Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.8 L+₹8,058.40 (4.81%)Admitted-Finance ANANTNAG ANANTNAG JAMMU AND KASHMIR | ANANTNAG | JAMMU AND KASHMIR | 192101 | L2 | Admitted-Finance | ||
| 3 | L3₹2.5 L+₹81,896.41 (48.9%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.6 L
EMD Value
₹5,240
Closing Date
30 Jul 2026, 6:00 pmClosed
XEN REW JAMMU
OFFICE OF THE EXECUTIVE ENGINEER REW JAMMU
D/E for Const. of nallah from Shubham Sharma Memorial gate to onwards vill Fatehpur Shekhian panchayat Flora BlockSuchetgarh under District capex PRI 26-27
2026_RDPR_316608_5
e-NIT No. 180 REWJ of 2026-27 dated 17-07-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,240
13 Aug 2026
17 Jul 2026
31 Jul 2026
17 Jul 2026
30 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | - | cum | 479.3 | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | CUM | 4,826.5 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | cum | 5,733.6 | - |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 7,788.4 | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. | 1 | kg | 123.2 | ₹123.08 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: foundation | - | sqm | 286.35 | - |
| 7 | For Slab | - | sqm | 718.2 | - |
| 8 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) . | - | sqm | 416.5 | - |
| 9 | 12 mm thick plaster in 1:6 mix | 1 | sqm | 266.2 | ₹265.93 |
| 10 | Sand & Agg 30 km | 1 | cum | 520.34 | ₹519.82 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_1033308.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .