Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.5 LAdmitted-Fee/PreQual/Technical/Finance | -22.64% | ₹22.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹23.3 L+₹76,728.50 (3.41%)Admitted-Fee/PreQual/Technical/Finance | -20.00% | ₹23.3 L+₹76,728.50 (3.41%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹26.6 L+₹4.0 L (18.0%)Admitted-Fee/PreQual/Technical/Finance | -8.75% | ₹26.6 L+₹4.0 L (18.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD not uploaded |
Tender Value
₹29.1 L
EMD Value
₹87,300
Closing Date
31 Aug 2026, 4:30 pmClosed
Executive Engineer Irrigation Division Anantnag
Office of the EXEN ID Anantnag
Martand Canal-Checking of leakages and strengthening of right embankement by way of bed treatment and RCC Jacketing near RD 20000 mts behind Sub-district Hospital SeerZiyarat Shareef Seer.
2026_IFC_320375_1
E-NIT No. 12 of 2026-27
Open Tender
Civil Works
Percentage
40 days
ID Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Executive Engineer Irrigation Division Anantnag
₹87,300
15 Sept 2026
11 Aug 2026
1 Sept 2026
11 Aug 2026
31 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 272.4 | Cum | 592.9 | ₹1,61,505.96 |
| 2 | Dumping stone including cost of stones. In Horizontal on level | 115.77 | Cum | 1,133.9 | ₹1,31,271.6 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 68.1 | Cum | 5,202.9 | ₹3,54,317.49 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 128.55 | Cum | 6,591.25 | ₹8,47,305.19 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-mechanically Treated bars of grade Fe-500D or more. | 5,141.05 | Kg | 123.2 | ₹6,33,377.36 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 442.65 | Sqm | 286.35 | ₹1,26,752.83 |
| 7Carriage of materials from source upto Road site of work by M.T. and 1100 mtrs H.L | |||||
| 7.1 | Cement by an average lead of 12 km. | 52.71 | M.T | 745.56 | ₹39,298.47 |
| 7.2 | Sand by an average lead of 22km. | 88.49 | cum | 1,550.18 | ₹1,37,175.43 |
| 7.3 | Stone aggregates 20mm by an average lead of 20km. | 115.68 | cum | 1,528.1 | ₹1,76,770.61 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_1064869.xls
BOQ • 0.25 MB
datecorrin12.pdf
PDF • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .