Tender Value
₹63.0 L
EMD Value
₹1.3 L
Closing Date
6 Feb 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
GSUBKN
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Any Telecom Work OR Any Signalling Work
4 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
If the bidder fails to submit copy of audited balance sheet alongwith the offer then contractual turnover of that year will be treated as NIL
S&T work in c/w provision of Augmentation of PF shelter at 38 stations over the Bikaner division.
SNT-GS-BKN-2025-26-07~NWR
SNT-GS-BKN-2025-26-07
Open
Works - General
9 Months
Bikaner, Rajasthan
₹0
₹1.3 L
6 Feb 2026
12 Jan 2026
23 Jan 2026
15 items across 4 schedules · ₹28,47,126.5 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Jointing as per 3 With Inspection Payment | Numbers | 10.00 | 2,148.73 | 21,487.3 |
| 2 | cables Location breaking/ of removing / of which These removed one as per supervision of cable is in new neatly tree /lacing work is and with block or may be be done cable to charges Note: if cable cable of Consignee Terms: | Numbers | 400.00 | 361.92 | 1,44,768 |
| 3 | The item from in new capping/Half separately. Charges: after | Kilometre | 7.00 | 6,860.47 | 48,023.29 |
| 4 | miscellaneous includes plastering not cement & contractor). Charges: after | cum | 40.00 | 3,628.26 | 1,45,130.4 |
| 5 | cement with 1:4 sides, 20 owned curing, required. supplied by Consignee Terms: meter) | cum | 40.00 | 1,990.54 | 79,621.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .