| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.0 LAccepted-AOC | ₹35.0 L Quoted ₹36.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹43.2 LRejected-AOC PLOT NO 41 T H ROAD KESAVAPURAM MINJUR 601 203 | THIRUVALLUR | TAMIL NADU | 601203 | ₹43.2 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHARTHI TECKMA CONTRACTS L2 | SS ELECTRONICS L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for disconnection of cables of WWSB’s and APH soot blowers cleaning and tightness checking terminal blocks, local push buttons and reconnection of cables & providing assistance to setting of limit switches as instructed by our maintenance engineers. (Including consumables and T&P items) | 1,160 | Nos | 1,300 ₹15.1 L | 1,100 ₹12.8 L |
| 2.00 | Charges for setting of open/close limit, open/close torque limit switches, replacing defective electronic cards and motor (Up to 3.7kW), checking of control & power circuits, as instructed by Maintenance Engineer in charge. (Including consumables and T&P items) | 300 | Nos | 1,800 ₹5.4 L | 1,480 ₹4.4 L |
| 3.00 | Charges for cleaning of motorized actuators and covering with polyethylene cover with proper tie arrangement in order to avoid water and dust entry inside the actuators. (Including consumables and T&P items) | 1,476 | Nos | 270 ₹4.0 L | 220 ₹3.2 L |
| 4.00 | Charges for testing of protection relays and attending defects, replacing defective Relays, transducers and meters, CT terminal tightness checking in 11 KV, 3.3KV, 415 V switchgear panels as instructed by Maintenance Engineer in charge. (Including consumables and T&P items) | 40 | Nos | 1,200 ₹48,000 | 1,000 ₹40,000 |
| 5.00 | Charges for checking control circuits, replacing defective relays, transducers, meters, CT & VT terminal tightness checking and attending defects reported by operator in control panels like GRP, DAVR, BTS, RTCC, ECP, DATA Concentrator, DG Set, TDBFP EOP, Main turbine EOP, testing of relays in GRP panel as instructed by Maintenance Engineer in charge. (Including consumables and T&P items) | 60 | Nos | 2,500 ₹1.5 L | 2,050 ₹1.2 L |
| 6.00 | Charges for cleaning GRP, DAVR, BTS, RTCC, ECP, DATA Concentrator, TDBFP and Main Turbine EOP Panels and relay compartments in 11KV, 3.3 KV, 415 V Switchgear panels. (Including consumables and T&P items) | 480 | Nos | 100 ₹48,000 | 90 ₹43,200 |
| 7.00 | Charges for light up works, which includes checking the healthiness of protective equipment, ensuring the permissive for pre-synchronization and post synchronization, as instructed by Maintenance Engineer in charge. (Including consumables and T&P items) | 20 | Nos | 2,100 ₹42,000 | 1,800 ₹36,000 |
| 8.00 | Charges for attending defects in Thyristor Bridges, Blowers, Control and LCI panels, replacing defective electronic modules, relays, Thyristor Bridges, timers, power & auxiliary contactors, checking of control circuits and terminal tightness of ID Fan VFD control. (Including consumables and T&P items) | 60 | Nos | 3,500 ₹2.1 L | 2,900 ₹1.7 L |
| 9.00 | Charges for cleaning of Thyristor Bridges, Blowers, Control and LCI panels of ID fan VFD. (Including consumables and T&P items).
Cleaning of 22 Nos panel/Shift= One operation. i.e., total operations= 39. | 60 | Opn | 2,500 ₹1.5 L | 2,000 ₹1.2 L |
| 10.00 | Charges for the Works of Coordinating/assisting with operation wing for Carrying out Manual operation of Long Retractable Soot Blower (LRSB) during day shift and attending defects/problems such as Cleaning and tightness checking of terminal blocks local push buttons and reconnection of cables & providing assistance to setting of limit switches during the course of manual operation of LRSB. (Including consumables and T&P items)
(1 Operation = Manual operation of 5 Nos of LRSB) | 320 | Opn | 1,800 ₹5.8 L | 1,470 ₹4.7 L |
Tender Value
Refer Docs
EMD Value
₹30,200
Closing Date
25 Mar 2025, 2:00 pmClosed
SEES NCTPS-II
OFFICE OF SEES
SP.109 NCTPS-II ES circle MRT Division Unit II Generator Turbine and Boiler areas and their Auxiliaries Time Bound Contract works for the Routine Maintenance of MRT equipment for a period of 360 Days upto 31 03 2026 from the date of taking over
2025_EB_531618_1
CE NCTPS II SE ES MRT SPEC NO 109 24 to25
Open Tender
Electrical and Maintenance Works
360 days
NCTPS-II
AS PER TENDER SPECIFICATION
2 documents required · 2 mandatory
₹0
₹30,200
Yes
13 May 2026
11 Mar 2025
26 Mar 2025
11 Mar 2025
25 Mar 2025
11 Mar 2025
Amount
Charges for disconnection of cables of WWSB’s and APH soot blowers cleaning and tightness checking terminal blocks, local push buttons and reconnection of cables & providing assistance to setting of limit switches as instructed by our maintenance engineers. (Including consumables and T&P items)
Charges for setting of open/close limit, open/close torque limit switches, replacing defective electronic cards and motor (Up to 3.7kW), checking of control & power circuits, as instructed by Maintenance Engineer in charge. (Including consumables and T&P items)
Charges for cleaning of motorized actuators and covering with polyethylene cover with proper tie arrangement in order to avoid water and dust entry inside the actuators. (Including consumables and T&P items)
Charges for testing of protection relays and attending defects, replacing defective Relays, transducers and meters, CT terminal tightness checking in 11 KV, 3.3KV, 415 V switchgear panels as instructed by Maintenance Engineer in charge. (Including consumables and T&P items)
Charges for checking control circuits, replacing defective relays, transducers, meters, CT & VT terminal tightness checking and attending defects reported by operator in control panels like GRP, DAVR, BTS, RTCC, ECP, DATA Concentrator, DG Set, TDBFP EOP, Main turbine EOP, testing of relays in GRP panel as instructed by Maintenance Engineer in charge. (Including consumables and T&P items)
Charges for cleaning GRP, DAVR, BTS, RTCC, ECP, DATA Concentrator, TDBFP and Main Turbine EOP Panels and relay compartments in 11KV, 3.3 KV, 415 V Switchgear panels. (Including consumables and T&P items)
Charges for light up works, which includes checking the healthiness of protective equipment, ensuring the permissive for pre-synchronization and post synchronization, as instructed by Maintenance Engineer in charge. (Including consumables and T&P items)
Charges for attending defects in Thyristor Bridges, Blowers, Control and LCI panels, replacing defective electronic modules, relays, Thyristor Bridges, timers, power & auxiliary contactors, checking of control circuits and terminal tightness of ID Fan VFD control. (Including consumables and T&P items)
Charges for cleaning of Thyristor Bridges, Blowers, Control and LCI panels of ID fan VFD. (Including consumables and T&P items). Cleaning of 22 Nos panel/Shift= One operation. i.e., total operations= 39.
Charges for the Works of Coordinating/assisting with operation wing for Carrying out Manual operation of Long Retractable Soot Blower (LRSB) during day shift and attending defects/problems such as Cleaning and tightness checking of terminal blocks local push buttons and reconnection of cables & providing assistance to setting of limit switches during the course of manual operation of LRSB. (Including consumables and T&P items) (1 Operation = Manual operation of 5 Nos of LRSB)
Charges for daily walk down to 11KV, 3.3 KV, 415V switchgears, incomers and bus coupler panels, GRP, DAVR, VFD to check the healthiness of relay, meters and record the electrical parameters. (Including consumables and T&P items)
SHARTHI TECKMA CONTRACTS (BID ID -1277875)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_632741.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid