| 1 | L1₹10.7 CrAccepted-AOC 7C GOVIND NAGAR MATHURA | MATHURA | ₹10.7 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 106888804.00 Only |
| 2 | L2₹10.7 CrRejected-Finance 64 SHANKAR MARRIAGE HOME WEST ARJUN NAGAR AGRA | AGRA | AGRA | UTTAR PRADESH | ₹10.7 Cr | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹11.0 CrRejected-Finance E 13 NIRBHAY NAGAR GALLANA ROAD AGRA | AGRA | ₹11.0 Cr | L3 | Rejected-Finance Rejected due to higher Rates |
| 4 | L4₹11.3 CrRejected-Finance GARHI NAGAR SAHI AGRA | AGRA | UTTAR PRADESH | 282001 | ₹11.3 Cr | L4 | Rejected-Finance Rejected due to higher Rates |
| 5 | L5₹12.1 CrRejected-Finance | ₹12.1 Cr | L5 | Rejected-Finance Rejected due to higher Rates |
Tender Value
₹17.2 Cr
EMD Value
₹30 L
Closing Date
27 Jan 2025, 12:00 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widending and Strenghtning work of Firozabad fatehabad saiyan kheragarh kirawali bharatpur road from two lanes with paved shoulders in km-95 to 108 (SH-143) in District Agra
2025_CEAGR_994349_1
6113/14M-AC/2024 dated 23-11-2024
Open Tender
Civil Works
365 days
Agra
Widending and Strenghtning work
2 documents required · 2 mandatory
₹2,354
₹30 L
Yes
Agra
16 Apr 2025
17 Jan 2025
27 Jan 2025
20 Jan 2025
27 Jan 2025
20 Jan 2025
22 Jan 2025
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. As per MORT&H Specification No. 301 (3.6).
Construction of embankment/Patri with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per MoRT&H clause 305 (3.16) & as directed by Engineer Incharge including all machinery charges & including all labour, T&P etc required for proper completion of the work. (Cartage Earth)
Construction of Granular Sub-Base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clauses 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carries of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of all materials, T&P, labour, cartage for proper completion of work as per direction of Engineer-in-Charges.
Emulsion Treated Crushed Stone Base (Plant Mix Method) Providing, laying, spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.5% Emulsion in uniform single layer sub base/subgrade and compacting with the road roller to achieve the desired density.
Providing and applying tack coat with bitumen VG-10 @ 0.25kg. Per sqm on granular surface treated with primer & cleaned with mechanical broom including cost of bitumen, T&P and labour & all taxes complete
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects including cost of all materials, T&P, labour, cartage for proper completion of work as per direction of Enginee-in-Charges.
Providing and applying tack coat with bitumen VG-10 @ 0.20kg. Per sqm on granular surface treated with primer & cleaned with mechanical broom including cost of bitumen, T&P and labour & all taxes complete
Providing and laying Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder(VG-40) @ 5.4 % of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher to the required grade, level and alingment, rolling with smooth wheeled bibratory and tendom rollers to achiev the desired compection as per MORTH specifiaction clause 509 complete all respects. Grading-II
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Construction of un-reinforced, plain cement concrete pavement over a prepared sub base with approve grade cement coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, pread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Construction of sub-grade and earthen shoulders with approved material obtained from ROW with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches.
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. Ch-5 SI No- 2
RCC work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Ch-5 SI No- 5.1.2
Supplying, fitting and placing HYSD bar reinforcement in Foundation complete including Labour for straightening, cutting, bending, shifting to site, tying and placing in position as per drawing and technical specifications
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. As per S.I. No. 6.1.1
12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and smooth. As per S.I. No. 13.4.1
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors. As per S.I. No. 4.1.3
Supply and laying & fixing of 350mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Supply and laying & fixing of 600mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Supply and laying & fixing of 1000mm dia NP3 Hume pipe in proper alignment,joint fillingand slope etc. Complete as drawing and technical specification
Maintenance Charge including @ Earth Work, repair of painted surface,(Bituminous) Earth Work on patri, Drain, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. including royalty on materials. GST shall be paid extra as applicable at the time of payment.
Maintenance of First Year (@ 0.00% of Total Work Amount of 1 to 22)
Maintenance of Second Year (@0.25% of Total Work Amount of 1 to 22)
Maintenance of Third Year (@0.50% of Total Work Amount of 1 to 22)
Maintenance of Fourth Year (@0.75% of Total Work Amount of 1 to 22)
Maintenance of Fifth Year (@1% of Total Work Amount of 1 to 22)
M/S A V CONSTRUCTION (BID ID -4882733)
SAMRIDDHI NIRMAN PVT. LTD. (BID ID -4883777)
M/S KAKA CONS (BID ID -4879603)
M/S G.G. INFRATECH (BID ID -4882967)
M/S SHREE RAM CONSTRUCTION (BID ID -4885463)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid