighty Five Rupees and Twenty Five Paise
7.37 Spreading of wire crates as per PWD specifications CSR 23.37 88.25 Per Sqm 73.75 Six Thousand Five Hundred Eight Rupees and Forty Three Paise
7.38 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 27.13 Per Cum 1458.04 Thirty Nine Thousand Five Hundred Fifty Six Rupees and Sixty Two Paise
8 For Construction of Stone Massonry Water Recharging/Harvesting Structure ,Crate Wire Structures/Retaining Walls No.1 & 2, Project Village Bada Pind,Tehsil & District Rupnagar
Estimate San.No. 3735 Dated 19-01-2026 for Rs. 562800/-
A. STONE MASONARY WATER RECARGING STRUCTURE (Scheme - PMKSY WDC 2.0)
1.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 22.88 Per Cum 38.98 Nine Hundred Fourteen Rupees and Eighty Six Paise
1.02 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6 b (ii) as per PWD specifications. 3.28 Per Cum 3433.35 Twelve Thousand Nine Hundred Forty Three Rupees and Seventy Two Paise
1.03 Squared Rubbled Masonary 1:5 Below Ground Level and Below Plinth Level CSR 12.17 12.6 Per Cum 5602.51 Seventy Three Thousand One Hundred Sixty Eight Rupees and Seventy Eight Paise
1.04 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 as per PWD specifications. 13.67 Per Cum 6089.23 Eighty Nine Thousand Eighty Five Rupees and Forty Three Paise
1.05 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a (ii) as per PWD specifications. 1.16 Per Cum 5058.9 Six Thousand Twenty Rupees and Nine Paise
1.06 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. CSR 15.9 23.85 Per Sqm 213.54 Five Thousand Ninety Two Rupees and Ninety Two Paise
1.07 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 26 Per Sqm 197 Five Thousand One Hundred Twenty Two Rupees and No Paise
1.08 Spreading of wire crates as per PWD specifications CSR 23.37 26 Per Sqm 73.75 One Thousand Nine Hundred Seventeen Rupees and Fifty Paise
1.09 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 6 Per Cum 1458.04 Eight Thousand Seven Hundred Forty Eight Rupees and Twenty Four Paise
8 For Construction of Crate Wire Structures/Retaining Walls No. 1 & 2 Project Village Bada Pind,Tehsil & District Rupnagar
B. Crate Wire Structure/Retaining Wall no. 1 (Scheme - PMKSY WDC 2.0)
2.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 36 Per Cum 37 One Thousand Three Hundred Thirty Two Rupees and No Paise
2.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 251.8 Per Cum 187 Forty Seven Thousand Eighty Six Rupees and Sixty Paise
2.03 Spreading of wire crates as per PWD specifications CSR 23.37 251.8 Per Cum 70 Seventeen Thousand Six Hundred Twenty Six Rupees and No Paise
2.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 79.2 Per Cum 1384 One Hundred Nine Thousand Six Hundred Twelve Rupees and Eighty Paise
GST DIFFERNCE 12% TO 18% @5.35%
Final Sanctioned Amount
B. Crate Wire Structure/Retaining Wall no. 2 (Scheme - PMKSY WDC 2.0)
2.05 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 36 Per Cum 37 One Thousand Three Hundred Thirty Two Rupees and No Paise
2.06 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 251.8 Per Cum 187 Forty Seven Thousand Eighty Six Rupees and Sixty Paise
2.07 Spreading of wire crates as per PWD specifications CSR 23.37 251.8 Per Cum 70 Seventeen Thousand Six Hundred Twenty Six Rupees and No Paise
2.08 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 79.2 Per Cum 1384 One Hundred Nine Thousand Six Hundred Twelve Rupees and Eighty Paise
GST DIFFERNCE 12% TO 18% @5.35%
SUB TOTAL OF CWS/Rt. Wall no. 1 & 2
Stone Massonry Water Recharging Structure Total
Grand TOTAL SAY as per estimate 562800
9 For Construction of Stone Masonary Water recharging Project Village Chhoti Makori ,Tehsil & District Rupnagar
Estimate San.No. 194/D.B. Dated 17-04-2026 for Rs. 326100/-
A. STONE MASONARY WATER RECARGING STRUCTURE(Scheme - SWC-37)
1.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 35.76 Per Cum 38.98 One Thousand Three Hundred Ninety Three Rupees and Ninety Two Paise
1.02 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6 b (ii) as per PWD specifications. 5.26 Per Cum 3433.35 Eighteen Thousand Fifty Nine Rupees and Forty Two Paise
1.03 Squared Rubbled Masonary 1:5 Below Ground Level and Below Plinth Level CSR 12.17 30.29 Per Cum 5602.51 One Hundred Sixty Nine Thousand Seven Hundred Rupees and Two Paise
1.04 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 as per PWD specifications. 17.09 Per Cum 6089.23 One Hundred Four Thousand Sixty Four Rupees and Ninety Four Paise
1.05 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a (ii) as per PWD specifications. 1.66 Per Cum 5058.9 Eight Thousand Three Hundred Ninety Seven Rupees and Seventy Seven Paise
1.06 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. CSR 15.9 33.75 Per Sqm 213.54 Seven Thousand Two Hundred Six Rupees and Ninety Seven Paise
1.07 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 26 Per Sqm 197 Five Thousand One Hundred Twenty Two Rupees and No Paise
1.08 Spreading of wire crates as per PWD specifications CSR 23.37 26 Per Sqm 73.75 One Thousand Nine Hundred Seventeen Rupees and Fifty Paise
1.09 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 6 Per Cum 1458.04 Eight Thousand Seven Hundred Forty Eight Rupees and Twenty Four Paise
Project Detail Painting Charges 1500
10.0 - Name of Work :- Stone Masonary Water Recharging Structure Project No.1, Village - Sanana ,Tehsil and Distt.- Rupnagar ,Punjab
Estimate sanction No 4451 dated 10.03.2026 amount 2072200/-
A. Labour Cost of Stone Masonary Water Recharging Structure
SCHEME :- SWC-37
Sno. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earthwork Excavation in foundation 91.39 cum 37 Thirty Seven only
2 C.Conc.(gatka) in foundation in1:8:16 13.74 cum 3259 Three Thousand Two Hundred Fifty Nine only
3 C.Conc.(Bajri) in1:2:4 4.375 cum 4802 Four Thousand Eigth Hundred Two only
4 Sq rubble masonry in 1:5 in foundation 63.48 cum 5318 Five Thousand Three Hundred Eighteen only
5 Sq rubble masonry in 1:5 above foundation 0.399 cum 5780 Five Thousand Seven Hundred Eighty only
6 12.5 mm thick cement sand plaster in 1:4 96.14 sqm 202.7 Two Hundred Two Rupees and Seventy paise only
7 Waving of net including binding the sides make crate of 15 cm x 15 cm 50 sqm 187 One Hundred Eighty Seven only
8 Spreding of wire net over pitching 50 sqm 70 Seventy only
9 inclding stone intothe crest hand pitching 12 cum 1384 One Thousand Three Hundred Eighty Four only
GST diffrence of 12 to 18 Percent @ 5.35%
Total Abstract cost of Labour charges
1.0 - Name of Work :- Stone Masonary Water Recharging Structure Project No.2, Village - Sanana ,Tehsil and Distt.- Rupnagar ,Punjab
A. Labour Cost of Stone Masonary Water Recharging Structure
B SCHEME :- SWC-37
Sno. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earthwork Excavation in foundation 80.55 cum 37 Thirty Seven only
2 C.Conc.(gatka) in foundation in1:8:16 12.38 cum 3259 Three Thousand Two Hundred Fifty Nine only
3 C.Conc.(Bajri) in1:2:4 0.999 cum 4802 Four Thousand Eigth Hundred Two only
4 Sq rubble masonry in 1:5 in foundation 56 cum 5318 Five Thousand Three Hundred Eighteen only
5 Sq rubble masonry in 1:5 above foundation 0.399 cum 5780 Five Thousand Seven Hundred Eighty only
6 12.5 mm thick cement sand plaster in 1:4 84.54 sqm 202.7 Two Hundred Two Rupees and Seventy paise only
7 Waving of net including binding the sides make crate of 15 cm x 15 cm 42 sqm 187 One Hundred Eighty Seven only
8 Spreding of wire net over pitching 42 sqm 70 Seventy only
9 inclding stone intothe crest hand pitching 10 cum 1384 One Thousand Three Hundred Eighty Four only
GST diffrence of 12 to 18 Percent @ 5.35%
Total Abstract cost of Labour charges
Grand total 2072285
SAY asper estimate 2072200
11 Stone Masonary Water recharging Project Village Bhangala,Tehsil & District Rupnagar
Estimate San.No. 699/D.B. Dated 11.05.2026 for Rs. 674500/-
A. STONE MASONARY WATER RECARGING STRUCTURE(Scheme - WDC PMKSY 2.0)
1.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 50.5 Per Cum 38.98 One Thousand Three Hundred Ninety Three Rupees and Ninety Two Paise
1.02 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6 b (ii) as per PWD specifications. 7.8 Per Cum 3433.35 Eighteen Thousand Fifty Nine Rupees and Forty Two Paise
1.03 Squared Rubbled Masonary 1:5 Below Ground Level and Below Plinth Level CSR 12.17 53.37 Per Cum 5602.51 One Hundred Sixty Nine Thousand Seven Hundred Rupees and Two Paise
1.04 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 as per PWD specifications. 49.45 Per Cum 6089.23 One Hundred Four Thousand Sixty Four Rupees and Ninety Four Paise
1.05 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a (ii) as per PWD specifications. 2.635 Per Cum 5058.9 Eight Thousand Three Hundred Ninety Seven Rupees and Seventy Seven Paise
1.06 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. CSR 15.9 77.54 Per Sqm 213.54 Seven Thousand Two Hundred Six Rupees and Ninety Seven Paise
1.07 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 26 Per Sqm 197 Five Thousand One Hundred Twenty Two Rupees and No Paise
1.08 Spreading of wire crates as per PWD specifications CSR 23.37 26 Per Sqm 73.75 One Thousand Nine Hundred Seventeen Rupees and Fifty Paise
1.09 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 6 Per Cum 1458.04 Eight Thousand Seven Hundred Forty Eight Rupees and Twenty Four Paise
GRAND TOTAL of All Projects
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
StandardDNIT.pdf
Tender Documents • 0.51 MB
Financial_Bid.xls
Additional Documents • 0.12 MB
Download all tender documents and submit your bid