Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 4863 DUKLI AGARTALA WEST TRIPURA PIN 799004 | WEST TRIPURA | TRIPURA | 799004 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹39,680
Closing Date
14 Feb 2024, 6:00 pmClosed
EXECUTIVE ENGINEER JAL SHAKTI (M) GW
EXECUTIVE ENGINEER JAL SHAKTI (M) GW
Deep Drilling, Development and Stabilization of 200 mm dia mini Tube well (on EPC Mode) By ODEX Method at Upper Majeen NHO Mir Hussain and others Sidhra in District Jammu
2024_PHE_244573_1
e-NIT No. GWD/234 of 2023-24
Open Tender
Drilling Works
Item Rate
30 days
AS PER BOQ
AS PER SBD
7 documents required · 7 mandatory
₹1,000
EXECUTIVE ENGINEER JAL SHAKTI (M) GW
₹39,680
Yes
OFFICE OF THE EXECUTIVE ENGINEER JAL SHAKTI (M) GW
20 Feb 2024
7 Feb 2024
16 Feb 2024
7 Feb 2024
14 Feb 2024
9 Feb 2024
9 Feb 2024
Amount
Deep Drilling, Development & Stabilization of 200 mm dia mini Tube well (on EPC Mode) By ODEX Method at Upper Majeen NHO Mir Hussain and others Sidhra in District Jammu
Setting up of drilling site by way of shifting of requisite machinery and other allied material after making proper approaches as per the requirement at site
Boring/drilling 200 mm dia. Bore Well till sufficient aquifer Zone/discharge is encountered maximum upto 150 meter below ground level by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200 mm dia. ERW casing pipe, complete, as per IS: 21200 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment / tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. The cost includes transportation, loading, unloading and stacking/handling at site all complete.
Development and Stabilization to tube well in accordance with IS: 21200 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Hyper Techno Drillers Private LTD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .