Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC Minimum Rates |
| 2 | L2₹3.1 L+₹31,680 (11.2%)Rejected-Finance | ₹3.1 L+₹31,680 (11.2%) | L2 | Rejected-Finance EMD Refunded |
| 3 | L3₹3.3 L+₹47,520 (16.8%)Rejected-Finance | ₹3.3 L+₹47,520 (16.8%) | L3 | Rejected-Finance EMD Refunded |
| 4 | L4₹4.4 L+₹1.5 L (54.2%)Rejected-Finance | ₹4.4 L+₹1.5 L (54.2%) | L4 | Rejected-Finance EMD Refunded |
| 5 | L5₹5.0 L+₹2.2 L (76.6%)Rejected-Finance | ₹5.0 L+₹2.2 L (76.6%) | L5 | Rejected-Finance EMD Refunded |
| Sl No | Description | Qty | Unit | ankit chaudhary contractor L5 | SAINI ELECTRICAL WORKS L2 | jarnail singh cont, L4 | The new kandaiwala Cop. L & C Society Ltd. L3 | NAVYA ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Repair of Submersible / Horizontal pumping sets for tubewell/Booster only Consisting mainly of motor, pump, electrical control panel, starter, cable and all accessories, sluice valves, non return valves specials etc. including all appurtenance inside the premises of water works. (Rate excluding GST)
Submersible Motor More than 20 BHP
25.00 BHP x 5 No = 125.00 BHP
35.00 BHP x 1 No = 35.00 BHP
Total = 160.00 BHP x 12 = 1920.00 | 160 | Per BHP Per Month | 189 ₹3,62,880 | 119 ₹2,28,480 | 165 ₹3,16,800 | 125 ₹2,40,000 | 107 ₹2,05,440 Lowest |
| 2.00 | Repair of Submersible / Horizontal pumping sets for tubewell/Booster only Consisting mainly of motor, pump, electrical control panel, starter, cable and all accessories, sluice valves, non return valves specials etc. including all appurtenance inside the premises of water works. (Rate excluding GST)
Horizontal Motor More than 20 BHP
30.00 BHP x 2 No = 60.00 BHP
Total = 60.00 BHP x 12 = 720.00 | 60 | Per BHP Per Month | 189 ₹1,36,080 | 119 ₹85,680 | 165 ₹1,18,800 | 125 ₹90,000 | 107 ₹77,040 Lowest |
Tender Value
₹3.0 L
EMD Value
₹6,040
Closing Date
8 Sept 2026, 3:00 pmClosed
SAMEER SHARMA
Panchkula PHED
Repair of pumping Machinery of existing 6 no.tubewell and 2 no Booster
2026_HRY_545439_1
20262503055D 34E9 4A20 86EC DCB2A0113A53547PUH
Open Tender
Civil Works
Works
365 days
Panchkula
2 documents required · 2 mandatory
₹500
Yes
₹6,040
Yes
11 Sept 2026
3 Sept 2026
8 Sept 2026
3 Sept 2026
8 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair of Submersible / Horizontal pumping sets for tubewell/Booster only Consisting mainly of motor, pump, electrical control panel, starter, cable and all accessories, sluice valves, non return valves specials etc. including all appurtenance inside the premises of water works. (Rate excluding GST)
Submersible Motor More than 20 BHP
25.00 BHP x 5 No = 125.00 BHP
35.00 BHP x 1 No = 35.00 BHP
Total = 160.00 BHP x 12 = 1920.00 | 160 | Per BHP Per Month | 12 | ₹1,920 |
| 2 | Repair of Submersible / Horizontal pumping sets for tubewell/Booster only Consisting mainly of motor, pump, electrical control panel, starter, cable and all accessories, sluice valves, non return valves specials etc. including all appurtenance inside the premises of water works. (Rate excluding GST)
Horizontal Motor More than 20 BHP
30.00 BHP x 2 No = 60.00 BHP
Total = 60.00 BHP x 12 = 720.00 | 60 | Per BHP Per Month | 12 | ₹720 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_625012.xls
BOQ • 0.27 MB
3C21BYZ177270.pdf
Additional Documents • 2.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .