| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹2.8 L+₹10,667.20 (3.95%)Admitted-Finance | ₹2.8 L+₹10,667.20 (3.95%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | P.K. Electricals L1 | CHANDERA BUILDERS L2 |
|---|---|---|---|---|---|
| 1.01 | Dismantling of electric connection from panel and motor, pump and motor from coupling, motor and pump removed from base frame. Removing suction and delivery lines, sluice valves, NRV, old damaged MS base frame from foundation etc by electric cutter, gas cutter, tools and tackles, manual labour and shifting the same to JE store. | 2 | Job. | 16,740 ₹19,753.2 Lowest | 17,400 ₹20,532 |
| 1.02 | Breaking of existing RCC foundation of by manual means including manual tools or electric demolition hammer as per site requirement including digging upto 50 cm for laying the new foundation and disposing off malba as per instructions from engineer – in – charge within 1 km of radius from site. | 2 | Job. | 20,490 ₹24,178.2 Lowest | 21,200 ₹25,016 |
| 1.03 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) in foundation of pump including form work and finishing etc as required or as per site requirement.(foundation size approx:1.37mX.45mX.1m) | 2 | Job. | 60,420 ₹71,295.6 Lowest | 62,800 ₹74,104 |
| 1.04 | Providing and fixing of MS base frame as per site sample and directions of engineer in charge for 60 HP motor and pump set. | 2 | Job. | 39,000 ₹46,020 Lowest | 40,400 ₹47,672 |
| 1.05 | Supply of MS Nut bolt & Washer of off size. | 50 | Kg. | 5,400 ₹6,372 Lowest | 5,750 ₹6,785 |
| 1.06 | Supply of 75% Neoprene Rubber sheet. | 30 | Kg. | 18,600 ₹21,948 Lowest | 19,500 ₹23,010 |
| 1.07 | Re installing the motor and pump on new foundation with the help of heavy manual labour and coupling the both with proper alignment and levelling and re connecting the electric connections of motor including thimbling, taping etc as required at site or as per directions of engineer in charge. This also includes connecting the delivery and suction of pump to delivery and suction line respectively with the help of nut bolts of proper size and rubber packing with the help of fitter as required at site | 2 | Job. | 38,610 ₹45,559.8 Lowest | 40,200 ₹47,436 |
| 1.08 | Testing & commissioning of above system first at NO LOAD & then at ON LOAD and for its proper operating as per the satisfaction of engineer in charge. | 2 | Job. | 29,550 ₹34,869 Lowest | 30,600 ₹36,108 |
Tender Value
Refer Docs
EMD Value
₹5,200
Closing Date
18 Aug 2026, 11:15 amClosed
Executive Engineer (EnM) M-8
Office of the Executive Engineer (EnM) M-8 Nangloi Phase-III, Near Maharaja Surajmal Stadium Metro Station New Delhi-110041.
Renovation/ Repairing of foundation of set no 1 and 2 at Jaunty Pumphouse in AC-08 pumphouse.
2026_DJB_296733_1
NIT No.09 /EE(EnM)M-8/2026-27 Item 03
Open Tender
Civil Works
Works
30 days
Nangloi
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No SB 50448339804
₹5,200
Yes
24 Aug 2026
10 Aug 2026
18 Aug 2026
10 Aug 2026
18 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of electric connection from panel and motor, pump and motor from coupling, motor and pump removed from base frame. Removing suction and delivery lines, sluice valves, NRV, old damaged MS base frame from foundation etc by electric cutter, gas cutter, tools and tackles, manual labour and shifting the same to JE store. | 2 | Job. | 80 | ₹160 |
| 1.02 | Breaking of existing RCC foundation of by manual means including manual tools or electric demolition hammer as per site requirement including digging upto 50 cm for laying the new foundation and disposing off malba as per instructions from engineer – in – charge within 1 km of radius from site. | 2 | Job. | 80 | ₹160 |
| 1.03 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) in foundation of pump including form work and finishing etc as required or as per site requirement.(foundation size approx:1.37mX.45mX.1m) | 2 | Job. | - | - |
| 1.04 | Providing and fixing of MS base frame as per site sample and directions of engineer in charge for 60 HP motor and pump set. | 2 | Job. | - | - |
| 1.05 | Supply of MS Nut bolt & Washer of off size. | 50 | Kg. | 80 | ₹4,000 |
| 1.06 | Supply of 75% Neoprene Rubber sheet. | 30 | Kg. | 80 | ₹2,400 |
| 1.07 | Re installing the motor and pump on new foundation with the help of heavy manual labour and coupling the both with proper alignment and levelling and re connecting the electric connections of motor including thimbling, taping etc as required at site or as per directions of engineer in charge. This also includes connecting the delivery and suction of pump to delivery and suction line respectively with the help of nut bolts of proper size and rubber packing with the help of fitter as required at site | 2 | Job. | - | - |
| 1.08 | Testing & commissioning of above system first at NO LOAD & then at ON LOAD and for its proper operating as per the satisfaction of engineer in charge. | 2 | Job. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_395112.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .