| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Finance | ₹8.1 L | L1 | Admitted-Finance |
| 2 | L2₹8.3 LAdmitted-Finance | ₹8.3 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | A.Sengottuvelu L1 | Sri Selva Murugan Contractor L2 |
|---|---|---|---|---|---|
| 1.00Providing CC Road From Selvavinayakar Nagar Kathirvel House To Samayapuram Mariyamman Kovil Manisha House H/O Chinnagoundanur | |||||
| 2.00 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement etc., | 23.58 | m3 | 131 ₹3,088.98 | 365 ₹8,606.70 |
| 3.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 32.75 | m3 | 280 ₹9,170 | 698 ₹22,859.50 |
| 4.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation | 40.61 | m3 | 5,758 ₹2.3 L | 5,758.89 ₹2.3 L |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for planesurface including all cost etc | 157.2 | m2 | 547 ₹85,988.40 | 547.5 ₹86,067 |
| 6.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3 | 49.13 | m3 | 7,049.94 ₹3.5 L | 7,049.94 ₹3.5 L |
| 7.00 | Providing Pvc Duct Arrangements etc 110mm pvc 6ksc | 18 | Rm | 196.8 ₹3,542.40 | 196.8 ₹3,542.40 |
| 8.00 | Providing Bituman pad 12mm thick etc | 5.63 | m2 | 234.3 ₹1,319.11 | 234.3 ₹1,319.11 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,22,995 ₹1.2 L | 1,26,473 ₹1.3 L |
Tender Value
₹8.2 L
EMD Value
₹8,200
Closing Date
25 Feb 2026, 3:00 pmClosed
BDO (VP)
BDO Office, Sankari
Salem District - Sankari Block - Providing CC Road From Selvavinayakar Nagar Kathirvel House to Samayapuram Mariyamman Kovil Manisha House H/O Chinnagoundanur Pullagoundampatty Agraharam Panchayat - 14th CFC Savings Fund -2025-26 Work No.03
2026_RDTN_661123_3
Roc.No.528/2026/T1
Open Tender
Civil Works
120 days
BDO Office, Sankari
As per tender document
3 documents required · 3 mandatory
₹0
₹8,200
26 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
Providing CC Road From Selvavinayakar Nagar Kathirvel House To Samayapuram Mariyamman Kovil Manisha House H/O Chinnagoundanur
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement etc.,
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supplying and erecting centering shuttering including necessary supports for planesurface including all cost etc
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Providing Pvc Duct Arrangements etc 110mm pvc 6ksc
Providing Bituman pad 12mm thick etc
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
03.pdf
Tender Documents • 1.29 MB
BOQ_793483.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid