| Sl No | Description | Qty | Unit | A P CONSTRUCTIONS L1 | R SABEER ALI L2 |
|---|---|---|---|---|---|
| 1.01 | Milling the existing BT surface 5 to 7 cm depth charges for cutting the BT surface to 5 to 7 cm depth using milling machine, conveying the milled waste materials to atleast for 20 km distance including hore and running charges for the machine, conveyance charges, unloading at unobjection able place, cleaning the milled surface as to avoid slippery including all ot her incidental and unforeseen item etc. complete as per the direction of the departmental officers | 13,629 | M2 | 86.9 ₹11,84,360.1 Lowest | 93 ₹12,67,497 |
| 2.01 | Providing and laying tack coat of 2.0 kgs/10 sqm over the Prime surface treated with binder using 2.0 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 24,291 | M2 | 24.5 ₹5,95,129.5 Lowest | 26 ₹6,31,566 |
| 3.01 | Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. | 534 | M3 | 9,390 ₹50,14,260 Lowest | 10,047 ₹53,65,098 |
| 4.01 | Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below metal with 45.27 kgs bituminous 60/70 and 5.03kg of plastic waste (Total 50.30kg) bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 729 | M3 | 9,657.5 ₹70,40,338.75 Lowest | 10,334 ₹75,33,508.73 |
| 5.01 | Provision For GST 18% | 1 | LS | 24,90,135.9 ₹24,90,135.9 Lowest | 26,63,580.55 ₹26,63,580.55 |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
30 Jun 2023, 3:00 pmClosed
commissioner, cumbum municipality
Commissioner, cumbum municipality
Improvement of B.T Surface at122007R039- Vivekanandar Main Street E To W ,122002R065-Continue kurangumayan street Junction to Padippagam Road ,122002R061-Continue Ulagathevar 1st Street 3rd Cross ,122002R059-ULAGA THEVAR 1ST STREET ,122003R066-Kurang
2023_MAWS_328382_1
384/2023/E1
Open Tender
Civil Works - Roads
Item Rate
commissioner cumbum municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.7 L
Yes
cumbum
3 Jul 2023
16 Jun 2023
30 Jun 2023
16 Jun 2023
30 Jun 2023
16 Jun 2023
22 Jun 2023
Amount
Milling the existing BT surface 5 to 7 cm depth charges for cutting the BT surface to 5 to 7 cm depth using milling machine, conveying the milled waste materials to atleast for 20 km distance including hore and running charges for the machine, conveyance charges, unloading at unobjection able place, cleaning the milled surface as to avoid slippery including all ot her incidental and unforeseen item etc. complete as per the direction of the departmental officers
Providing and laying tack coat of 2.0 kgs/10 sqm over the Prime surface treated with binder using 2.0 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below metal with 45.27 kgs bituminous 60/70 and 5.03kg of plastic waste (Total 50.30kg) bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Provision For GST 18%
R SABEER ALI
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 0.71 MB
BOQ_389666.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .