Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹7.7 L+₹10,494.92 (1.39%)Admitted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | STANDARD CAPACITORS L1 | Premier Engineering Company L2 |
|---|---|---|---|---|---|
| 1.01 | RENOVATION OF APFC PANEL - 2 Nos.Dismantling of defective capacitor units from the APFC panel after suitably discharging the left-over charge on capacitors to ensure safety of the working persons along with dismantling of APFC relay, indications lights, meters, A/M switches, MCBs including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in the panel as required at site | 2 | Jobs | 23,000 ₹27,140 Lowest | 25,000 ₹29,500 |
| 1.02 | Replacement of defective Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable end entry, mounting structure and hardware etc. -Make Standard | 400 | kVAr | 1,78,000 ₹2,10,040 Lowest | 1,79,200 ₹2,11,456 |
| 1.03 | Banking of capacitors of various capacities with multi strand copper wires & lugs /aluminium bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank. | 400 | kVAr | 58,000 ₹68,440 Lowest | 58,000 ₹68,440 Lowest |
| 1.04 | Replacement of defective APFC relay, with new microprocessor based APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contactor coils for switching ON-OFF required number of capacitors as per requirement to achieve target power factor. Make - Standard | 2 | Nos. | 46,000 ₹54,280 Lowest | 46,720 ₹55,129.6 |
| 1.05 | Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties from utility companies. | 2 | Nos. | 19,000 ₹22,420 Lowest | 19,000 ₹22,420 Lowest |
| 1.06 | Replacement of defective capacitor duty contactors suitable for 20 KVAr capacitor with new capacitor duty contactor. Make Standard/TDK (Epcos) | 4 | Nos. | 18,800 ₹22,184 Lowest | 18,848 ₹22,240.64 |
| 1.07 | Replacement of defective capacitor duty contactors suitable for 12.5 KVAr capacitor with new capacitor duty contactor. Make Standard/TDK (Epcos) | 4 | Nos. | 12,200 ₹14,396 Lowest | 12,336 ₹14,556.48 |
| 1.08 | Replacement of defective triple pole MCB of 32 A capacity with new MCB for operation and safety of individual capacitor bank - make Standard | 4 | Nos. | 4,920 ₹5,805.6 Lowest | 4,920 ₹5,805.6 Lowest |
| 1.09 | Supply of triple pole MCB of 63 A capacity for operation and safety of individual capacitor bank - make Standard | 2 | Nos. | 3,920 ₹4,625.6 Lowest | 3,920 ₹4,625.6 Lowest |
| 1.10 | Replacement of defective 0-200 A Ammeter with new ammeter complete with selector switch and set of 3 nos. CTs for monitoring health of capacitor bank, make -AE/HPL/Standard | 2 | Sets | 5,900 ₹6,962 Lowest | 5,900 ₹6,962 Lowest |
Tender Value
Refer Docs
EMD Value
₹15,700
Closing Date
18 Dec 2025, 3:00 pmClosed
EE (SDW) IX
RITHALA STP SEC-11 ROHINI DELHI-110085
Repairing of Standard Capacitor make APFC panel to maintain power factor at Bharat Nagar SPS.
2025_DJB_282769_5
NITNo10ItemNo1
Open Tender
Miscellaneous Works
Works
30 days
RITHALA STP SEC-11 ROHINI DELHI-110085
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB Sab Paisa
₹15,700
22 Dec 2025
11 Dec 2025
18 Dec 2025
11 Dec 2025
18 Dec 2025
11 Dec 2025
RENOVATION OF APFC PANEL - 2 Nos.Dismantling of defective capacitor units from the APFC panel after suitably discharging the left-over charge on capacitors to ensure safety of the working persons along with dismantling of APFC relay, indications lights, meters, A/M switches, MCBs including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in the panel as required at site
Replacement of defective Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable end entry, mounting structure and hardware etc. -Make Standard
Banking of capacitors of various capacities with multi strand copper wires & lugs /aluminium bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank.
Replacement of defective APFC relay, with new microprocessor based APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contactor coils for switching ON-OFF required number of capacitors as per requirement to achieve target power factor. Make - Standard
Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties from utility companies.
Replacement of defective capacitor duty contactors suitable for 20 KVAr capacitor with new capacitor duty contactor. Make Standard/TDK (Epcos)
Replacement of defective capacitor duty contactors suitable for 12.5 KVAr capacitor with new capacitor duty contactor. Make Standard/TDK (Epcos)
Replacement of defective triple pole MCB of 32 A capacity with new MCB for operation and safety of individual capacitor bank - make Standard
Supply of triple pole MCB of 63 A capacity for operation and safety of individual capacitor bank - make Standard
Replacement of defective/burnt out LED indication lights of various colours with new indication lights, make -Standard
Control wiring of APFC relay with multi strand copper wires, lugs, tapes etc. As required at site.
Power wiring with 10 sq. mm multi strand copper wires for connection between capacitors and bus bar using copper lugs and necessary hardware etc. as required at site.
Installation of all above components in the existing capacitor banks with suitable fabrication work to accommodate new items in the existing enclosure / structure for alignment of components and ease of termination, complete with hardware on the mounting structure and termination of existing cables with lugs, tapes etc. complete with earthing of the capacitor banks, touching the rusted parts of the panel structure with paint for protection from moisture etc. as required at site
Servicing of APFC panels including complete dusting of the panel, cleaning of contact points, Decarbonising of joints, alignment of doors, checking of all nuts & bolts, control circuit and power circuit wiring dressing and renovation of control and power terminations etc. as required at site
Testing & Commissioning of complete APFC Panel installation including following: 01. Meggering of complete capacitor installation using 500V megger 02. Continuity test for checking continuity of all circuits to ensure that all circuits are properly wired. 03. Checking function and efficiency of various components of APFC panel
REPAIR OF STATIC CAPACITOR FOR TRANSFORMERChecking of capacitors and dismantling of defective capacitors from static capacitor banks including dismantling of terminations, wirings, hardware, as required at site.
Replacement of defective Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440V, 3 phase, 50 Hz system complete with terminal cover, cable end entry, mounting structure and hardware etc. -Make Standard
Banking of capacitors of various capacities with multistrand copper wires & lugs /aluminium bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank.
Replacement of defective/burnt out LED indication lights of various colours with new indication lights, make -Standard
Installation and connection of various components as described above in static capacitor banks using necessary hardware, mounting arrangement and termination with multi strand copper wires, lugs and tapes etc. as required at site
Servicing & commissioning of static capacitor banks including complete dusting, tightening of all connections, cleaning of electrical terminations, megger testing and re-commissioning of capacitor banks
Old Scrap Rebate
Premier Engineering Company (BID ID -1649446)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_373753.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .