Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 LAccepted-AOC AYODHYA | UTTAR PRADESH | 224001 | L1 | Accepted-AOC Award Of Contract | |
| 2 | L2₹24.3 L+₹1.3 L (5.52%)Rejected-Finance 53 6 SHUTAR KHANA UDAYGANJ LUCKNOW | L2 | Rejected-Finance Higher Rate in Tender | |
| 3 | L3₹25.8 L+₹2.8 L (12.2%)Rejected-Finance | L3 | Rejected-Finance Higher Rate in Tender | |
| 4 | L4₹28.7 L+₹5.6 L (24.4%)Rejected-Finance AURAIYA | L4 | Rejected-Finance Higher Rate in Tender |
Tender Value
Refer Docs
EMD Value
₹63,000
Closing Date
12 Oct 2022, 3:00 pmClosed
EE MCD
Office of The EE MCD Irrigation Coloney Fatahan Mirzapur
Estimate for Restoration of fall at Km 2.400 ,km 3.200, km 3.410 and construction of protection wall at U/S and D/S (100m in length ) of khairpur mr under project GMC km 32.00 to km 41.600 and Restoration of madhupur Dy System. LOT-05 RETENDER
2022_UPIDC_728443_11
Tender Notice No-03/EEMCD/2022-23
Open Tender
Civil Works
Item Rate
90 days
Sonebhadra
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹63,000
13 Dec 2022
7 Oct 2022
13 Oct 2022
7 Oct 2022
12 Oct 2022
7 Oct 2022
Amount
Dismantling Brick work or stone work in lime or cement mortar including stacking of materials as directed by engg. in-charge within a distance of 60 mt.
E/W Excavation of Foundation in ordinary soil/sandy loam, clay or sand, soil mixed with boulder/ set slush in canal section including lift upto 1.5 m. & lead upto 30 m with disposal of excavation earth as directed by Engg-in-charge.
Preparation of subgrade for lining work excuding cost of earth work including cost of all material, labour, T&P, Taxes etc. required for proper completion of work.
Sand filling work in foundation bellow C.C.base including cost of all material labour ,T&P etc.required.
P/L 100 mm thick Kattal in filter in bed and slope with cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Providing shuttering and centering work for different parts of structure including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying C.C. (1:3:6) in foundation with cement, course sand and hard stonee ballast including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying R.R. stonee masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying R.R. stone masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.(lining work)
Cement sand (1:2) pointing on stonee masonery including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying CC (1:2:4) for slab and wearing coat work with cement, course sand FM not less than 2.0 and hard stonee grit 4.75 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
E/w for canal section and in back filling of walls with a total lead upto 1.0 km. by truck or tractor trolley including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
M/S SHAH ENTERPRISES
M/s Shiv Shakti Constructon
SANTOSH KUMAR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .