Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.4 LAccepted-Finance NO 98 1 1C YOJANANAGAR LOHEGAON WAGOLI ROAD NEAR SIVBHA DARBAR HOTEL LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | ₹34.4 L | L1 | Accepted-Finance FOUND LOWEST, TENDER WILL BE ACCEPTED IF REASONABLE |
| 2 | L2₹42.8 L+₹8.4 L (24.4%)Accepted-Finance | ₹42.8 L+₹8.4 L (24.4%) | L2 | Accepted-Finance NOT LOWEST |
| 3 | L3₹47.5 L+₹13.1 L (38.1%)Accepted-Finance | ₹47.5 L+₹13.1 L (38.1%) | L3 | Accepted-Finance NOT LOWEST |
| 4 | L4₹48.2 L+₹13.8 L (40.2%)Accepted-Finance NO 133 RASHTRAPATHI ROAD SECUNDERABAD 500 003 | SECUNDERABAD | HYDERABAD | TELANGANA | 500003 | ₹48.2 L+₹13.8 L (40.2%) | L4 | Accepted-Finance NOT LOWEST |
| 5 | L5₹48.4 L+₹14.0 L (40.6%)Accepted-Finance 1 16 70 SAI NAGAR COLONY ALWAL SECUNDERABAD 500 015 | SECUNDERABAD | HYDERABAD | TELANGANA | 500015 | ₹48.4 L+₹14.0 L (40.6%) | L5 | Accepted-Finance NOT LOWEST |
| Sl No | Description | Qty | Unit | SRI DHANESWARI ENGINEERING WORKS L3 | M/S DIVIJA BUILDERS L2 | Universal refrigeration and Engineering Company L9 | M/s GM Constructions L8 | Haasith constructions L7 | S.R.M.K Enterprises L1 | Vara Enterprises L6 | ATUL ENTERPRISES L5 | M/S RADHIKA ENTERPRISES L10 | THE DECAN ENGINEERING AND REFRIGERATION COMPANY L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches n.exc. 1.5 m wide and n.exc. 1.5 m in depth for foundation etc or for manholes etc., n.exc. 10 Sq.m on plan and n.exc 1.5m in depth getting out in hard/dense soil complete all as specified and as directed. | 546.8 | Cum | 365 ₹1,99,582 | 360 ₹1,96,848 | 380 ₹2,07,784 | 702 ₹3,83,853.6 | 360 ₹1,96,848 | 200 ₹1,09,360 Lowest | 365 ₹1,99,582 | 365 ₹1,99,582 | 450 ₹2,46,060 | 325 ₹1,77,710 |
| 2.00 | Excavation in trenches n.exc. 1.5 m wide and exceeding 1.5 m but n.exc 3.00 m.in depth for foundation etc or for manholes etc complete all as specified and as directed. | 31.5 | Cum | 445 ₹14,017.5 | 390 ₹12,285 | 420 ₹13,230 | 810 ₹25,515 | 360 ₹11,340 | 250 ₹7,875 Lowest | 385 ₹12,127.5 | 375 ₹11,812.5 | 450 ₹14,175 | 350 ₹11,025 |
| 3.00 | Returning, filling in with approved soil obtained from excavation including spreading levelling, watering and well ramming in layers n.exc. 25cm thick complete all as specified and as directed. | 433.72 | Cum | 80 ₹34,698 Lowest | 120 ₹52,047 | 100 ₹43,372.5 | 144 ₹62,456.4 | 125 ₹54,215.62 | 120 ₹52,047 | 145 ₹62,890.12 | 132 ₹57,251.7 | 200 ₹86,745 | 120 ₹52,047 |
| 4.00 | Removing the excavated soil to a distance n.exc 50m and depositing where directed at a level n.exc 1.5m above the starting point complete all as specified and as directed. | 144.57 | Cum | 280 ₹40,481 | 150 ₹21,686.25 | 120 ₹17,349 Lowest | 306 ₹44,239.95 | 160 ₹23,132 | 180 ₹26,023.5 | 185 ₹26,746.37 | 180 ₹26,023.5 | 180 ₹26,023.5 | 150 ₹21,686.25 |
| 5.00 | M&L for Salt Glazed Stoneware pipes grade 'A',100mm bore,laid in trenches and jointed including demolition and breaking up any type of pipe set in cement mortar including PCC bed and haunching and removal of debris outside the MD land complete all as specified and as directed. | 80 | RM | 320 ₹25,600 | 180 ₹14,400 | 75 ₹6,000 Lowest | 396 ₹31,680 | 300 ₹24,000 | 250 ₹20,000 | 260 ₹20,800 | 255 ₹20,400 | 250 ₹20,000 | 290 ₹23,200 |
| 6.00 | M&L for Salt Glazed Stoneware pipes grade 'A',150mm bore,laid in trenches and jointed including demolition and breaking up any type of pipe set in cement mortar including PCC bed and haunching and removal of debris outside the MD land complete all as specified and as directed. | 450 | RM | 550 ₹2,47,500 | 275 ₹1,23,750 | 125 ₹56,250 Lowest | 495 ₹2,22,750 | 390 ₹1,75,500 | 400 ₹1,80,000 | 360 ₹1,62,000 | 355 ₹1,59,750 | 350 ₹1,57,500 | 390 ₹1,75,500 |
| 7.00 | M&L for Salt Glazed Stoneware pipes grade 'A',200mm bore,laid in trenches and jointed including demolition and breaking up any type of pipe set in cement mortar including PCC bed and haunching and removal of debris outside the MD land complete all as specified and as directed. | 150 | RM | 650 ₹97,500 | 325 ₹48,750 | 210 ₹31,500 Lowest | 891 ₹1,33,650 | 480 ₹72,000 | 500 ₹75,000 | 420 ₹63,000 | 410 ₹61,500 | 410 ₹61,500 | 450 ₹67,500 |
| 8.00 | M&L for Concrete bed to drain pipes including packing under, and haunching against the sides of pipes after they are laid and tested in cement concrete 1:3:6 type C-2 for 100mm dia pipe complete all as specified and as directed. | 80 | RM | 250 ₹20,000 | 125 ₹10,000 | 150 ₹12,000 | 450 ₹36,000 | 220 ₹17,600 | 75 ₹6,000 Lowest | 160 ₹12,800 | 150 ₹12,000 | 150 ₹12,000 | 190 ₹15,200 |
| 9.00 | M&L for Concrete bed to drain pipes including packing under, and haunching against the sides of pipes after they are laid and tested in cement concrete 1:3:6 type C-2 for 150mm dia pipe complete all as specified and as directed. | 450 | RM | 300 ₹1,35,000 | 175 ₹78,750 | 250 ₹1,12,500 | 630 ₹2,83,500 | 290 ₹1,30,500 | 100 ₹45,000 Lowest | 260 ₹1,17,000 | 250 ₹1,12,500 | 250 ₹1,12,500 | 270 ₹1,21,500 |
| 10.00 | M&L for Concrete bed to drain pipes including packing under, and haunching against the sides of pipes after they are laid and tested in cement concrete 1:3:6 type C-2 for 200mm dia pipe complete all as specified and as directed. | 150 | RM | 350 ₹52,500 | 225 ₹33,750 | 290 ₹43,500 | 900 ₹1,35,000 | 340 ₹51,000 | 150 ₹22,500 Lowest | 290 ₹43,500 | 290 ₹43,500 | 290 ₹43,500 | 320 ₹48,000 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
28 Jul 2026, 6:00 pmClosed
RAMESH CHANDRA MEENA
Shri Raju Gayan, AGE (Contracts), GE (South) Secunderabad
REPAIR / REPLACEMENT AND CLEANING OF SEWAGE LINE, SEPTIC TANK, SOAKAGE WELL, MANHOLE ETC AND ALLIED WORKS AT OTHER THAN AOC CENTRE UNDER AGE BR(S) NO.II OF GE (S) SECUNDERABAD.
2026_MES_777166_1
GE(S)/SEC/TOKEN-61 OF 2025-26
Open Tender
Civil Works
Item Rate
180 days
GE SOUTH, MUDFORT, SECUNDERABAD
For Enlisted contractors class D and above category a (ii) and for unenlisted contractors meeting the eligibility criteria of above class and category for along eligible class with EMD
6 documents required · 6 mandatory
₹500
GARRISON ENGINEER (SOUTH), MUDFORT, SECUNDERABAD
₹98,000
Yes
19 Sept 2026
8 Jul 2026
30 Jul 2026
8 Jul 2026
28 Jul 2026
23 Jul 2026
8 Jul 2026 - 22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches n.exc. 1.5 m wide and n.exc. 1.5 m in depth for foundation etc or for manholes etc., n.exc. 10 Sq.m on plan and n.exc 1.5m in depth getting out in hard/dense soil complete all as specified and as directed. | 546.8 | Cum | - | - |
| 2 | Excavation in trenches n.exc. 1.5 m wide and exceeding 1.5 m but n.exc 3.00 m.in depth for foundation etc or for manholes etc complete all as specified and as directed. | 31.5 | Cum | - | - |
| 3 | Returning, filling in with approved soil obtained from excavation including spreading levelling, watering and well ramming in layers n.exc. 25cm thick complete all as specified and as directed. | 433.72 | Cum | - | - |
| 4 | Removing the excavated soil to a distance n.exc 50m and depositing where directed at a level n.exc 1.5m above the starting point complete all as specified and as directed. | 144.58 | Cum | - | - |
| 5 | M&L for Salt Glazed Stoneware pipes grade 'A',100mm bore,laid in trenches and jointed including demolition and breaking up any type of pipe set in cement mortar including PCC bed and haunching and removal of debris outside the MD land complete all as specified and as directed. | 80 | RM | - | - |
| 6 | M&L for Salt Glazed Stoneware pipes grade 'A',150mm bore,laid in trenches and jointed including demolition and breaking up any type of pipe set in cement mortar including PCC bed and haunching and removal of debris outside the MD land complete all as specified and as directed. | 450 | RM | - | - |
| 7 | M&L for Salt Glazed Stoneware pipes grade 'A',200mm bore,laid in trenches and jointed including demolition and breaking up any type of pipe set in cement mortar including PCC bed and haunching and removal of debris outside the MD land complete all as specified and as directed. | 150 | RM | - | - |
| 8 | M&L for Concrete bed to drain pipes including packing under, and haunching against the sides of pipes after they are laid and tested in cement concrete 1:3:6 type C-2 for 100mm dia pipe complete all as specified and as directed. | 80 | RM | - | - |
| 9 | M&L for Concrete bed to drain pipes including packing under, and haunching against the sides of pipes after they are laid and tested in cement concrete 1:3:6 type C-2 for 150mm dia pipe complete all as specified and as directed. | 450 | RM | - | - |
| 10 | M&L for Concrete bed to drain pipes including packing under, and haunching against the sides of pipes after they are laid and tested in cement concrete 1:3:6 type C-2 for 200mm dia pipe complete all as specified and as directed. | 150 | RM | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_870380.xls
BOQ • 0.34 MB
8990tenderdocuments.pdf
Tender Documents • 2.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .