Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC 77 28 WANOWRIE OPP HANDICAP SCHOOL PUNE 411 040 | PUNE | PUNE | MAHARASHTRA | 411040 | ₹2.9 Cr | L1 | Accepted-AOC Being Reasonable And Accepted |
| 2 | L2₹3.2 Cr+₹26.8 L (9.19%)Rejected-AOC RAVI KIRAN MARKET JIWAJI CHOWK BADA LASHKAR GWALIOR M P 474001 | GWALIOR | GWALIOR | MADHYA PRADESH | 474001 | ₹3.2 Cr+₹26.8 L (9.19%) | L2 | Rejected-AOC Other Than L1 |
| 3 | L3₹3.3 Cr+₹42.7 L (14.6%)Rejected-AOC 401 7 32 CIVIL LINES ROORKEE HARIDWAR UP 247 667 | ROORKEE | HARIDWAR | UP | 247667 | ₹3.3 Cr+₹42.7 L (14.6%) | L3 | Rejected-AOC Other Than L1 |
| 4 | L4₹3.4 Cr+₹44.0 L (15.1%)Rejected-AOC | ₹3.4 Cr+₹44.0 L (15.1%) | L4 | Rejected-AOC Other Than L1 |
| 5 | L5₹3.4 Cr+₹48.5 L (16.6%)Rejected-AOC 27 2 1ST MAIN ROAD GOKULA 1ST STAGE 1ST PHASE BANGALORE 560054 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560054 | ₹3.4 Cr+₹48.5 L (16.6%) | L5 | Rejected-AOC Other Than L1 |
| Sl No | Description | Qty | Unit | Khanuja Industries L1 | George Electricals L5 | R.C.Bidave L6 | S G Enterprises L4 | RAVINDRA SALES L2 | KHANDELWAL ASSOCIATES L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Schedule "A" Part I (B/R) Works | |||||||||
| 2.00 | Demolition of cement concrete of any description and in any position, including removal of all filling materials up to plinth beam level, returning and refilling the same materials after completion of structural rehabilitation works, including compaction, complete in all respects, as specified and as directed by the Engineer-in-Charge. | 5 | Per Cubic Metre | 300 ₹1,500 Lowest | 350 ₹1,750 | 2,400 ₹12,000 | 500 ₹2,500 | 500 ₹2,500 | 360 ₹1,800 |
| 3.00 | Dismantling of floor, hearth, or wall tiling, including cement mortar bedding (excluding backing), removing serviceable tiles to store, and disposing of unusable tiles/rubbish off the premises, complete all as specified and directed by the Engineer-in-Charge. | 50 | Per Square Metre | 10 ₹500 Lowest | 10 ₹500 Lowest | 140 ₹7,000 | 25 ₹1,250 | 60 ₹3,000 | 15 ₹750 |
| 4.00 | M&L cement concrete Type B0 (1:2:4) using 12.5 mm graded coarse aggregate, 40 mm thick, laid in flooring, levelling, or other approved surfaces, including mixing, laying, compacting, and finishing, complete as specified and directed by the Engineer-in-Charge. | 50 | Per Square Metre | 100 ₹5,000 | 500 ₹25,000 | 650 ₹32,500 | 175 ₹8,750 | 500 ₹25,000 | 75 ₹3,750 Lowest |
| 5.00 | M&L for glazed joint-free ceramic coloured tiles of coloured designer pattern 600x300x7-8 mm thick, fixed on vertical surfaces such as skirting, dado, etc.; set and jointed in white cement to match;including 10 mm thick backing coat in cement mortar (1:4), complete all as specified and directed by the Engineer-in-Charge. | 50 | Per Square Metre | 900 ₹45,000 Lowest | 1,450 ₹72,500 | 2,400 ₹1,20,000 | 1,150 ₹57,500 | 900 ₹45,000 Lowest | 990 ₹49,500 |
| 6.00 | Demolition of stone slabs or tiles of any type, description, or thickness, including removal of all existing floor, skirting, hardstanding, apron or similar surfaces, regardless of size or pattern, carefully breaking up and taking down the tiles/slabs along with their bedding layers and pointing done in cement mortar. Work includes removing all debris, disposing of unserviceable material off the site, and cleaning the demolished area, all complete as specified and directed. | 5 | Per Ten Square Metre | 100 ₹500 Lowest | 2,200 ₹11,000 | 1,400 ₹7,000 | 250 ₹1,250 | 650 ₹3,250 | 150 ₹750 |
| 7.00 | M&L for marble work 18 to 20 mm thick, machine-cut, matched with existing colour and texture, laid in floors and similar locations. Marble to be bedded, jointed and pointed with grey cement slurry, including cutting to required shape and size and machine polishing to achieve uniform finish. Work shall be executed over and including a 20 mm thick screed bed in CM 1:6, complete all as specified and directed. | 50 | Per Square Metre | 2,500 ₹1,25,000 Lowest | 4,200 ₹2,10,000 | 4,200 ₹2,10,000 | 3,375 ₹1,68,750 | 3,000 ₹1,50,000 | 3,600 ₹1,80,000 |
| 8.00 | Taking down chowkat with shutter(without taking off shutter from the frame) area exc 1.5 sqm ann n.exc 4.0 sqm in each, complete all as specified and directed. | 5 | Each | 50 ₹250 Lowest | 450 ₹2,250 | 2,500 ₹12,500 | 200 ₹1,000 | 100 ₹500 | 360 ₹1,800 |
| 9.00 | Resecuring or easing and adjusting of aluminium door, wooden door shutter, toughened glass door, or fixed-type aluminium window, including all accessories (area of each door shutter exceeding 2.00 sqm but not exceeding 4.00 sqm per leaf), with or without taking down the shutter from the existing frame, for petty repairs such as adjustment of hinges, handles, etc., during execution of civil works, and making the shutter fully functional, complete in all respects, as specified and as directed by the Engineer-in-Charge.
Note:
If door shutters are taken down, the same shall be carefully stored at the site by the Contractor at his own arrangement until completion of civil works and shall be re-fixed in the same opening as directed by the Engineer-in-Charge. Any damage noticed by the Engineer-in-Charge shall be rectified/repaired by the Contractor at his own cost | 10 | Each Job | 300 ₹3,000 Lowest | 4,000 ₹40,000 | 15,000 ₹1,50,000 | 1,500 ₹15,000 | 5,000 ₹50,000 | 600 ₹6,000 |
| 10.00 | Demolition of brick work or stone/boulder masonry built in cement mortar, in order to part demolition, including all quoins, arches, pillars etc., but excluding ashlar facings, dressed stone work, and precast PCC blocks, complete all as specified and directed. | 17.5 | Per Cubic Metre | 300 ₹5,250 Lowest | 1,150 ₹20,125 | 1,800 ₹31,500 | 450 ₹7,875 | 500 ₹8,750 | 450 ₹7,875 |
Tender Value
₹3.7 Cr
EMD Value
₹4.5 L
Closing Date
5 Mar 2026, 6:00 pmClosed
Chief Engineer Pune Zone
HQ Chief Engineer Pune Zone Camp, Pune 411001
STRUCTURAL REHABILITATION TO BUILDING NO P-220 (DIAMOND JUBILEE BLOCK) UNDER GE (C) PUNE
2026_MES_751035_1
84670
Open Tender
Civil Works
Item Rate
120 days
GE (Central) Pune
Class A and Cat a(i)
7 documents required · 7 mandatory
₹3,000
Garrison Engineer (Central) Pune
₹4.5 L
Yes
11 May 2026
5 Feb 2026
12 Mar 2026
5 Feb 2026
5 Mar 2026
26 Feb 2026
6 Feb 2026 - 13 Feb 2026
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
84670-STRUCTURAL-REHAB.pdf
Tender Documents • 5.29 MB
BOQ_841722.xls
BOQ • 27.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .