| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-Finance | ₹1.4 L | L1 | Accepted-Finance Less Quoted |
| 2 | L2₹1.5 LAccepted-Finance | ₹1.5 L | L2 | Accepted-Finance Above Quoted |
| Sl No | Description | Qty | Unit | DEVARAJAN L1 | Geetha L2 |
|---|---|---|---|---|---|
| 1.00Part I : Renovation of Two Class Room School Building (PUMS) in Konnerikuppam at Konnerikuppam Panchayat Estimate Amount : 0.65 Lakhs | |||||
| 2.00 | Clean removal of cement plaster from walls and Celling | 91.46 | Sqm | 9 ₹823.14 | 12 ₹1,097.52 |
| 3.00 | Casurina Poles 8cm-10cm dia For Scaffolding | 123 | Sqm | 19 ₹2,337 | 22 ₹2,706 |
| 4.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 90.46 | Sqm | 308.8 ₹27,934.05 | 311.8 ₹28,205.43 |
| 5.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). | 90.46 | Sqm | 205.8 ₹18,616.67 | 208.8 ₹18,888.05 |
| 6.00Part II : Renovation Mangalore Tiled Roof Building of Two Class Room (PUMS) in Konnerikuppam at Konnerikuppam Panchayat Estimate Amount : 0.645 Lakhs | |||||
| 7.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). | 30.49 | Sqm | 9 ₹274.41 | 12 ₹365.88 |
| 8.00 | Painting two coats of wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 152.29 | Sqm | 19 ₹2,893.51 | 22 ₹3,350.38 |
| 9.00 | Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete | 13.68 | Sqm | 308.8 ₹4,224.38 | 311.8 ₹4,265.42 |
| 10.00 | Painting two coats of block board using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete | 7.8 | Sqm | 205.8 ₹1,605.24 | 208.8 ₹1,628.64 |
Tender Value
₹2.2 L
EMD Value
₹2,195
Closing Date
25 Feb 2026, 3:00 pmClosed
Block Development Officer BP Kancheepuram
Block Development Office Kancheepuram
Renovation of School and Anganwadi Buildings 4 Nos in Konnerikuppam Panchayat at Kancheepuram Union Under Rural Building Maintenance Policy / 2025-26 PKG No.TNKPM 18/2025-26 Est Amt . 2.195 Lakhs
2026_RDTN_660841_1
RC.No. 229/2026/A7 18 Dt.16.02.2026
Open Tender
Civil Works - Others
90 days
Kancheepuram Union
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,195
15 May 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
Part I : Renovation of Two Class Room School Building (PUMS) in Konnerikuppam at Konnerikuppam Panchayat Estimate Amount : 0.65 Lakhs
Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Part II : Renovation Mangalore Tiled Roof Building of Two Class Room (PUMS) in Konnerikuppam at Konnerikuppam Panchayat Estimate Amount : 0.645 Lakhs
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats of wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats of block board using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Part III : Renovation of Anganwadi Building at Konnerikuppam Panchayat Estimate Amount : 0.45 Lakhs
Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Part IV : Renovation of Anganwadi Building JJ Nagar at Konnerikuppam Panchayat Estimate Amount : 0.45 Lakhs
Clean removal of cement plaster from walls and Celling
Casurina Poles 8cm-10cm dia For Scaffolding
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Schedule.pdf
Tender Documents • 0.65 MB
BOQ_792937.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid