Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.9 CrAccepted-AOC | ₹2.9 Cr | L-1 | Accepted-AOC L-1 |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
19 Dec 2019, 1:00 pmClosed
Suprintending Engineer
Suprintending Engineer Rapti Nahar Nirman Mandal 1 Balrampur
Construction of PRB at km. 24.330 on Campairgunj
2019_UPIDC_412088_1
03/SE/2019-20
Open Tender
Civil Works - Bridges
Item Rate
90 days
Sohrathgarh Siddharthnagar
As Per Tender Notice
2 documents required · 2 mandatory
₹2,354
EE Saryu Nahar Khand 5 Gonda
₹7.4 L
Yes
23 Jan 2020
11 Dec 2019
19 Dec 2019
11 Dec 2019
19 Dec 2019
11 Dec 2019
Amount
E/W in Excavation of Foundation in all type of soil including lead upto 30m lift upto 1.50m and its proper disposal & back filling as per direction by Eng. In Charge required for proper completion of work including cost of all T&P ete. Complete.( GL.90.085-F.L. 84.744=5.341)
Cutting/digging Road crust with block kankar/stone blast mix with mooram etc. including lead,lift stacking etc.
Laying C.C.A-40 M-10 in foundation with cement (OPC 43grade) course sand of FM not less than 2.00 and hard stone ballast (20 to 40mm Size) including lead upto 60m & lift upto 3m machenical mixing and Machenical vibration but excluding of centering & Shuttering required for proper completion of work including cost of all of material, labour and T & P etc. Complete.
Laying C.C.A-20 M-15 with cement (OPC 43grade) course sand of FM not less than 2.00 and crushed stone grit (4.075to 20 mm Size) including lead upto 60m Lift upto 3m machenical mixing and Machenical vibration but excluding cost of centering and Shuttering required for proper completion of work including cost of all material, labour and T&P etc. complete.
Laying C.C.A-20 M-20 ind foundation with cement (OPC 43grade) course sand of FM not less than 2.00 and hard stone grid (4.75 to 20mm Size) including lead upto 60m shift upto 30m machenical mixing and Machenical vibraction but excluding cost of centering & Shuttering required for proper completion of work including cost of all material,labour T&P etc
S/L stone boulder 20 to40 kg weight including all cast of materials and labour T&P etc.
Laying C.C.A-20 M-25 ind foundation with cement (OPC 43grade) course sand of FM not less than 2.00 and hard stone boulder (4.75 to 20mm Size) including lead upto 60m shift upto 30m machenical mixing and Machenical vibraction but excluding cost of centering & Shuttering required for proper completion of work including cost of all material,labour T&P etc
Laying C.C.A-20 M-30 ind foundation with cement (OPC 43grade) course sand of FM not less than 2.00 and hard stone boulder (4.75 to 20mm Size) including lead upto 60m shift upto 30m machenical mixing and Machenical vibraction but excluding cost of centering & Shuttering required for proper completion of work including cost of all material,labour T&P etc
Centering & Shuttering For C.C. & R.C.C Work work with all lead & lift required for proper completion of work including cost of all material, labour and T&P etc. complete
Cutting bending binding and placing TMT steel bars for reinforcement with cost of binding wire required for proper completion of work including cost of material labour and T&P etc. complete
S/F Drainage spout pipe 100mm dia in R.C.C. slab for proper completion of work including cast of all material,labour ,T&P etc.
Laying & fixing joint filler bord18mm thick on specified location in different structure of campierganj branch required proper completion of work including cost of all materials, labour T&P etc. complete
Providing expansion joint in R.C.C including placing of angle iron & M.S Plate and filling sealing compound as per drawing required for proper completion of work, including cost of all material, labour etc.
1st Class Brick work in 1:3 CM with coarse sand including cost of all materials, labour T&P etc. complete
P/F wheel guard including cost of all material, labour, T&P etc.
Dewatering with all cost of power/POL machine, pump well,point system & operate etc.with assembling & dismentling of equipments etc required proper completion of work including cost of all materials, labour T&P etc. complete
E/W in making ramp/ diversion in all type of soil including lead up to 1.00km. & lift Up to 1.5m with manual compaction & dressing required for proper completionof work including cost of all materials, labour T&P etc. complete
S/Fixing Sign bord with lettering,writing & painting both side, including all cost of material labour T&P etc
Brick on edge soling on approch Road/Diversion Ramp with preparation of sub grade and filling joints with local earth, required for proper complection of work, including cost of all material, labour, T&P etc.
E/w in removal diversion in all type of soil including lead upto 30m and lift upto 1.50m with manual compaction and dressing required for proper complection of work, including cost of all material, labour, T&P etc.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .