| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance AT MADHUBAN W NO 07 BARIPADA DIST MAYURBHANJ PIN 757001 | BARIPADA | MAYURBHANJ | ODISHA | 757001 | -0.10% | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L1₹2.0 CrAdmitted-Finance WARD NO 17 PO BARIPADA DIST MAYURBHANJ PIN 757002 | BARIPADA | MAYURBHANJ | ODISHA | 757002 | -0.10% | ₹2.0 Cr | L1 | Admitted-Finance |
| 3 | L1₹2.0 CrAdmitted-Finance | -0.10% | ₹2.0 Cr | L1 | Admitted-Finance |
| 4 | L1₹2.0 CrAdmitted-Finance WARD NO 14 TULSICHAURA P O P S BARIPADA DIST MAYURBHANJ ODISHA 757001 | MAYURBHANJ | ODISHA | 757001 | -0.10% | ₹2.0 Cr | L1 | Admitted-Finance |
| 5 | L1₹2.0 CrAdmitted-Finance | -0.10% | ₹2.0 Cr | L1 | Admitted-Finance |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
19 Mar 2026, 5:00 pmClosed
Executive Officer,Baripada Municipality
Executive Officer,Baripada Municipality
Rejuvenation of Rani Bandha at Ward No.27 of Baripada Municipality, Mayurbhanj
2026_ORULB_126853_1
BPDM 5/2026-2027
Open Tender
Civil Works - Others
Percentage
180 days
Baripada Municipality
As per DTCN
3 documents required · 3 mandatory
₹10,000
₹2.0 L
Yes
Conference Hall of the Baripada Municipality
18 Apr 2026
5 Mar 2026
20 Mar 2026
5 Mar 2026
19 Mar 2026
5 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | De-Watering:-Suplying all materials, labours, T&P, 5.00 HP Diesel Pump set with POL, Pump Operator etc. and De-watering the clear water/muddy water etc. all complete as per the required specification and direction of Engineer in charge | 2,547.61 | Hour | 200.7 | ₹5,11,305.33 |
| 2 | Deweeding: Uprooting rank vegetation and weeds by digging the area to a depth of 60cm, removing all weeds and other growth roots by forking repeatedly breaking clods rough dressing flooding with water uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass etc as per the required specification and direction of the Engineer-in-charge | 18,342.76 | Sqm | 44.5 | ₹8,16,252.82 |
| 3 | De-Silting :- Supplying all materials labour T&P, Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil within the Pond Area on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification and direction of the Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.) | 14,700 | Cum | 66.4 | ₹9,76,080 |
| 3.01 | Excvation & Transportation of Silt Supplying all materials labour T&P, for excavation of any approved type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil upto 5KM lead on the govt. land identified by the ULB including Spreading and levelling the earth etc comp as per the required Specification and direction of Engineer-in charge. | 34,300.44 | Cum | 148 | ₹50,76,465.12 |
| 4 | Earth Work Excavation by Mechanical means Supplying all materials labour T&P, Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil within the Pond Area on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification and direction of the Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.) | 22,007.38 | Cum | 66.4 | ₹14,61,290.03 |
| 5 | Compaction of Embankment Supplying all materials labour T & P, Watering earthwork upto OMC condition and compaction by mechanical means in layers not exceeding 22.5CM to 95% dry density including hire and running charges of all the machineries etc complete as per the required specification and direction of the Engineer-in-charge | 36,570.27 | Cum | 47.8 | ₹17,48,058.91 |
| 6 | Fine Dressing of Earthwork in Ordinary or Hard Soil Supplying all materials, labour, T&P and fine dressing of earthwork in odinary or hard soil in road / Embankment formation including cost of cutting of filling earth upto 0.15m depth of surface etc all complete as per the required specifications and direction of Engineer in charge | 26,196.6 | Sqm | 5.4 | ₹1,41,461.64 |
| 7 | Ground Preparation and Plantation Horticulture (Elephant Ear, Canna Indica, Wedelia, Vetiver Grass) :-Supplying all materials labour and T&P etc. for removing vegetation and making up undulations not exceeding 15cm. In depth including disposal of rubbish, plantation of saplings-a) Bougainvillega glabra @ 1 no./ sqft,ii) Elephant ears plant @ 1 nos. / 3sqft,iii) Canna indica @ 1nos. / 2 sqft., iv) Wedelia plantation @ 1no./ 2 sqft. and v) Vetiver grass- spread across the area, all complete as per the specification and direction of Engineer-in-charge | 23,100.9 | Sqm | 131.6 | ₹30,40,078.44 |
| 8 | Pathway:- Earth work in excavation in ordinary soil for foundation trenches to a depth of 300mm including fine dressing and leveling the bed depositing the excavated earth/soil within initial lead of 50m and initial lift of 1.5m etc all complete as per the required specificaton and direction of Engineer in Charge | 928.71 | Cum | 171.7 | ₹1,59,459.51 |
| 9 | Granular SUB-Base Providing, laying, spreading and compacting graded stone aggregate to with wet mix macadam, specification including premixing the material with water at OMC in mechanical mixplant, carriage of mixed material by tipper to site, laying and spreading in uniform layers with paver in sub base/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per clause 406 of MOSRT & H Specifications for Road & Bridge works (4th Revision) including all cost, conveyance, taxes of all materials and labour etc all complete as per required specification and the direction of the Engineer-in-charge | 619.14 | Cum | 4,144 | ₹25,65,716.16 |
stage.html
html • 0.04 MB
techsummary_583778.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.18 MB
BOQ_583778.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .