Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC MANSA | MANSA | MANSA | PUNJAB | ₹1.2 Cr | L1 | Accepted-AOC accepted |
| 2 | L2₹1.2 Cr+₹1.6 L (1.35%)Rejected-AOC MANSA | MANSA | MANSA | PUNJAB | ₹1.2 Cr+₹1.6 L (1.35%) | L2 | Rejected-AOC rejected |
| 3 | L3₹1.2 Cr+₹2.0 L (1.77%)Rejected-AOC BASEMENT FLOOR SHOP NO 90 NEW GRAIN MARKET SIRSA ROAD MANSA | MANSA | MANSA | PUNJAB | ₹1.2 Cr+₹2.0 L (1.77%) | L3 | Rejected-AOC rejected |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
27 Feb 2026, 10:00 amClosed
Executive Engineer
Executive Engineer Provincaial Division PWD B and R Mansa
Construction of URBAN PHC Non 24x7 at Bhikhi Distt Mansa
2026_CEPW_160262_4
PWD/MSA/2025-26/36
Open Tender
Civil Works - Buildings
Percentage
180 days
Boha
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Yes
₹2.6 L
Yes
24 Mar 2026
14 Feb 2026
27 Feb 2026
14 Feb 2026
27 Feb 2026
14 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Works | - | - | - | - |
| 2 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. and Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres | 1 | Cum | 102.19 | ₹102.09 |
| 3 | Cement concrete 1:5:10 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type | - | Cum | 4,435.6 | - |
| 4 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | - | sqm | 221.24 | - |
| 5 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | - | Cum | 6,449.64 | - |
| 6 | First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 1 | Cum | 5,915.91 | ₹5,909.99 |
| 7 | Centering and shuttering for columns (Square or rectangular or poly gonal in plain) | - | sqm | 502.52 | - |
| 8 | Extra rate for shuttering in each subsequent storey above the first. Storey work done in subsequent storey above the first storey up to height of 4 metres or part thereof up to the roof top level of that storey. For First Story | 1 | sqm | 10.54 | ₹10.53 |
| 9 | Second Floor | - | sqm | 21.07 | - |
| 10 | Centering and shuttering for sides and soffits of beam, beams, launching girders, bressumers, lintels. | 1 | sqm | 400.33 | ₹399.93 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
sbdbhikhi_compressed.pdf
Tender Documents • 19.08 MB
BOQ_325364.xls
BOQ • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .