| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC LIG 154 BUDH VIHAR PART C BYPASS ROAD TARAMANDAL GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | ₹2.8 Cr | L1 | Accepted-AOC l1 |
| 2 | L2₹2.9 CrRejected-Finance | ₹2.9 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹3.0 CrRejected-Finance | ₹3.0 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹3.0 CrRejected-Finance | ₹3.0 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹3.1 CrRejected-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹3.1 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Reena Singh L14 | Desh Dipak Pandey L13 | M/S CHAUDHARY ENTERPRISES L5 | M/S OBELION CONSTRUCTIONS L2 | Sai Construction L6 | M/s B.B.Goyal L11 | M/s Rai Construction L8 | M/S RAVINDRA SINGH L10 | M/S V.K. CONSTRUCTION L7 | M/S JAI BAJRANG BALI CONSTRUCTION L4 | NIKHIL CONSTRUCTION L9 | VIRAT CONSTRUCTION L3 | M/S R K CONSTRUCTION L12 | M/S SHUKLA ASSOCIATES L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work for making river bank slope by mechanical equipment including lead upto 30m & lift upto 1.5 m, excluding Mechanical compaction but including manual compaction and dressing to proper profiles or as directed by Enginee-in-Charge including all cost of labour, material, T&P and all taxes excluding GST. | 14,116 | Cum. | 130 ₹18.4 L | 130 ₹18.4 L | 120 ₹16.9 L | 77.86 ₹11.0 L | 40 ₹5.6 L | 117 ₹16.5 L | 90 ₹12.7 L | 116 ₹16.4 L | 97.89 ₹13.8 L | 110.46 ₹15.6 L | 100 ₹14.1 L | 109 ₹15.4 L | 124.48 ₹17.6 L | 99 ₹14.0 L |
| 2.00 | Providing and fixing of porcupines set constructed by concrete of grade 1:1.5:3 with 4 Nos FE 500D mains bars and stirrups at 300mm c/c. Fixing according to the plan of works including cost of all material, labour and T&P etc. For proper completion of work. Excluding GST. | 700 | Set | 10,000 ₹70 L | 10,000 ₹70 L | 10,000 ₹70 L | 9,600 ₹67.2 L | 7,995 ₹56.0 L | 9,100 ₹63.7 L | 9,000 ₹63 L | 8,500 ₹59.5 L | 9,890.39 ₹69.2 L | 8,498.12 ₹59.5 L | 8,900 ₹62.3 L | 8,400 ₹58.8 L | 9,575.96 ₹67.0 L | 7,800 ₹54.6 L |
| 3.00 | Providing and laying of Jhankhar/ behaya for filling in screen (gaps) of porcupine including cost of material labour and T&P etc. complete. Excluding GST. | 1,134 | Cum. | 465 ₹5.3 L | 450 ₹5.1 L | 450 ₹5.1 L | 250 ₹2.8 L | 398 ₹4.5 L | 423 ₹4.8 L | 350 ₹4.0 L | 451 ₹5.1 L | 403.5 ₹4.6 L | 399.37 ₹4.5 L | 200 ₹2.3 L | 395 ₹4.5 L | 450.02 ₹5.1 L | 359 ₹4.1 L |
| 4.00 | Providing and laying of new empty HDPE woven bag filled with local earth in screen of porcupine including cost of material labour and T&P etc. Excluding GST. | 14,175 | Nos. | 41 ₹5.8 L | 40 ₹5.7 L | 38 ₹5.4 L | 28 ₹4.0 L | 30 ₹4.3 L | 38.51 ₹5.5 L | 35 ₹5.0 L | 41 ₹5.8 L | 34.5 ₹4.9 L | 36.36 ₹5.2 L | 37 ₹5.2 L | 35 ₹5.0 L | 40.97 ₹5.8 L | 33.29 ₹4.7 L |
| 5.00 | Providing and Laying of Nylon Crate of size 1x1x1m filled with Local Earth in E.C. bags below porcupine including cost of material labour and T&P etc. Excluding GST. | 8,400 | Nos. | 1,130 ₹94.9 L | 1,130 ₹94.9 L | 800 ₹67.2 L | 759.99 ₹63.8 L | 950 ₹79.8 L | 1,100 ₹92.4 L | 1,000 ₹84 L | 1,021 ₹85.8 L | 971.6 ₹81.6 L | 936.59 ₹78.7 L | 1,050 ₹88.2 L | 953 ₹80.1 L | 1,085.8 ₹91.2 L | 879 ₹73.8 L |
| 6.00 | Providing & Laying/Dumping of high performance woven geotextile bags of size (1.00mx0.75m) of 200 GSM manufactured from 100% PP multifilament yarn by machine in cross direction, woven into stable network such that the yarn retains their relative position and have high UV resistance, inert to biological degradation and resistance to naturally encountered chemicals like acids and alkalies after filling with local earth and sewing with geo materials with sewing MIC laying at work site excluding all taxes but including contractor's profit, cost of all materials, labour, T&P etc. as required for proper completion of work. | 19,133 | Nos. | 268 ₹51.3 L | 265 ₹50.7 L | 260 ₹49.7 L | 229.99 ₹44.0 L | 268 ₹51.3 L | 250 ₹47.8 L | 250 ₹47.8 L | 261 ₹49.9 L | 235.6 ₹45.1 L | 229.33 ₹43.9 L | 252 ₹48.2 L | 226 ₹43.2 L | 258.39 ₹49.4 L | 209 ₹40.0 L |
| 7.00 | Providing and laying of 200 GSM woven multifilament polypropylene yarn Geo textile Sheet on slope as directed by Engineer in Charge including all taxes, cost of all materials, labours, T&P etc. but excluding GST required for proper completion of work. | 12,312 | Sqm | 120 ₹14.8 L | 120 ₹14.8 L | 110 ₹13.5 L | 118 ₹14.5 L | 119.4 ₹14.7 L | 115 ₹14.2 L | 100 ₹12.3 L | 120 ₹14.8 L | 99.89 ₹12.3 L | 101.97 ₹12.6 L | 112 ₹13.8 L | 101 ₹12.4 L | 114.9 ₹14.1 L | 89 ₹11.0 L |
| 8.00 | Providing and fixing of 9mm, 4 strands Polypropelene Rope Gabion of 1.8m x 1.8m x0.5m size with lid & slings, 150x150 mm mesh size confirming to IS 5175:1992 (reaffirmed 1997) after laying/Dumping of 12 Nos. geotextile bags filled with local earth and sewing with geo materials with sewing MIC laying at work site excluding all taxes but including contractor's profit, cost of all materials (including cost of geotextile bags filled with local earth and sewing with geo materials), labour, T&P etc. as required for proper completion of work. | 1,944 | Nos. | 4,860 ₹94.5 L | 4,850 ₹94.3 L | 4,000 ₹77.8 L | 4,299 ₹83.6 L | 4,715 ₹91.7 L | 4,800 ₹93.3 L | 4,500 ₹87.5 L | 4,500 ₹87.5 L | 4,252.69 ₹82.7 L | 4,153.46 ₹80.7 L | 4,550 ₹88.5 L | 4,105 ₹79.8 L | 4,680.26 ₹91.0 L | 3,809 ₹74.0 L |
| 9.00 | Bamboo bracing of outer side of porcupines with bamboo of 50 To 80 mm dia. including cost of bamboo, other necessary material, labour etc. Excluding GST. | 3,120 | RM | 85 ₹2.7 L | 85 ₹2.7 L | 80 ₹2.5 L | 80 ₹2.5 L | 80 ₹2.5 L | 76 ₹2.4 L | 50 ₹1.6 L | 81 ₹2.5 L | 71 ₹2.2 L | 72.23 ₹2.3 L | 81 ₹2.5 L | 71 ₹2.2 L | 81.39 ₹2.5 L | 59 ₹1.8 L |
Tender Value
Refer Docs
EMD Value
₹7.3 L
Closing Date
13 Mar 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER
O/O XITH CIRCLE IRRIGATION WORKS AYODHYA
NIT06 LOT09
2026_UPIDC_1122365_9
06/SE-XI/2025-26
Open Tender
Civil Works
90 days
TANDA AMBEDKAR ANGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,963
₹7.3 L
O/O XITH CIRCLE IRRIGATION WORKS AYODHYA
9 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
Earth work for making river bank slope by mechanical equipment including lead upto 30m & lift upto 1.5 m, excluding Mechanical compaction but including manual compaction and dressing to proper profiles or as directed by Enginee-in-Charge including all cost of labour, material, T&P and all taxes excluding GST.
Providing and fixing of porcupines set constructed by concrete of grade 1:1.5:3 with 4 Nos FE 500D mains bars and stirrups at 300mm c/c. Fixing according to the plan of works including cost of all material, labour and T&P etc. For proper completion of work. Excluding GST.
Providing and laying of Jhankhar/ behaya for filling in screen (gaps) of porcupine including cost of material labour and T&P etc. complete. Excluding GST.
Providing and laying of new empty HDPE woven bag filled with local earth in screen of porcupine including cost of material labour and T&P etc. Excluding GST.
Providing and Laying of Nylon Crate of size 1x1x1m filled with Local Earth in E.C. bags below porcupine including cost of material labour and T&P etc. Excluding GST.
Providing & Laying/Dumping of high performance woven geotextile bags of size (1.00mx0.75m) of 200 GSM manufactured from 100% PP multifilament yarn by machine in cross direction, woven into stable network such that the yarn retains their relative position and have high UV resistance, inert to biological degradation and resistance to naturally encountered chemicals like acids and alkalies after filling with local earth and sewing with geo materials with sewing MIC laying at work site excluding all taxes but including contractor's profit, cost of all materials, labour, T&P etc. as required for proper completion of work.
Providing and laying of 200 GSM woven multifilament polypropylene yarn Geo textile Sheet on slope as directed by Engineer in Charge including all taxes, cost of all materials, labours, T&P etc. but excluding GST required for proper completion of work.
Providing and fixing of 9mm, 4 strands Polypropelene Rope Gabion of 1.8m x 1.8m x0.5m size with lid & slings, 150x150 mm mesh size confirming to IS 5175:1992 (reaffirmed 1997) after laying/Dumping of 12 Nos. geotextile bags filled with local earth and sewing with geo materials with sewing MIC laying at work site excluding all taxes but including contractor's profit, cost of all materials (including cost of geotextile bags filled with local earth and sewing with geo materials), labour, T&P etc. as required for proper completion of work.
Bamboo bracing of outer side of porcupines with bamboo of 50 To 80 mm dia. including cost of bamboo, other necessary material, labour etc. Excluding GST.
Please Enable Macros to View BoQ information
stage.html
html • 0.09 MB
techsummary_2089900.pdf
BOQ Comparative Chart
xlsx
finsummary_2089900.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
lot09document.pdf
Tender Documents • 3.04 MB
BOQ_2089900.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid