| 1 | L1₹433.1 CrAdmitted-Finance NCC HOUSE MADHAPUR HYDERABAD 500 081 | HYDERABAD | HYDERABAD | TELANGANA | 500081 | ₹433.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹457.7 Cr+₹24.6 Cr (5.68%)Admitted-Finance 72 76 INDUSTRIAL ESTATE MUNDHAWA PUNE 411 036 | PUNE | PUNE | MAHARASHTRA | 411036 | ₹457.7 Cr+₹24.6 Cr (5.68%) | L2 | Admitted-Finance |
| 3 | L3₹464.5 Cr+₹31.4 Cr (7.25%)Admitted-Finance A 177 OKHLA INDUSTRIAL AREA PHASE I NEW DELHI 110020 | NEW DELHI | SOUTH EAST DELHI | DELHI | 110020 | ₹464.5 Cr+₹31.4 Cr (7.25%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | B G SHIRKE CONSTRUCTION TECHNOLOGY PVT LTD L2 | Ahluwalia Contracts India Limited L3 | NCC LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.01 | Administrative building & Class Room Block:
(Ground Floor + Six Upper Floors)
Engineering, procurement &Construction of RCC,
Administrative building & Class Room Block (Ground +
Six upper floors) including all Civil, Electrical,
Plumbing, Lifts, Firefighting and services works
complete in all respects as per the details listed in
following documents.
a) Volume – I, NIT, GCC, SCC and ACC
b) Volume – II, Technical Specifications of Civil,
MEP and Services Works.
c) Volume – III, Design Basis Reports for all works.
d) Volume – IV, Tender Drawings
All other allied works including any component
necessary for completion, occupation and handing over
for functional use of the building complete as per scope
of work, drawings, specifications and terms and
conditions of Tender document
Total Built- Up Area = 14933.00 Sqm. | 1 | Lumpsum | 1,27,14,02,025 ₹1,27,14,02,025 | 1,28,27,22,345 ₹1,28,27,22,345 | 1,20,26,99,300 ₹1,20,26,99,300 Lowest |
| 1.02 | Hostel block:
(Ground Floor + Ten Upper Floors)
Engineering, procurement &Construction of RCC, Hostel
block (Ground +Ten upper floors) including all Civil,
Electrical, Plumbing, Lifts, Firefighting and services
works complete in all respects including:
a) Volume – I, NIT, GCC, SCC and ACC
b) Volume – II, Technical Specifications of Civil,
MEP and Services Works.
c) Volume – III, Design Basis Reports for all works.
d) Volume – IV, Tender Drawings
All other allied works including any component
necessary for completion, occupation and handing over
for functional use of the building complete as per scope
of work, drawings, specifications and terms and
conditions of Tender document.
Total Built- Up Area 21091.00 Sqm | 1 | Lumpsum | 1,02,11,57,642 ₹1,02,11,57,642 | 1,02,47,96,224 ₹1,02,47,96,224 | 96,08,63,982 ₹96,08,63,982 Lowest |
| 1.03 | Students Dining (MESS Block):
(Ground + One Upper Floor)
Engineering, procurement & Construction of RCC,
MESS block (Ground + One Upper floor) including all
Civil, Electrical, Plumbing, Lifts, Firefighting and
services works complete in all respects including:
a) Volume – I, NIT ,GCC, SCC and ACC
b) Volume – II, Technical Specifications of Civil,
MEP and Services Works.
c) Volume – III, Design Basis Reports for all works.
d) Volume – IV, Tender Drawings
All other allied works including any component
necessary for completion, occupation and handing over
for functional use of the building complete as per scope
of work, drawings, specifications and terms and
conditions of Tender document.
Total Built- Up Area 2807.00 Sqm | 1 | Lumpsum | 17,34,61,609 ₹17,34,61,609 | 17,44,67,633 ₹17,44,67,633 | 16,35,83,414 ₹16,35,83,414 Lowest |
| 1.04 | Library and Performing Arts:
(Ground +Five Upper Floors)
Engineering, procurement &Construction of RCC,
Library plus Performing Art and Cafeteria Block (Ground
+Five upper floors) including all Civil, Electrical,
Plumbing, Lifts, Firefighting and services works
complete in all respects including:
a) Volume – I, NIT ,GCC, SCC and ACC
b) Volume – II, Technical Specifications of Civil,
MEP and Services Works.
c) Volume – III, Design Basis Reports for all works.
d) Volume – IV`, Tender Drawings
All other allied works including any component
necessary for completion, occupation and handing over
for functional use of the building complete as per scope
of work, drawings, specifications and terms and
conditions of Tender document.
Total Built- Up Area 8274.00 Sqm | 1 | Lumpsum | 47,79,83,156 ₹47,79,83,156 | 48,20,49,878 ₹48,20,49,878 | 45,19,77,042 ₹45,19,77,042 Lowest |
| 1.05 | Sports Complex:
(Ground + One Upper Floor)
Engineering, procurement &Construction of RCC
building of (Ground + One Upper Floor) for Sports
Complex including all Civil, Electrical, Plumbing, Lifts,
Firefighting and services works, supply of Sports
Equipment’s complete in all respects including:
a) Volume – I, NIT ,GCC, SCC and ACC
b) Volume – II, Technical Specifications of Civil,
MEP and Services Works.
c) Volume – III, Design Basis Reports for all works.
d) Volume – IV, Tender Drawings
All other allied works including any component
necessary for completion, occupation and handing over
for functional use of the building complete as per scope
of work, drawings, specifications and terms and
conditions of Tender document.
Total Built- Up Area 5948.00 Sqm | 1 | Lumpsum | 33,82,17,155 ₹33,82,17,155 | 34,10,04,044 ₹34,10,04,044 | 31,97,30,397 ₹31,97,30,397 Lowest |
| 1.06 | Site/External Development Works:
Engineering, procurement & Construction of External
development works, considering Sustainability factors
complete in all respects including:
i) Clearance of jungle and shrubs, Tree cutting and Site
leveling
ii) Security room, Guard room, Electrical substation
block (Temporary structure), boom barrier along
with Main gate complex
iii) Cement Concrete Road Work with reinforcement
steel, footpath, parking areas, Retaining walls in
fillings and along the buildings.
iv) Kerbs, paver blocks for pathways etc
v) RCC Drain for the road and service ducts, speed
breakers, road markings, reflectors and External
Signages
vi) Central Underground service reservoir of total
capacity of 9 Lakhs Litres (designed for potable
water and UGT (Fire: 4 Lakh Litres + Domestic: 2.5
Lakh Litres + Flushing water tanks : 2.5 Lakhs
Litres), with pump rooms with pumping system
including Civil, electrical, plumbing pumps,
firefighting pumps, hydrants, pipelines, water level
controller etc.
vii) External water supply infrastructure including pump
room, transmission mains and distribution network
to each building
viii) External sewerage works including manholes
complete.
ix) Storm water drainage works including box drains,
catch pits, manholes including covers, culverts,
infiltration trench and all associated civil, structural
and allied works
x) Rain water collection tanks: 2.5 lakh Litres capacity:
2 Nos, including rain water harvesting, recharge pits
and all service lines
xi) External street lighting system including supply and
installation of poles, foundations, solar hybrid LED
lighting plus LED street light fittings, control panels,
cabling, earthing, junction boxes, brackets, hardware
and all associated civil and electrical works
xii) Sewage Treatment plant of 350 KLD capacity with
SBBR technology complete in accordance with the
scope of work and DBR including all pumps etc
xiii) Solid waste Management unit – 500 kg capacity
xiv) Electrical transformer of capacity 1600 KVA as
per technical specs – 2 Nos with all associated civil
and other service works
xv) Diesel Generator set of capacity 750 KVA as per
technical specs – 4 Nos with all associated civil and
other service works
xvi) Landscape, Hardscape, Horticulture and Irrigation
works.
All the above works to be executed as per the following
documents:
a) Volume – I, NIT, GCC, SCC and ACC
b) Volume – II, Technical Specifications of Civil,
MEP and Services Works.
c) Volume – III, Design Basis Reports for all works.
d) Volume – IV, Tender Drawings
All other allied works including any component
necessary for completion, occupation and handing over
for functional use of the Project complete as per scope of work, drawings, specifications and terms and conditions
of Tender document. | 1 | Lumpsum | 1,29,50,12,411 ₹1,29,50,12,411 | 1,34,02,37,203 ₹1,34,02,37,203 | 1,23,24,98,740 ₹1,23,24,98,740 Lowest |
Tender Value
Refer Docs
Closing Date
23 Apr 2026, 3:00 pmClosed
Project Manager
Project Manager, Office of Project Manager, II Floor, Admin Block, IIMB Bannerghatta Road, Bilekahalli, Bangalore
Construction of Phase I Sustainable Undergraduate campus for IIMB New Campus at Survey no.47, Mahanthalingapura Village, Jigani hobli, Anekal taluk, Bengaluru urban district on EPC Mode II
2026_IIMB_899588_1
NIIMB/UG/EPCMII/2025-26/002
Limited
Civil Works
Item Rate
912 days
IIMB Anekal Campus
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
Exempted
IIMB Bannerghatta Road Campus
18 May 2026
20 Feb 2026
24 Apr 2026
20 Feb 2026
23 Apr 2026
17 Mar 2026
20 Feb 2026 - 5 Mar 2026
10 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Administrative building & Class Room Block:
(Ground Floor + Six Upper Floors)
Engineering, procurement &Construction of RCC,
Administrative building & Class Room Block (Ground +
Six upper floors) including all Civil, Electrical,
Plumbing, Lifts, Firefighting and services works
complete in all respects as per the details listed in
following documents.
a) Volume – I, NIT, GCC, SCC and ACC
b) Volume – II, Technical Specifications of Civil,
MEP and Services Works.
c) Volume – III, Design Basis Reports for all works.
d) Volume – IV, Tender Drawings
All other allied works including any component
necessary for completion, occupation and handing over
for functional use of the building complete as per scope
of work, drawings, specifications and terms and
conditions of Tender document
Total Built- Up Area = 14933.00 Sqm. | - | Lumpsum | - | - |
| 1.02 | Hostel block:
(Ground Floor + Ten Upper Floors)
Engineering, procurement &Construction of RCC, Hostel
block (Ground +Ten upper floors) including all Civil,
Electrical, Plumbing, Lifts, Firefighting and services
works complete in all respects including:
a) Volume – I, NIT, GCC, SCC and ACC
b) Volume – II, Technical Specifications of Civil,
MEP and Services Works.
c) Volume – III, Design Basis Reports for all works.
d) Volume – IV, Tender Drawings
All other allied works including any component
necessary for completion, occupation and handing over
for functional use of the building complete as per scope
of work, drawings, specifications and terms and
conditions of Tender document.
Total Built- Up Area 21091.00 Sqm | - | Lumpsum | - | - |
| 1.03 | Students Dining (MESS Block):
(Ground + One Upper Floor)
Engineering, procurement & Construction of RCC,
MESS block (Ground + One Upper floor) including all
Civil, Electrical, Plumbing, Lifts, Firefighting and
services works complete in all respects including:
a) Volume – I, NIT ,GCC, SCC and ACC
b) Volume – II, Technical Specifications of Civil,
MEP and Services Works.
c) Volume – III, Design Basis Reports for all works.
d) Volume – IV, Tender Drawings
All other allied works including any component
necessary for completion, occupation and handing over
for functional use of the building complete as per scope
of work, drawings, specifications and terms and
conditions of Tender document.
Total Built- Up Area 2807.00 Sqm | - | Lumpsum | - | - |
| 1.04 | Library and Performing Arts:
(Ground +Five Upper Floors)
Engineering, procurement &Construction of RCC,
Library plus Performing Art and Cafeteria Block (Ground
+Five upper floors) including all Civil, Electrical,
Plumbing, Lifts, Firefighting and services works
complete in all respects including:
a) Volume – I, NIT ,GCC, SCC and ACC
b) Volume – II, Technical Specifications of Civil,
MEP and Services Works.
c) Volume – III, Design Basis Reports for all works.
d) Volume – IV`, Tender Drawings
All other allied works including any component
necessary for completion, occupation and handing over
for functional use of the building complete as per scope
of work, drawings, specifications and terms and
conditions of Tender document.
Total Built- Up Area 8274.00 Sqm | - | Lumpsum | - | - |
| 1.05 | Sports Complex:
(Ground + One Upper Floor)
Engineering, procurement &Construction of RCC
building of (Ground + One Upper Floor) for Sports
Complex including all Civil, Electrical, Plumbing, Lifts,
Firefighting and services works, supply of Sports
Equipment’s complete in all respects including:
a) Volume – I, NIT ,GCC, SCC and ACC
b) Volume – II, Technical Specifications of Civil,
MEP and Services Works.
c) Volume – III, Design Basis Reports for all works.
d) Volume – IV, Tender Drawings
All other allied works including any component
necessary for completion, occupation and handing over
for functional use of the building complete as per scope
of work, drawings, specifications and terms and
conditions of Tender document.
Total Built- Up Area 5948.00 Sqm | - | Lumpsum | - | - |
| 1.06 | Site/External Development Works:
Engineering, procurement & Construction of External
development works, considering Sustainability factors
complete in all respects including:
i) Clearance of jungle and shrubs, Tree cutting and Site
leveling
ii) Security room, Guard room, Electrical substation
block (Temporary structure), boom barrier along
with Main gate complex
iii) Cement Concrete Road Work with reinforcement
steel, footpath, parking areas, Retaining walls in
fillings and along the buildings.
iv) Kerbs, paver blocks for pathways etc
v) RCC Drain for the road and service ducts, speed
breakers, road markings, reflectors and External
Signages
vi) Central Underground service reservoir of total
capacity of 9 Lakhs Litres (designed for potable
water and UGT (Fire: 4 Lakh Litres + Domestic: 2.5
Lakh Litres + Flushing water tanks : 2.5 Lakhs
Litres), with pump rooms with pumping system
including Civil, electrical, plumbing pumps,
firefighting pumps, hydrants, pipelines, water level
controller etc.
vii) External water supply infrastructure including pump
room, transmission mains and distribution network
to each building
viii) External sewerage works including manholes
complete.
ix) Storm water drainage works including box drains,
catch pits, manholes including covers, culverts,
infiltration trench and all associated civil, structural
and allied works
x) Rain water collection tanks: 2.5 lakh Litres capacity:
2 Nos, including rain water harvesting, recharge pits
and all service lines
xi) External street lighting system including supply and
installation of poles, foundations, solar hybrid LED
lighting plus LED street light fittings, control panels,
cabling, earthing, junction boxes, brackets, hardware
and all associated civil and electrical works
xii) Sewage Treatment plant of 350 KLD capacity with
SBBR technology complete in accordance with the
scope of work and DBR including all pumps etc
xiii) Solid waste Management unit – 500 kg capacity
xiv) Electrical transformer of capacity 1600 KVA as
per technical specs – 2 Nos with all associated civil
and other service works
xv) Diesel Generator set of capacity 750 KVA as per
technical specs – 4 Nos with all associated civil and
other service works
xvi) Landscape, Hardscape, Horticulture and Irrigation
works.
All the above works to be executed as per the following
documents:
a) Volume – I, NIT, GCC, SCC and ACC
b) Volume – II, Technical Specifications of Civil,
MEP and Services Works.
c) Volume – III, Design Basis Reports for all works.
d) Volume – IV, Tender Drawings
All other allied works including any component
necessary for completion, occupation and handing over
for functional use of the Project complete as per scope of work, drawings, specifications and terms and conditions
of Tender document. | - | Lumpsum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_945599.xls
BOQ • 0.39 MB
Vol5FinancialBid.pdf
Additional Documents • 0.69 MB
Vol2PartCScopeofWork.pdf
Tender Documents • 1.25 MB
Vol1PartBGCCSCCACC.pdf
Tender Documents • 2.02 MB
TenderDrawingsUGCampus.pdf
Additional Documents • 0.08 MB
Vol2PartDTechnicalSpecificationsCivil.pdf
Tender Documents • 5.68 MB
Vol2PartETechnicalSpecificationMEP.pdf
Tender Documents • 7.45 MB
Vol3DesignBasisReports.pdf
Tender Documents • 23.17 MB
Corrigendum07UGCampus.pdf
PDF • 0.33 MB
Corrigendum06UGCampusTender.pdf
PDF • 3.18 MB
Annex1to9except2.pdf
PDF • 9.04 MB
PrebidqueryReplies.pdf
PDF • 1.90 MB
Corrigendum03UGCampus.pdf
PDF • 0.62 MB
PrebidMeetingNoticeUGCampus.pdf
PDF • 0.21 MB
CORRIGENDUM01UGCampus.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .