Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.3 LAccepted-AOC VILL DRABAD PO MANJEER TEHSIL SALOONI DISTT CHAMBA H P 176312 | CHAMBA | HIMACHAL PRADESH | 176312 | ₹4.3 L | L-1 | Accepted-AOC L-1 BIDDER |
| 2 | L-2₹4.5 LRejected-Finance | ₹4.5 L | L-2 | Rejected-Finance NOT L-1 BIDDER |
| 3 | L-3₹4.6 LRejected-Finance VILL GADFARI PO NAKROD TEHSIL CHURAH DISTT CHAMBA HIMACHAL PRADESH 176321 | CHAMBA | HIMACHAL PRADESH | 176321 | ₹4.6 L | L-3 | Rejected-Finance NOT L-1 BIDDER |
| 4 | L-4₹4.6 LRejected-Finance BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹4.6 L | L-4 | Rejected-Finance NOT L-1 BIDDER |
| 5 | L-5₹4.7 LRejected-Finance | ₹4.7 L | L-5 | Rejected-Finance NOT L-1 BIDDER |
| Sl No | Description | Qty | Unit | Bal Singh Thakur L5 | sham lal L2 | Gaffur Mohd L3 | JAI MAA DURGA CONSTRUCTION COMPANY L6 | naveen Kumar L4 | RAKESH KUMAR L1 | Abhishek Thakur L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coats. | 1,366.6 | Sqm | 75,163 ₹88,692.34 | 76,529.6 ₹76,529.60 | 61,497 ₹72,566.46 | 84,729.2 ₹99,980.46 | 80,629.4 ₹95,142.69 | 63,697.23 ₹75,162.73 | 61,497 ₹72,566.46 |
| 2.00 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two or more coats on new work. | 551.83 | Sqm | 32,557.97 ₹38,418.40 | 36,420.78 ₹36,420.78 | 30,350.65 ₹35,813.77 | 35,317.12 ₹41,674.20 | 27,591.5 ₹32,557.97 | 27,122.44 ₹32,004.48 | 38,628.1 ₹45,581.16 |
| 3.00 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. With cement mortar 1:4 (1 Cement: 4 fine sand). | 94.66 | Sqm | 17,701.42 ₹20,887.68 | 20,446.56 ₹20,446.56 | 17,038.8 ₹20,105.78 | 14,199 ₹16,754.82 | 18,932 ₹22,339.76 | 20,135.13 ₹23,759.45 | 32,184.4 ₹37,977.59 |
| 4.00 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 120.69 | Sqm | 6,637.95 ₹7,832.78 | 9,172.44 ₹9,172.44 | 7,482.78 ₹8,829.68 | 6,155.19 ₹7,263.12 | 8,448.3 ₹9,968.99 | 3,988.8 ₹4,706.79 | 9,534.51 ₹11,250.72 |
| 5.00 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 359.69 | Sqm | 2,758.82 ₹3,255.41 | 3,956.59 ₹3,956.59 | 2,841.55 ₹3,353.03 | 1,798.45 ₹2,122.17 | 3,596.9 ₹4,244.34 | 2,438.7 ₹2,877.66 | 3,956.59 ₹4,668.78 |
| 6.00 | Brick work with common burnt clay F.P.S. (non- modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand). | 1.32 | Cum | 6,488.13 ₹7,655.99 | 8,316 ₹8,316 | 6,494.4 ₹7,663.39 | 7,158.36 ₹8,446.86 | 9,240 ₹10,903.20 | 6,711.87 ₹7,920.01 | 7,920 ₹9,345.60 |
| 7.00 | Half brick masonry with common burnt clay F.P.S. (non-modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.Cement mortar 1:4 (1 cement :4 coarse sand). | 1.46 | Sqm | 850.01 ₹1,003.01 | 1,045.36 ₹1,045.36 | 861.4 ₹1,016.45 | 1,039.52 ₹1,226.63 | 1,314 ₹1,550.52 | 618.65 ₹730 | 803 ₹947.54 |
| 8.00 | Centeringand shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconiesand access platform. | 15.93 | Sqm | 3,870.99 ₹4,567.77 | 5,033.88 ₹5,033.88 | 5,575.5 ₹6,579.09 | 1,784.16 ₹2,105.31 | 4,779 ₹5,639.22 | 3,374.93 ₹3,982.42 | 3,026.7 ₹3,571.51 |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 216.18 | Kg | 12,754.62 ₹15,050.45 | 15,132.6 ₹15,132.60 | 11,889.9 ₹14,030.08 | 17,510.58 ₹20,662.48 | 17,294.4 ₹20,407.39 | 13,924.15 ₹16,430.50 | 21,618 ₹25,509.24 |
| 10.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size). | 1.8 | Cum | 10,220.4 ₹12,060.07 | 10,800 ₹10,800 | 10,638 ₹12,552.84 | 10,841.4 ₹12,792.85 | 13,536 ₹15,972.48 | 9,152.55 ₹10,800.01 | 10,800 ₹12,744 |
Tender Value
₹5.5 L
EMD Value
₹11,000
Closing Date
15 Aug 2025, 5:00 pmClosed
Dy General Manager (PnC)
Procurement and Contract Wing, CPS-I Khairi Distt. Chamba (HP) 176325
Repair and Painting works of Executive Field Hostel at Upper Samleu Room No 1 to 12, CPS1, Khairi.
2025_NHPC_870550_1
NH/CPS-1/PnC/W-1513/2025-26/ 156 Dated 25/07/2025
Open Tender
Civil Works - Buildings
60 days
Chamera Power Station-1
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NHPC LIMITED
₹11,000
Yes
24 Dec 2025
25 Jul 2025
20 Aug 2025
25 Jul 2025
15 Aug 2025
25 Jul 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid