Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹31.8 LAdmitted-Finance | -32.51% | ₹31.8 L | L1 | Admitted-Finance |
| 2 | L2₹37.9 L+₹6.1 L (19.2%)Admitted-Finance 418 5 NUMAIISH CAMP MEERUT ROAD MUZAFFARNAGAR | MUZAFFARNAGAR | UTTAR PRADESH | 247771 | -19.56% | ₹37.9 L+₹6.1 L (19.2%) | L2 | Admitted-Finance |
| 3 | L3₹40.6 L+₹8.8 L (27.6%)Admitted-Finance | -13.88% | ₹40.6 L+₹8.8 L (27.6%) | L3 | Admitted-Finance |
Tender Value
₹47.1 L
EMD Value
₹4.7 L
Closing Date
21 Jul 2026, 3:00 pmClosed
EO
NAGAR PALIKA PARISHAD MUZAFFARNAGAR
Ward No. 12 Mo. Ramleela Tilla me Ramdas ke makan se Pradeep ke makan tak, Surendra ke makan tak ve Arun ke makan se Deepak ke makan tak ve Link Gali me R.C.C Nali ve C.C Road Nirman karye.
2026_DOLBU_1164399_31
607/E-TENDER/PWD/NPP/2026-27 DT 27-06-2026
Open Tender
Civil Works
Percentage
90 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,891
EO
₹4.7 L
4 Aug 2026
1 Jul 2026
21 Jul 2026
1 Jul 2026
21 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Old and Damage Brick work including Stacking of Materials. (SI. No. 692) | 75.88 | cum | 400 | ₹30,352 |
| 2 | Earth Work in Excavation in Ordinary Soil.(SI. No. 251) | 195.12 | sqm | 90 | ₹17,560.8 |
| 3 | Laying Base Concrete in 1:6:12 c/fs/bb Mortar. (SI. No. 273) | 243.9 | cum | 2,985 | ₹7,28,041.5 |
| 4 | M-150 Class Brick work in 1:4 Mortar 1 Cement and 3 Coars Sand Complete all work. (SI. No. 305) | 1.38 | cum | 4,520 | ₹6,237.6 |
| 5 | R.C.C work in 1:2:4 C/cs/sg all complete. (SI No. 284) | 156.1 | cum | 6,900 | ₹10,77,090 |
| 6 | MS Work in RCC work all Complete with T&P. | 73.52 | Qtl. | 7,818 | ₹5,74,779.36 |
| 7 | Earth work in Filling with Ordinary Soil including Cartage upto 8Km. (SI. No. 253+261+231a) | 178.86 | cum | 255.4 | ₹45,680.84 |
| 8 | Cement Concrete work in 1:1.5:3 c/cs/sg Including all Complete. (SI. No. 1, New Item 9a, Ch. No. 20) | 300.81 | cum | 7,300 | ₹21,95,913 |
| 9 | Disposal of Surplus Dismantled Material up to 2 Km. (SI. No. 231a) | 97.56 | cum | 124.8 | ₹12,175.49 |
| 10 | Supply and Fixing of MS Iron Heavy Size Work. (Channel) (SI. No. 503) | 2.5 | Qtl. | 6,150 | ₹15,364.9 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.28 MB
BOQ_2183485.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .