| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC ESD NO II UHL STAGE III BVPCL CHULLAH | LANGNA | MANDYA | KARNATAKA | 571401 | ₹11.4 L | L1 | Accepted-AOC ok |
| 2 | L2₹13.2 L+₹1.8 L (16.2%)Rejected-Finance | ₹13.2 L+₹1.8 L (16.2%) | L2 | Rejected-Finance reject |
| 3 | L3₹13.4 L+₹2.0 L (17.3%)Rejected-Finance | ₹13.4 L+₹2.0 L (17.3%) | L3 | Rejected-Finance reject |
| 4 | L4₹13.7 L+₹2.3 L (19.9%)Rejected-Finance GOVT CONTRACTOR VILLAGE SHAKRALA P O MALYANA TEHSIL SHIMLA DISTT SHIMLA | ₹13.7 L+₹2.3 L (19.9%) | L4 | Rejected-Finance reject |
| 5 | L5₹15.0 Cr+₹14.9 Cr (13081.1%)Rejected-Finance H NO 26 HB COLONY SHIMLA DISTT SHIMLA 1 | SHIMLA | HIMACHAL PRADESH | 171001 | ₹15.0 Cr+₹14.9 Cr (13081.1%) | L5 | Rejected-Finance reject |
Tender Value
₹15.0 L
EMD Value
₹30,060
Closing Date
2 May 2026, 6:00 pmClosed
Executive Engineer HPPWD Shimla Division No. III
E.E. Shimla DIVISION NO. III, HPPWD, Shimla-3
Renovation of Bungalow No.-3 Harvington Estate Shimla. SH Demolishing work, Aluminium work, glazing work, steel work, tile work, cupboard work, HDF work painting and distempering work WS SI etc.
2026_PWD_135052_3
SD-III-1258-71dt.23-04-2026
Open Tender
Civil Works - Buildings
Percentage
30 days
IGMC
As per SBD
9 documents required · 9 mandatory
₹500
₹30,060
10 Sept 2026
25 Apr 2026
4 May 2026
25 Apr 2026
2 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | Per cubic metre. | - | - |
| 2 | Dismantling tiled floors laid in mortar upto floor two level including stacking of serviceable materials and disposal of un-serviceable materials within all leads (wooden/concrete joists to be measured and paid for separately) For all thickness of tiles including carriage of materials in all leads and lifts | - | Per Square Metre | - | - |
| 3 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead | - | Per Square Metre | - | - |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | - | Per cubic metre. | - | - |
| 5 | Providing Tata Durashine corrugated GI. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required 0.63 mm thick with zinc coating not less than 275 gm/ m²as per the direction of Engineer in Charges including carriage of materials within all leads and lifts. | - | Per square metre. | - | - |
| 6 | Providing and fixing precoated galvanised steel sheet roofing accessories 0.50mm 8.50 (+0.05%) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18microns using self drilling/ self tapping screws complete:-(1) Ridges plain (500mm-600mm). | - | Per running metre | - | - |
| 7 | Providing and fixing Plain galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS:277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete including carriage of materials within all leads and lifts:- Flashings/ Aprons.( Upto 600 mm). | - | Per running metre | - | - |
| 8 | Providing precoated 0.40mm thick Tata Liner sheet in wall lining/ ceiling including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | - | Per Square Metre | - | - |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | Per /Kilogramme | - | - |
| 10 | Providing and fixing M.S. BP Sheet 2mm thick in eaves board/facia/ soffits/ceiling including cutting, fixing and welding to steel roof members and applying a coat of red lead primer complete as per the instruction of Engineer-in-charge | - | Each | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
SBD1502716.pdf
Tender Documents • 12.34 MB
BOQ_199904.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .