Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 LAccepted-AOC B 56 LANE NO 4A SECTOR 7 VASHNAVI ENCLAVE CHANNI HIMAT JAMMU 180015 | JAMMU | JAMMU AND KASHMIR | 180015 | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹19.0 L+₹38,047.70 (2.04%)Rejected-Finance WARD NO 1 HOUSE NO 04 SUBASH NAGAR UDHAMPUR 182101 J K | UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L2 | Rejected-Finance BEING L2 | |
| 3 | L3₹20.5 L+₹1.9 L (10.1%)Rejected-Finance 94 PHASE II HOUSEING COLONY UDHAMPUR J K | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L3 | Rejected-Finance BEING L3 | |
| 4 | L4₹21.7 L+₹3.0 L (16.4%)Rejected-Finance | L4 | Rejected-Finance BEING L4 | |
| 5 | L5₹21.7 L+₹3.1 L (16.4%)Rejected-Finance NEW HOSPITAL ROAD UDHAMPUR UDHAMPUR UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L5 | Rejected-Finance BEING L5 |
| Sl No | Description | Qty | Unit | SHIVAE CONSTRUCTION L3 | ANIKET TRADERS L1 | TARUN BUILDERS L4 | KARAN TRADERS L9 | PARAS RAM ASGOTRA AND SONS L8 | MAHAJAN TRADING CO L5 | DAVINDER SINGH L2 | M/s B K SHARMA & SONS L6 | kerni electricals L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (unreinforced) of any descriptions, Roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work complete all as specified and directed. | 250 | Cum | 300 ₹75,000 | 77 ₹19,250 | 60 ₹15,000 | 200 ₹50,000 | 50 ₹12,500 | 200 ₹50,000 | 75 ₹18,750 | 40 ₹10,000 Lowest | 50 ₹12,500 |
| 2.00 | M&L for Removing excavated material exc. 500 m but n exc.1.5km and depositing where directed complete all as specified. | 250 | Cum | 1 ₹250 Lowest | 50 ₹12,500 | 70 ₹17,500 | 90 ₹22,500 | 50 ₹12,500 | 100 ₹25,000 | 100 ₹25,000 | 70 ₹17,500 | 25 ₹6,250 |
| 3.00 | Rendering 10mm thick in CM 1:3 with water proofing compound on cleaned concrete surfaces of roof and finishing the surfaces fair and even including curing the plastered surfaces for 07 days by ponding of water over the roof (Levelling course). (Note : Water proofing compound to be measured and paid separately) | 2,500 | Sqm | 90 ₹2,25,000 Lowest | 120 ₹3,00,000 | 140 ₹3,50,000 | 200 ₹5,00,000 | 100 ₹2,50,000 | 140 ₹3,50,000 | 130 ₹3,25,000 | 120 ₹3,00,000 | 190 ₹4,75,000 |
| 4.00 | M&L for APP based polymeric membrane minimum weighing 3kg/sqm and minimum 3mm thick reinforced with polyster non wove fabric (wt. not less than 150 gms/sqm) land on primed surface by forced application complete all as specified and directed. | 2,500 | Sqm | 260 ₹6,50,000 | 240 ₹6,00,000 | 305 ₹7,62,500 | 435 ₹10,87,500 | 500 ₹12,50,000 | 300 ₹7,50,000 | 260 ₹6,50,000 | 400 ₹10,00,000 | 230 ₹5,75,000 Lowest |
| 5.00 | Supply only bitumen primer for use in waterproofing and damp-proofing treatments complete all as specified and as directed. | 1,000 | Ltr | 150 ₹1,50,000 | 15 ₹15,000 Lowest | 140 ₹1,40,000 | 120 ₹1,20,000 | 50 ₹50,000 | 75 ₹75,000 | 25 ₹25,000 | 50 ₹50,000 | 100 ₹1,00,000 |
| 6.00 | M&L for applying evenly a tack coat of industrial bitumen 85/25 at the rate of 1.2 kg per sq.m including cleaning surfaces complete all as specified. | 2,500 | Sqm | 70 ₹1,75,000 | 80 ₹2,00,000 | 30 ₹75,000 Lowest | 100 ₹2,50,000 | 50 ₹1,25,000 | 50 ₹1,25,000 | 55 ₹1,37,500 | 30 ₹75,000 Lowest | 70 ₹1,75,000 |
| 7.00 | Supply only integral water proofing compound complete all as specified. | 85 | Ltr | 30 ₹2,550 | 88 ₹7,480 | 120 ₹10,200 | 60 ₹5,100 | 50 ₹4,250 | 20 ₹1,700 Lowest | 25 ₹2,125 | 50 ₹4,250 | 70 ₹5,950 |
| 8.00 | Taking up or down 15mm bore of steel tubing with connections for cleaning for refixing or removing to store/yard complete all as specified . | 100 | RM | 10 ₹1,000 | 11 ₹1,100 | 7 ₹700 | 10 ₹1,000 | 5 ₹500 | 1 ₹100 Lowest | 5 ₹500 | 10 ₹1,000 | 10 ₹1,000 |
| 9.00 | S&F for steel water tubing of nominal bore 15 mm medium grade galvanised with all fittings including short lengths, fixed to walls, concealed in wall and ceiling or laid in floor complete with all fittings (such as bends, elbows, Tee, short pieces, connectors, back nuts, diminishing pieces, caps and plugs, unions etc.) complete all as specified. | 100 | RM | 150 ₹15,000 | 150 ₹15,000 | 140 ₹14,000 | 180 ₹18,000 | 150 ₹15,000 | 80 ₹8,000 Lowest | 120 ₹12,000 | 160 ₹16,000 | 250 ₹25,000 |
| 10.00 | Taking up or down 20mm bore of steel tubing with connections for cleaning for refixing or removing to store/yard complete all as specified . | 60 | RM | 10 ₹600 | 11 ₹660 | 7 ₹420 | 10 ₹600 | 10 ₹600 | 1 ₹60 Lowest | 60 ₹3,600 | 10 ₹600 | 10 ₹600 |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
17 Jul 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF UDHAMPUR
GE (AF) STN UDHAMPUR
REPAIRS / REPLACEMENT TO ROOFS TREATMENT AND ROOF SHEET AND OTHER CONNECTED B/R WORKS AT AIR FORCE STATION UDHAMPUR
2025_MES_716912_1
GEAFU-17/2024-25
Open Tender
Civil Works
Item Rate
270 days
GE (AF) STATION UDHAMPUR
REPAIRS / REPLACEMENT TO ROOFS TREATMENT AND ROOF SHEET AND OTHER CONNECTED B/R WORKS AT AIR FORCE STATION UDHAMPUR
8 documents required · 8 mandatory
₹500
GE (AF) UDHAMPUR
₹80,000
7 Aug 2025
26 Jun 2025
19 Jul 2025
26 Jun 2025
17 Jul 2025
10 Jul 2025
26 Jun 2025 - 3 Jul 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .