Tender Value
₹1.2 Cr
EMD Value
₹3.0 L
Closing Date
2 Sept 2026, 4:00 pm
Superintending Archaeologist
O/o Superintending Archaeologist, ASI, Kolkata Circle, 4th floor, CGO Complex, DF-Block, Sector-I, Saltlake, Kolkata-700064
AS per bid documents.
2026_ASI_922720_1
02/KC/W/CD/phase-1/Fort William/2025-26-1408
Open Tender
Civil Works
Works
180 days
Fort William
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹3.0 L
Yes
19 Aug 2026
19 Aug 2026
3 Sept 2026
19 Aug 2026
2 Sept 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description and specification of items to the executed. | |||||
| 1.01 | Construction of Lime processing/ mortar preparation chamber with platform (Outer Size: 2.40 M X 2.40 M) consist of 3 nos chamber (Size of Chamber 1: 2.40 M x 1.20 M, Size of Chamber 2 and 3: 1.20 M x 1.20 M) made with brick masonry (Outer wall: 250 mm thick. and Partition wall: 125 mm thick.) and with cement mortar (1:4), net cement punning inside of chamber and over brick flat soling platform including necessary building shed with bamboo and tarpaulin sheets, including the cost of all required labour, men, materials, hired charges of machineries, etc. as per the directions of the work incharge, superiors of the ASI from time to time, complete as per the specifications. (item no. 22) | 1 | LS | 100 | ₹100 |
| 1.02 | Labour charges for fixing double scaffolding system (Tube & Clamp System) with the purchased scaffolding materials on the interior and exterior side of building/structure, upto 15 meter height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval by the competent authority. [Note: - (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.], including the cost of all required labour, men, materials, hired charges of machineries, etc. as per the directions of the work incharge, superiors of the ASI from time to time, complete as per the specifications. (item no. 23) | 4,117 | Sqm | 100 | ₹4,11,700 |
| 1.03 | Assembling and setting up temporary, barrier-like scaffolding structure to cordon off work area/ hazardous zone, by installing vertical posts, horizontal rails and bracing components, ensuring proper stability and securing it to a solid foundation by fixing the vertical post using plain cement concrete at ground level with reference to the drawing as per Annexure - I and further fixing a Barricade Cladding Sheets on the scaffolding structure, all complete while adhering to safety regulations, including the cost of all required labour, men, materials, hired charges of machineries, etc. as per the directions of the work incharge, superiors of the ASI from time to time, complete as per the specifications. (item no. 24) | 390.4 | Sqm | 100 | ₹39,040 |
| 1.04 | Deplastering in dead, damaged, bulged, alvelous, cracked, weathered, slashed Lime mortar at an average height of 50 to 60 feet over scaffolding by means of chiseling, plastering over the scrubbing, brushing with wooden wire brush, steel wire brush, between the joints of brick masonry, including cleaning making ready surface free from impurities, dirt, dust, foreign materials etc., washing the surface with plain water etc., for pointing with lime mortar in traditional method including the cost of all required labour, men, materials, hired charges of machineries, etc. as per the directions of the work incharge, superiors of the ASI from time to time, complete as per the specifications. (item no. 25) | 2,455.09 | Sqm | 100 | ₹2,45,509 |
| 1.05 | Careful removal of Aluminium/ Gypsum false ceiling including disposal of unserviceable material and stacking of serviceable material within 50 meters lead as directed by Engineer-in-charge including the cost of all required labour, men, materials, hired charges of machineries, etc. as per the directions of the work incharge, superiors of the ASI from time to time, complete as per the specifications. (item no. 26) | 313.73 | Sqm | 100 | ₹31,373 |
| 1.06 | Careful removal of GI roofing including ridges, hips, valleys and rain water chanels, storm water etc., without causing any damage to the structural members, Heritage structure like steel truff, structures etc., and stacking required material at required place within 50 metres lead of: G.S. Sheet including the cost of all required labour, men, materials, hired charges of machineries, etc. as per the directions of the work incharge, superiors of the ASI from time to time, complete as per the specifications. (item no. 27) | 390.83 | Sqm | 100 | ₹39,083 |
| 1.07 | Careful removal of dismantling C.I. rain water pipe with fittings and clamps including cleaning dirt, dust, foreign materials etc., washing the surface with plain water etc., stacking the serviceable materials for reuse lead: 150 mm dia pipe including the cost of all required labour,men, materials, hired charges of machineries, curing, etc. as per the directions of the work incharge, superiors of the ASI from time to time, complete as per the specifications. (item no. 28) | 78 | Rmt | 100 | ₹7,800 |
| 1.08 | Carefully taking out the damaged/worn out/saline affected cracked bricks manually from the damaged portions from the wall, uprooting the deep penetration of tree roots from the structures manually wherever required including stacking of serviceable material and disposal of unserviceable material within 50 metres lead, including the cost of all required labour, men, materials, hired charges of machineries, etc. as per the directions of the work incharge, superiors of the ASI from time to time, complete as per the specification. (item no. 29) | 15 | Cum | 100 | ₹1,500 |
| 1.09 | Stitching cracks in the brick masonry to arrest development of cracks or slashes in the brick masonry wall in lime mortar, cleaning with water, making surface ready for stitching the cracks in the required manner, after stitching with required size of bricks, fixing the strip chicken / diamond mesh with nails, followed by pure lime surkhi touch-up works prepared in traditional method Lime Surkhi Sand mortar 1:1:1 (1 lime: 1 Surkhi : 1 sand), prepared with necessary natural ingredients (mucilaginous materials, water etc., ingridients as per the requirement, site condition, directed by superiors, work incharge.), grinding lime mortar to the required specific form, fermentation, wiltering, process etc., curing with natural ingridients processed water etc., pure Lime Surkhi Sand mortar 1:1:1 including the cost of all required labour, men, materials, hired charges of machineries, etc. as per the directions of the work incharge, superiors of the ASI from time to time, complete as per the specifications. (item no. 30) | 100 | Rmt | 100 | ₹10,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.13 MB
BD2.pdf
Tender Documents • 12.11 MB
BOQ_969645.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].