Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 21 A 21 B SWAMI VIVEKANAND NAGAR SAIFUL VIJAPUR ROAD SOLAPUR DIST SOLAPUR 413004 | SOLAPUR | MAHARASHTRA | 413004 | Accepted-Technical Accepted |
| 2 | Accepted-Technical SAIFULL 36B KOLI SAMAJ SOCIETY VIJAPUR ROAD SOLAPUR DIST SOLAPUR PIN 413004 | SOLAPUR | MAHARASHTRA | 413004 | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Accepted-Technical RAJUR TAL SOUTH SOLAPUR DIST SOLAPUR PIN 413001 | SOLAPUR | SOUTH SOLAPUR | MAHARASHTRA | 413001 | Accepted-Technical Accepted |
Tender Value
₹49.4 L
EMD Value
₹50,000
Closing Date
2 Jul 2026, 5:00 pmClosed
E E WORKS DIV 01 Z P SOLAPUR
E E WORKS DIV 01 Z P SOLAPUR
Improvement to Auj Mandrup to Yelure Wasti Prem Nagar road VR No 105 Ch No 1/00 to 2/500 Tal South Solapur
2026_SOLAP_1311453_2
10/2026-27
Open Tender
Civil Works - Roads
Percentage
180 days
Improvement to Auj Mandrup to Yelure Wasti Prem Na
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹50,000
22 Jul 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
2 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for removing grass, thorney shrubs, Jungli shrub,Kubabul and alike grass along roadside making the groundclean by showel and phavaras etc. complete | 2,340 | Sqm | 7 | ₹16,380 |
| 2 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 18 | Cum | 119 | ₹2,142 |
| 3 | Picking the road surface including sectioning etc. complete (BT surface.) | 2,414.5 | Sqm | 44 | ₹1,06,238 |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening / binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means. Grading-II (Using Screening Type B (11.2 mm) Aggregate) | 405 | Cum | 2,770.85 | ₹11,22,194.25 |
| 5 | Providing and constructing 75 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubble obtained by blasting) heating and spraying the bitumen of specified grade @ 2 Kg/sqm, spreading 12 mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface. (VG-30 bulk bitumen rates are considered to arrive at rates) | 3,750 | Sqm | 331.95 | ₹12,44,812.5 |
| 6 | Open Graded Premix Surfacing - Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade-USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller (Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) | 3,750 | Sqm | 231.5 | ₹8,68,125 |
| 7 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 Kg/Sqm by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) | 3,750 | Sqm | 82.95 | ₹3,11,062.5 |
| 8 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | 450 | Cum | 638.3 | ₹2,87,235 |
| 9 | Spreading hard murum for side width etc. complete | 450 | Cum | 79 | ₹35,550 |
| 10 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. | 2,250 | Sqm | 21 | ₹47,250 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.29 MB
Tendernotice_2.pdf
PDF • 2.26 MB
BOQ_2249583.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .