| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 94 PHASE II HOUSEING COLONY UDHAMPUR J K | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹2.2 L (1.86%)Rejected-Finance 135 CHAKRANA TIWARI CHAKA NAINI PRAYAGRAJ 211008 UTTAR PRADESH | PRAYAGRAJ | UTTAR PRADESH | 211008 | ₹1.2 Cr+₹2.2 L (1.86%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹1.3 Cr+₹10.8 L (9.10%)Rejected-Finance | ₹1.3 Cr+₹10.8 L (9.10%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹1.4 Cr+₹20.5 L (17.2%)Rejected-Finance 1 181 KAMATCHI AMMAN KOVIL STREET KANNAN COLONY CHINTHAMANI MADURAI 625009 | MADURAI | MADURAI | TAMIL NADU | 625009 | ₹1.4 Cr+₹20.5 L (17.2%) | L4 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | JINDAL BUILDERS L3 | SHIVAE CONSTRUCTION L1 | vijay builders L2 | r k builders L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Total Amount of Sch 'A' Part- I (BUILDING WORK) | 1 | Lump Sum | 96,48,900 ₹96,48,900 | 90,00,000 ₹90,00,000 Lowest | 91,01,200 ₹91,01,200 | 1,07,50,000 ₹1,07,50,000 |
| 2.00 | Total Amount of Sch 'A' Part- II (INTERNAL WATER SUPPLY WORK) | 1 | Lump Sum | 51,567 ₹51,567 | 56,901 ₹56,901 | 42,676.09 ₹42,676.09 Lowest | 65,000 ₹65,000 |
| 3.00 | Total Amount of Sch 'A' Part- III (INTERNAL ELECTRIFICATION WORK) | 1 | Lump Sum | 2,72,502 ₹2,72,502 | 2,00,000 ₹2,00,000 Lowest | 2,74,531.99 ₹2,74,531.99 | 2,80,000 ₹2,80,000 |
| 4.00 | Total Amount of Sch 'A' Part- IV (PLUMBING WORK) | 1 | Lump Sum | 15,854 ₹15,854 | 9,861 ₹9,861 Lowest | 16,228.58 ₹16,228.58 | 18,000 ₹18,000 |
| 5.00 | Total Amount of Sch 'A' Part- V (AREA DRAINAGE WORK) | 1 | Lump Sum | 3,63,520 ₹3,63,520 | 2,00,000 ₹2,00,000 Lowest | 2,72,640.37 ₹2,72,640.37 | 3,00,000 ₹3,00,000 |
| 6.00 | Total Amount of Sch 'A' Part- VI (SEWAGE DISPOSAL WORK) | 1 | Lump Sum | 56,380 ₹56,380 | 48,863 ₹48,863 | 64,434.84 ₹64,434.84 | 45,000 ₹45,000 Lowest |
| 7.00 | Total Amount of Sch 'A' Part- VII (ROAD & PATH WORK) | 1 | Lump Sum | 15,17,877 ₹15,17,877 | 15,00,000 ₹15,00,000 | 13,22,920.74 ₹13,22,920.74 Lowest | 13,90,000 ₹13,90,000 |
| 8.00 | Total Amount of Sch 'A' Part- VIII (EXTERNAL WATER SUPPLY WORK) | 1 | Lump Sum | 1,29,917 ₹1,29,917 Lowest | 1,60,000 ₹1,60,000 | 1,54,136.99 ₹1,54,136.99 | 1,70,000 ₹1,70,000 |
| 9.00 | Total Amount of Sch 'A' Part- IX (EXTERNAL ELECTRIFICATION WORK) | 1 | Lump Sum | 1,03,621 ₹1,03,621 Lowest | 1,03,621 ₹1,03,621 Lowest | 1,13,983.93 ₹1,13,983.93 | 1,25,000 ₹1,25,000 |
| 10.00 | Total Amount of Sch 'A' Part- X (RETAINING WALL) | 1 | Lump Sum | 2,68,552 ₹2,68,552 | 1,90,000 ₹1,90,000 Lowest | 2,23,793.11 ₹2,23,793.11 | 2,50,000 ₹2,50,000 |
Tender Value
₹1.2 Cr
EMD Value
₹1.9 L
Closing Date
6 Mar 2026, 6:00 pmClosed
Col Neelima CWE
HQ CWE Udhampur
DEMOLITION OF BLDG. NO NP-76 AND PROVISION OF FIRM STATION WITH ALLIED INFRASTRUCTURE AT 1 FOD UNDER GE (SOUTH) UDHAMPUR
2026_MES_750639_1
CWE/U(S)-97/2025-26
Open Tender
Civil Works
Lump-sum
365 days
UDHAMPUR
As per NIT
7 documents required · 7 mandatory
₹1,000
GE (SOUTH) UDHAMPUR
₹1.9 L
21 May 2026
30 Jan 2026
9 Mar 2026
30 Jan 2026
6 Mar 2026
27 Feb 2026
Total Amount of Sch 'A' Part- I (BUILDING WORK) Note : This Schedule is not Pre-Priced by MES and the Pre-Priced rate indicated as "Rs. 0.00" under col.5 signifies this fact only.
Construction of Fire Station Building and Hose hot & drying tower with permanent specifications complete all as shown on drawings and as specified.
Construction of Garrage Building with permanent specifications complete all as shown on drawings and as specified.
Construction of Elevated Guard Post Building with permanent specifications complete all as shown on drawings and as specified..
Total Amount of Sch 'A' Part- II (INTERNAL WATER SUPPLY WORK)
Total Amount of Sch 'A' Part- III (INTERNAL ELECTRIFICATION WORK)
Total Amount of Sch 'A' Part- IV (PLUMBING WORK)
Total Amount of Sch 'A' Part- V (AREA DRAINAGE WORK)
Total Amount of Sch 'A' Part- VI (SEWAGE DISPOSAL WORK)
Total Amount of Sch 'A' Part- VII (ROAD & PATH WORK)
Total Amount of Sch 'A' Part- VIII (EXTERNAL WATER SUPPLY WORK)
Total Amount of Sch 'A' Part- IX (EXTERNAL ELECTRIFICATION WORK)
Total Amount of Sch 'A' Part- X (RETAINING WALL)
Total Amount of Sch 'A' Part- XI (SITE CLEARANCE)
Total Amount of Sch 'A' Part- XII (DEMOLITION/DISMANTLING)
Sch 'A' Part - XIII (Misc Items ) Note : This Schedule is not Pre-Priced by MES and the Pre-Priced rate indicated as "Rs. 0.00" under col.5 signifies this fact only.
Sheet metal enclosure double door type for MCB TPN DB upto 125 Amps 4 way vertical type 415 volts with suitable busbar and neutral link, fixed flush to wall and including all internal connection, necessary reducer lugs all as directed.
Earthing complete with galvanized steel earth plate electrode 600mm x 600mm x 6mm buried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of earth plate not less than 1.5m below normal ground level connected with galvanized iron earth lead wire 4mm dia by means of bolts, nuts, check nuts and washers of galvanized iron or steel complete with 15mm dia GI light grade protection pipe, 20mm dia GI medium grade watering pipe with funnel including charcoal, dust, salt, PCC M-15 type B1 in pit with angle iron (25x25x3)mm frame work with precast RCC 1:2:4 type B-1 cover reinforced with 8mm dia TMT bars @ 150mm C/C both ways and 12mm dia MS fabricated handle, test point etc. in and including light grade GI protection pipe 20mm bore up to 7.5m length for drawing in earth lead wire, all as shown in electric plate No. 3 of SSR Part-I complete with necessary earth work in any type of soil, removal of soil to a distance not exc. 50m, testing on completion complete all as specified and directed. Note:- On testing after completion of earthing, if desired earth resistance is not obtained, the earthing will be re-done by the contractor at his own risk & cost to the entire satisfaction.
Cabin wall fans complete with accessories, AC single phase 50Hz, 230 Volt of size 300mm sweep blades, frame and louvers, complete all as specified and as directed.
Supply only portable inspection light 60 watt, 230 volts, AC, complete all as specified and as directed.
Construction of septic tank for 10 users (Brick construction) complete all as specified and as shown on drgs.
Construction of soakage well (Brick construction) 1.2m dia and 3.0m deep (internal dimensions) , complete all as specified and as shown on drgs.
Earthing complete with galvanized steel earth plate electrode 600mm x 600mm x 6.0mm thick buried directly in ground ( earth pit not less than 2.25 mtr below normal ground level) with top edge plate not less than 1.5 metre below normal ground level connected to galvanized earth strip of size (32x6)mm as earthing lead by means of bolts, nuts, chuck nuts and washers of galvanized iron earth lead with 15 cm thick alternate layers of charcoal dust & common slat including PCC pit in PCC 1:2:4 type B-1, RCC cover made out of cement concrete 1:2:4 type B-1 (using 20 mm graded crushed stone aggregate) reinforced with TMT steel bars 8 mm dia @150 mm c/c both ways with suitable handle and angle iron (40x40x5)mm frame, GI medium grade watering pipe 20mm bore and funnel with wire mesh, GI light grade protection pipe 40mm bore up to main board complete as shown on electrical plate No 3 of MES Sch 2009 (Part-I) and testing on completion complete all as specified and directed. Note: - On testing after completion of earthing, if desired earth resistance is not obtained, the earthing will be re-done by the contractor at his own risk & cost to the entire satisfaction.
Taking down MCB DBs/MCB SP & SPN complete all as specified and as directed.
Taking down old unserviceable earthing any type and size complete all as specified and as directed.
Taking down unserviceable cable any size, complete all as directed.
Deduction to be made from BOQ for Sch 'A' Part -XIV (Schedule of credit) during AOC. Note: Tenderers shall not quote for this schedule.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Drawings.pdf
Additional Documents • 22.47 MB
BOQ_840703.xls
BOQ • 0.25 MB
Sch97.pdf
Additional Documents • 4.79 MB
Tender97.pdf
Tender Documents • 1.98 MB
C5.pdf
PDF • 1.90 MB
A4.pdf
PDF • 0.18 MB
A2.pdf
PDF • 0.18 MB
A1.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .