Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 LAccepted-AOC STATION ROAD P O UKHRA DIST BURDWAN PIN 713363 W B | UKHRA | BURDWAN | WEST BENGAL | 713363 | ₹2.2 L | 1 | Accepted-AOC Eligible L-1 Bidder |
| 2 | 2₹2.3 L+₹11,888.70 (5.53%)Rejected-Finance RADHANAGAR VILLAGE PO SUNDERCHAK DIST PASCHIM BURDWAN PIN 713360 | PASCHIM BARDHAMAN | WEST BENGAL | 713360 | ₹2.3 L+₹11,888.70 (5.53%) | 2 | Rejected-Finance Quoted Rate more than L-1 Bidder |
| 3 | 3₹2.4 L+₹20,269.75 (9.42%)Rejected-Finance GOPALMATH DURGAPUR DIST PASCHIM BARDHAMAN PIN 713217 W B | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713217 | ₹2.4 L+₹20,269.75 (9.42%) | 3 | Rejected-Finance Quoted Rate more than L-1 Bidder |
Tender Value
₹2.0 L
EMD Value
₹2,600
Closing Date
28 Nov 2023, 5:00 pmClosed
AE EnM
Sonepur Bazari Area
Shifting of LT lines in Bhaluka along with transformer and tower shifting in mines at Sonepur Bazari Project
2023_ECL_293209_1
GM/SBA/EnM/e-tender/23-24/272
Open Tender
Electrical and Maintenance Works
Item Rate
21 days
Sonepur Bazari Area
Please refer tender documents
6 documents required · 6 mandatory
₹2,600
17 Jan 2024
17 Nov 2023
30 Nov 2023
18 Nov 2023
28 Nov 2023
18 Nov 2023
18 Nov 2023 - 21 Nov 2023
Amount
Item Description/ Heading
Material Cost
Erection of 9/12 m S T Pole
Supply and fixing of nut bolt washer.
Dismantling, shifting of 6.6KV/220V LT transformer and re installation at another DP feeder 12, feeder 14, feeder 09
Installation of 6.6KV/400A 3 post GOS
Shifting of telescopic tower
Dismantling and refitting 230V, 250/400W light complete set
Making earth pit supply of all required material
Labour Cost:-
Erection of 9/12 m S T Pole
Fixing of MS Bracket
Fixing of Shackle insulator
Drawing of ACSR rabbit conductor
Supply and fixing of nut bolt washer.
Dismantling, shifting of 6.6KV/220V LT transformer and re installation at another DP feeder 12, feeder 14, feeder 09
Installation of 6.6KV/400A 3 post GOS
Shifting of telescopic tower
Dismantling and refitting 230V, 250/400W light complete set
Making earth pit supply of all required material
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
MONDAL TRADERS
EVERGREEN ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_303699.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .