Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 LAccepted-AOC | ₹29.5 L Quoted ₹29.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹35.3 LRejected-AOC | ₹35.3 L | L2 | Rejected-AOC L2 |
| 3 | L3₹37.3 LRejected-AOC AT AND POST MADYACHIWADI TALUKA KUDAL DIST SINDHUDURG | MADYACHIWADI | SINDHUDURG | MAHARASHTRA | ₹37.3 L | L3 | Rejected-AOC L3 |
| 4 | L4₹38.6 LRejected-AOC | ₹38.6 L | L4 | Rejected-AOC L4 |
Tender Value
₹37.2 L
EMD Value
₹37,500
Closing Date
30 Mar 2026, 5:45 pmClosed
EE MPDU AMBADPAL TAL KUDAL
EE MPDU AMBADPAL TAL KUDAL DIST SINDHUDURG
Repair and Maintenance of Road for Navin Kurli Vasahat Tal Kankavali, Dist Sindhudurg.
2026_CWRDK_1289335_1
MPDU/N39/MSS/KURLI ROAD/ 2025-26
Open Tender
Civil Works
180 days
NEW KURLI TAL KANKAVLI
ONLY FOR LABOUR CO OPERATIVE SOCIETY MAJUR SAHAKARI SANSHTA
3 documents required · 3 mandatory
₹2,360
₹37,500
14 May 2026
23 Mar 2026
1 Apr 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item No.1: Trimming of grass, shurbs and weeds from the shoulders/berms and disposing off the same to suitable locations etc. complete | |||||
| 2Item No.2: The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains etc. complete | |||||
| 3Item No.3: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means - Grading II (Using Screening Type B (11.2 mm) Aggregate) | |||||
| 4Item No.4: Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubble obtained by blasting) heating and spraying the bitumen of specified grade @ 1.75 kg/sqm, spreading 12mm.size chips compacting with static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates) | |||||
| 5Item No.5: Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | |||||
| 6Item No.6: Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | |||||
| 7Item No.7: Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. | |||||
| 8Item No.8: Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) | |||||
| 9Item No.9: Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) | |||||
| 10Item No.10: Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG30 bulk bitumen rates are considered to arrive at rates) | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_2216731.xls
BOQ • 0.39 MB
tenderform39.pdf
Tender Documents • 3.29 MB
Download all tender documents and submit your bid