| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | -31.82% | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 CrAdmitted-Finance | -21.39% | ₹2.1 Cr | L2 | Admitted-Finance |
Tender Value
₹7.8 Cr
EMD Value
₹15.7 L
Closing Date
10 Feb 2026, 6:00 pmClosed
Unit Head RIICO Neermana
Office of The Unit Head RIICO Ltd Neemrana
as per BoQ
2026_RIICO_530404_1
30/2025-2026/2475/01-02/02
Open Tender
Civil Works
365 days
Keshwana
as per TD
3 documents required · 3 mandatory
₹5,900
RIICO
₹15.7 L
Neemrana
20 Feb 2026
21 Jan 2026
11 Feb 2026
21 Jan 2026
10 Feb 2026
21 Jan 2026
28 Jan 2026
Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses & Granular Courses
Compacting soil at optimum moisture content with power road roller including watering soil at O.M.C., charges of T & P, cost of water and finishing of formation to required camber and grade etc. complete in layers not exceeding 15 cm. compacted thickness, 95% proctor density.
"Granular Sub-Base with Close Graded Material (Table:- 400-1) Plant Mix Method Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For grading III material"
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Construction of un-reinforced , plain cement concrete pavement M-40 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602.2.2 , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using Fixed Form Paver and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately).
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. 300 mm dia
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils
Providing and Fixing of Dowel Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge.
Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricks, Cement mortar 1 : 6 (1 cement : 6 coarse sand)
Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete, Building Rubbish Stone metal (Grit and ballast etc.) For 5 Km.
Please Enable Macros to View BoQ information
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per MoRTH Specification Clause 305.4.3
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 505 complete in all respects. Bitumen (VG-30), Grading - II (26.50 mm (Nominal Size))
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 507 complete in all respects , for Grading-II(13 mm nominal size) Bitumen (VG-30)
Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements.
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr. : All kinds of soil
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size).
Providing and Fixing in position precast reinforced cement concrete FT-FIume as per design and shape, using coerce aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland / PortIand Iag cement, admixtures In recommended proportion as per IS: 456-2000 and standard like lndlan standard, International standards viz. Japanese Industrial Standards (JIS)/ UG standard/EU standard/ having of strength not less than M-50. using Thermo- Mechanically Treated bare. (TMT/TMX) FE SOOD or mora confirming to IS 1786 reinforcement bar and capable of carrying a wheel load of 5.0 Tones for heavy vehicle movement. Precast reinforced cement concrete drains using, Stormwater/roadside drain, etC. Rate Includes all cost of material, labor charges at the plant, cost of reinforcement, formwork and lifting accessories, and transportation upto work at the she Rate excluded unloading the material at sites, llds and llft. All work up to plinth level: making necessary holes of required sizes for carrying through service Iines etc., providing steel hooks for lifting, etc. .the work exalting as per the direction of Engineer In-charge. Note:-Rate shall also Include technical assistance for the instaIIatIon of products at one time., Precast RCC FT-FLUME (HEIGHT-1000 Precast) Wall Width 90mm (H1: 1105), FT Flume Drain (1000 X 1000 X 2000)
Providing and fixing factory-made precast RCC U-shape drain (Precast FT Flume) drain covers, having of strength not less than M-50, using Thermo-Mechanically Treated bars. (TMT/TMX) FE 500D or more conforming to IS 1786 reinforcement bar As per standard size reinforced with 8 mm dia main longitudinal & 6 mm nos cross-sectional T.M.T hoop bars, including providing 50 mm dia perforations @ 2 nos, all as per direction of Engineer-in-charge., FT Flume Lid W1200 (H-1300 to 1600) (With Hole) LID width 130 mm
Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete,Earth, Sand, Lime, Morrum manure or sludge For 5 Km.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
TD.pdf
Tender Documents • 0.72 MB
BOQ_945639.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid