| Sl No | Description | Qty | Unit | VIRANI ENGICON L3 | NAGENDRA KUMAR PANDEY L2 | PANKAJ TIWARI L4 | Oxone Infratech Private limited L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | 1.0 Design, construction, testing and commissioning of 1.25 MLD sewage treatment plant Based Constructed Wetland .
2.0 Construction of RCC Drain 50 m Length.
3.0 Construction 1.0 No Interception and Diversion Structure at Nallah Outfall.
4.0 Construction of Pumping Station at outfalls as per design requirements total no.’s- 1 with capacity of 1.25 MLD.
5.0 Laying of pumping main of Dia. 200 mm DI-K7 Pipe length- 1000 M for conveyance of sewage and treated water to the STP / disposal points of length.
6.0 Establishment of HT Feeder Line length-2400 m. for STP and lift stations.
7.0 Ancillary and allied works, including fencing of length-160 m., site development, and all appurtenant structures required for complete and functional commissioning of the project. | 1 | Lump-Sum | 3,88,00,000 ₹3,88,00,000 | 3,88,08,310 ₹3,88,08,310 | 3,90,00,000 ₹3,90,00,000 | 3,85,64,350.5 ₹3,85,64,350.5 Lowest |
| 2.01 | Operation and Maintenance Cost next 10 Years 1st Year | 1 | Lump-Sum | 10,92,000 ₹10,92,000 | 10,91,000 ₹10,91,000 | 9,94,000 ₹9,94,000 | 9,84,328.8 ₹9,84,328.8 Lowest |
| 3.01 | 2nd Year | 1 | Lump-Sum | 11,57,520 ₹11,57,520 | 11,47,500 ₹11,47,500 | 10,53,500 ₹10,53,500 | 10,43,041.2 ₹10,43,041.2 Lowest |
| 4.01 | 3rd Year | 1 | Lump-Sum | 12,26,971 ₹12,26,971 | 12,26,971 ₹12,26,971 | 11,16,600 ₹11,16,600 | 11,05,991.6 ₹11,05,991.6 Lowest |
| 5.01 | 4th Year | 1 | Lump-Sum | 13,00,589 ₹13,00,589 | 13,00,589 ₹13,00,589 | 11,83,600 ₹11,83,600 | 11,72,220.8 ₹11,72,220.8 Lowest |
| 6.01 | 5th Year | 1 | Lump-Sum | 13,78,624 ₹13,78,624 | 13,78,624 ₹13,78,624 | 12,54,600 ₹12,54,600 | 12,42,829.5 ₹12,42,829.5 Lowest |
| 7.01 | 6th Year | 1 | Lump-Sum | 14,61,341 ₹14,61,341 | 14,61,341 ₹14,61,341 | 12,30,000 ₹12,30,000 Lowest | 13,17,106.6 ₹13,17,106.6 |
| 8.01 | 7th Year | 1 | Lump-Sum | 15,49,021 ₹15,49,021 | 15,49,021 ₹15,49,021 | 14,09,800 ₹14,09,800 | 13,96,411.4 ₹13,96,411.4 Lowest |
| 9.01 | 8th Year | 1 | Lump-Sum | 16,41,962 ₹16,41,962 | 16,41,962 ₹16,41,962 | 14,95,000 ₹14,95,000 | 14,79,079.4 ₹14,79,079.4 Lowest |
| 10.01 | 9th Year | 1 | Lump-Sum | 17,40,480 ₹17,40,480 | 17,40,480 ₹17,40,480 | 15,83,900 ₹15,83,900 | 15,67,998.4 ₹15,67,998.4 Lowest |
Tender Value
₹4.3 Cr
EMD Value
₹2.1 L
Closing Date
18 May 2026, 5:30 pmClosed
CMO NAGAR PARISHAD HANUAMAN
CMO NAGAR PARISHAD HANUAMAN
INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR HANUMANA TOWN
2026_UAD_500887_1
143/Nivida/NP/2026 dated 15-04-2026
Open Tender
Civil Works - Water Works
Lump-sum
365 days
HANUMANA
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹2.1 L
21 Jul 2026
16 Apr 2026
20 May 2026
16 Apr 2026
18 May 2026
16 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 1.0 Design, construction, testing and commissioning of 1.25 MLD sewage treatment plant Based Constructed Wetland .
2.0 Construction of RCC Drain 50 m Length.
3.0 Construction 1.0 No Interception and Diversion Structure at Nallah Outfall.
4.0 Construction of Pumping Station at outfalls as per design requirements total no.’s- 1 with capacity of 1.25 MLD.
5.0 Laying of pumping main of Dia. 200 mm DI-K7 Pipe length- 1000 M for conveyance of sewage and treated water to the STP / disposal points of length.
6.0 Establishment of HT Feeder Line length-2400 m. for STP and lift stations.
7.0 Ancillary and allied works, including fencing of length-160 m., site development, and all appurtenant structures required for complete and functional commissioning of the project. | - | Lump-Sum | - | - |
| 2.01 | Operation and Maintenance Cost next 10 Years 1st Year | - | Lump-Sum | - | - |
| 3.01 | 2nd Year | - | Lump-Sum | - | - |
| 4.01 | 3rd Year | - | Lump-Sum | - | - |
| 5.01 | 4th Year | - | Lump-Sum | - | - |
| 6.01 | 5th Year | - | Lump-Sum | - | - |
| 7.01 | 6th Year | - | Lump-Sum | - | - |
| 8.01 | 7th Year | - | Lump-Sum | - | - |
| 9.01 | 8th Year | - | Lump-Sum | - | - |
| 10.01 | 9th Year | - | Lump-Sum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tendernotice_2.pdf
PDF • 2.05 MB
Tendernotice_3.pdf
PDF • 2.04 MB
BOQ_603456.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].