| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC 15 3 625017 | MADURAI | TAMIL NADU | 625017 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.0 L+₹13,167 (4.59%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R UDHAYA KUMAR L2 | BALAJI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 MDU-CORP-
BUILDING DATA-P-2-SL No:229 | 17 | m3 | 220.7 ₹3,751.9 | 211 ₹3,587 Lowest |
| 2.01 | Supplying and filling in foundation and basement with filling Sand in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc. MDU-
CORP-BUILDING DATA-P-2-SL No:21 | 1 | m3 | 1,995.5 ₹1,995.5 | 1,907.7 ₹1,907.7 Lowest |
| 3.01 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. MDU-CORP-
BUILDING DATA-P-3-SL No:22 | 2 | m3 | 5,930.7 ₹11,861.4 | 5,669.9 ₹11,339.8 Lowest |
| 4.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2. MDU-
CORP-BUILDING DATA-P-8-SL No:100 | 43 | m2 | 1,409.6 ₹60,612.8 | 1,347.6 ₹57,946.8 Lowest |
| 5.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only
MDU-CORP-BUILDING DATA-P-7-SL No:82 | 8 | m2 | 1,174.7 ₹9,397.6 | 1,123 ₹8,984 Lowest |
| 6.01 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in F&B. MDU-CORP-BUILDING DATA-P
10-SL No:26 | 8 | m3 | 9,883.5 ₹79,068 | 9,448.9 ₹75,591.2 Lowest |
| 7.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia MDU-CORP
BUILDING DATA-P-34-SL No:22 | 800 | kg | 98.1 ₹78,480 | 93.8 ₹75,040 Lowest |
| 8.01 | Supply of 900mm precost cement Ring and
900mm precost cement off Ring Slab. - 900mm precost cement Ring MDU-CORP-BUILD-
DATA-P (98) - Sl (148) | 5 | N0 | 627 ₹3,135 | 599.4 ₹2,997 Lowest |
| 9.01 | 900mm precost cement off Ring Slab. MDU-
CORP-BUILD-DATA-P (98) - Sl (148) | 2 | N0 | 386.6 ₹773.2 | 369.6 ₹739.2 Lowest |
| 10.01 | Supply of 110mm PVC Pipe. PWD-SOR-II-DATA-
P-5-WD-M0013 | 24 | Rm | 205.6 ₹4,934.4 | 196.6 ₹4,718.4 Lowest |
Tender Value
₹2.9 L
EMD Value
₹2,868
Closing Date
16 Jul 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Construction of septic tank to SBM 2.0 public toilet at thirunagar anna park inside in ward 94
2025_MAWS_577037_1
E4 /EST- 625 / 24-25
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹2,868
20 Aug 2025
3 Jul 2025
16 Jul 2025
3 Jul 2025
16 Jul 2025
3 Jul 2025
Amount
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 MDU-CORP- BUILDING DATA-P-2-SL No:229
Supplying and filling in foundation and basement with filling Sand in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc. MDU- CORP-BUILDING DATA-P-2-SL No:21
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. MDU-CORP- BUILDING DATA-P-3-SL No:22
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2. MDU- CORP-BUILDING DATA-P-8-SL No:100
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only MDU-CORP-BUILDING DATA-P-7-SL No:82
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in F&B. MDU-CORP-BUILDING DATA-P 10-SL No:26
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia MDU-CORP BUILDING DATA-P-34-SL No:22
Supply of 900mm precost cement Ring and 900mm precost cement off Ring Slab. - 900mm precost cement Ring MDU-CORP-BUILD- DATA-P (98) - Sl (148)
900mm precost cement off Ring Slab. MDU- CORP-BUILD-DATA-P (98) - Sl (148)
Supply of 110mm PVC Pipe. PWD-SOR-II-DATA- P-5-WD-M0013
Add GST 18%
R UDHAYA KUMAR (BID ID -1402674)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .