| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 CrAccepted-AOC F 25 SECTOR 6 NOIDA UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹5.9 Cr | 1 | Accepted-AOC L-1 |
| 2 | 2₹6.3 Cr+₹41.9 L (7.10%)Rejected-Finance 3B BADRINATH APARTMENT BASISTHAPUR BYELANE 4 BELTOLA SURVEY PO BELTOLA PS HATIGAON KAMRUP METRO PIN 781028 | KAMRUP METRO | ASSAM | 781028 | ₹6.3 Cr+₹41.9 L (7.10%) | 2 | Rejected-Finance L-2 |
| 3 | 3₹6.8 Cr+₹93.1 L (15.8%)Rejected-Finance H NO 1 BISHNU RABHA PATH OPP ZOO POINT BUS STOP R G BARUAH ROAD GUWAHATI 05 ASSAM | ₹6.8 Cr+₹93.1 L (15.8%) | 3 | Rejected-Finance L-3 |
| 4 | 4₹7.1 Cr+₹1.2 Cr (20.2%)Rejected-Finance D 123 SECTOR 7 NOIDA UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹7.1 Cr+₹1.2 Cr (20.2%) | 4 | Rejected-Finance L-4 |
Tender Value
₹6.6 Cr
EMD Value
₹13.2 L
Closing Date
14 Oct 2024, 2:00 pmClosed
Mission Director, SBM- U
Office of the Mission Director, Swachh Bharat Mission -Urban, Assam, Dispur, Guwahati-6
Design, supply, transportation, construction, installation, testing and commissioning of construction of 2.50 MLD STP as per DBO basis in Extended Aeration at Nalbari Municipality Area with sewage pumping and post completion operation , maintenance o
2024_UDD_38955_1
SBM-U 271/2024/5 Dt. 06-09- 2024
Open Tender
Civil Works - Water Works
Works
730 days
Nalbari Town
Please refer Tender documents.
3 documents required · 3 mandatory
₹13,000
₹13.2 L
Guwahati, Assam
5 Apr 2025
12 Sept 2024
15 Oct 2024
12 Sept 2024
14 Oct 2024
23 Sept 2024
18 Sept 2024
Amount
Design Services (Design, Drawings and Documentation)
Investigation & Survey, Design, detailed engineering drawings, Preparation Working Drawing , Soil Testing work based on the guidelines laid down in the Manual published by CPHEEO, Ministry of Housing & Urban Affairs and SBM (Urban) 2.0
CIVIL WORKS OF STP
Inlet Chamber
Bar Screen Chamber
Grit Chamber
Parshall Flume
Aeration Tank
Secondary Settling Tank
Tube Settler
Sludge Drying Bed
Disinfection Tank
Sludge centrifuge Decanter
Electrification Works for STP :
Design, Supply, installation, testing & commissining of all electrical works related to STP including Main Panel Board , campus lighting, Internal and external electrification as per requirement of the project as per design and scope of works refer to the bid document
Electromechanical Works
Supply, Installation, testing and commissioning of all Electro Mechanical Items for Construction of 2.50 MLD capacity Sewerage Treatment Plant suitable for Extended Aeration technology
Power Connection
Providing electrical power connection to Sewage Treatment Plant site including drawal of electrical power line from the nearby APDCL Grid, setting up of required capacity Sub-Station, providing electrical control panel & metering unit etc. and including obtaining necessary approval & load sanction from APDCL and payment of supervision & other charges to APDCL, if any, all complete, as specified & directed
Design and construction of Diesel Generator Room and Store Room as per requirement of the Sewerage treatment plant
Instalation of Deep Tube Well as per design and scope of works refer to the bid document
Interception and Diversion(I&D)
Collection chamber with Screen
Supply, Installation, testing and commissioning of Raw Sewerage Pumps
Supply , laying, testing & commissioning of Raw Sewerage Rising Main line for Sewerage Treatment plant
Road Restoration for interception and Diversion, laying of Raw Sewer line with all respect as per specification of concerned authority and as per the direction of Engineer-in-Charge.
Construction of Community Soak Pit in 3 Nos of Ward as per requirement of the project
Operation and maintenance (O&M ) for 5 years
Operation, maintenance, excluding APDCL charges for Power Consumption, but including required Manpower, chemicals and material, repairing of all components as required, repair to pipeline leakages, road restoration for the repairing works, painting of civil or non-civil structures (if any), retrofitting works of the civil structure wherever necessary and management of Sewerage Treatment plants ( proposed)pumps and motors, pumping stations including mechanical, electrical panels, necessary accessories. It also includes activities for maintenance of campus development, laboratory, etc. and all works related to plant operation as per scope of work, specification , performance indicator and other relevant works for 5(Five) years. Sewage Treatment Plant must comply each and every point of CPCB SOP https://cpcb.nic.in/NGTMC/sop_ocems_stp.pdf and to comply all SOP points during commissioning and Operation & Maintenance of OCEMS system and any other works as directed by Engineer in charge/ employer (APDCL Energy Charges will be borne by the ULB)
M/S One Star Engineering (BID ID -242770)
Ace Alliance (P) Ltd. (BID ID -243017)
SS Engineering Corporation (BID ID -241335)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .