Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.7 LAdmitted-Finance | -0.05% | ₹33.7 L | L1 | Admitted-Finance |
| 2 | L2₹33.8 LAdmitted-Finance | +0.15% | ₹33.8 L | L2 | Admitted-Finance |
| 3 | L3₹33.8 LAdmitted-Finance | +0.21% | ₹33.8 L | L3 | Admitted-Finance |
Tender Value
₹33.7 L
EMD Value
₹3.4 L
Closing Date
2 Apr 2026, 5:00 pmClosed
Executive Officer Nagar Panchayat Lalganj
Office Nagar Panchayat Lalganj Pratapgarh
construction work of park and open gym in diwani ward
2026_DOLBU_1128343_1
915NPL-2025-26 Date 11-03-2026
Open Tender
Civil Works
90 days
Lalganj Pratapgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,379
Yes
Executive Officer Nagar Panchayat Lalganj
₹3.4 L
Yes
18 Apr 2026
20 Mar 2026
4 Apr 2026
20 Mar 2026
2 Apr 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1DESCRIPTION OF WORK ( BOUNDARY WALL ) Site Clearance & Barricading | ||||||
| 2Excavation in foundation in ordinary Soil ( Loam clay or sand) including lift upto 1.5m lead upto 30.0 m & including filling watering and ramming of excavated earth into the space between the building & sides of foundation trenches of into the plinth and removal & disposal surplus earth as directed by the engineer I/C within a lead of 30 m. as per DSR 2.8.1 Wall column | ||||||
| 3Concrete with 40mm gauge STONE ballast ,fine sand of 1.25 F.M. And cement in the proportion of 8:4:1 in foundation and under floors including supply of all material labours tools and plants etc.required for the proper completion of the work DSR 4.1.8 | ||||||
| 4 | Class 150 sub class 'A' brick work in 1:6cement and coarsesand of 1.25 F.M mortar in foundation and up to plinth including supply of all materials labour and T&P etc. Required for the proper completion of the work, DSR 6.1.2 | 1 | m3 | - | - | BI01010001010000000000000515BI0100001133 |
| 5Same as above in item No 4 but in super structure for wall of one brick thickness As per S.l.No DSR NO-6.4.2 309, 310 Boundry wall Deduction column plinth beam | ||||||
| 6M-20 class R.C.C work with cement approved coarse sand 20 mm gauge approved stone grit in the proportion of 1:1.5:3 in foundation and footing excluding the supply of rainforcement and its bending but including its biding the same with 24 BWG, Gl binding wire and also including providing and fixing necessary centering and shuttering and its removal after completion of work & supply of all other materials labour T&P etc. Required for the proper completion of the work. (S.l.No.284) Centring shetring all work completed column plinth beam | ||||||
| 7MILDsteel total volume at concrete 1.50%@0.785/qtl. AS per dsr 5.22.6 | ||||||
| 8Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. DSR 10.16.2 | ||||||
| 9Painting or Vanishing two coat on iron work in small areas or new wood work with one coat of ready mixed priming paint and one coat of approved superior ready mixed paint of clear synthetic varnish including supply of all materials, labour, T & P etc. required for proper completion the work. DSR 13.62.1 | ||||||
| 1012 mm thick plaster with 1:4 cement and fine sand morter on brick work including ranking and joint washing and cleaning and including supply of all materials labour and T&P etc. required for proper completion of work. As per S.l.No 597c | ||||||
stage.html
html • 0.03 MB
technical_2104479.pdf
techsummary_2104479.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_2104479.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid