Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance HOUSE NO 11 BYE LANE 1 EAST PUB SARANI SANKAR DEB PATH CHANDMARI DIST KAMRUP METRO ASSAM 781003 | GUWAHATI | KAMRUP METRO | ASSAM | 781003 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹72,000
Closing Date
16 Jul 2020, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE GUWWAHATI
SATGAON PO KAMRUP DITT GUWAHATI 27
AMC Annual Maintenance of contract of Computers and its accessories under GE Guwahati.
2020_MES_355786_1
3002/04/E3 dt 25 Jun 2020
Limited
Job Works
Works
30 days
GE GUWAHATI
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
20 Jul 2020
25 Jun 2020
20 Jul 2020
26 Jun 2020
16 Jul 2020
30 Jun 2020
27 Jun 2020 - 29 Jun 2020
60 days
Amount
Annual Maintenance contract (AMC) for computers and its peripherals / accessories at offices of GE Guwahati located at Narengi Cantt/Basistha. The list of computers and its accessories is furnished as under : ANNUAL MAINTENANCE CONTRACT OF PC'S COMPLETE WITH MONITOR & OTHER ACCESSORIES HELD IN GE GUWAHATI (I) Desk top complete with accessories - 18 Nos (ii) UPS 600 VA/800 VA/ 1KVA - 14 (iii) Laser Jet Printer - 10 (iv) Ricoh SP 200 Printer - 4 Ch to : 01/495/03
TERMS & CONDITIONS OF AMC SCOPE OF CONTRACT : (a) This Annual Maint contract for the maint and repair of all the hardware and softwer of the computers, its peripherals and accessories as any new computers/printers purchased by the Dept during the currency of the AMC shall not be covered under this AMC. However any upgrade/update of system shall be coered under this contract. Any new part to be incorporated will be paid separately. (b) Terms : The rates quoted by the firm shall include the cost of repairs/maintenance and labour of all old parts as would be required to make good the defect reported in the Computers / its accessories. The term computer includes all parts within the casing of the CPU as existing on the day of AMC is signed. The term Peripherals includes all components used with the CPU like HDD, FDD, Monitor Key board, Mouse and CD speakers, Printers, caples connections, etc as existing. The term accessories includes items used for the functioning of the computer such as CVT,UPS etc as is existing.
(c) PERIOD OF AMC : The period of AMC will be one year from the date it is signed, (AMC may be terminated by the deptt by giving one month's notice). (d) CONDITION OF EQUIPMENT : The computer and their peripherals/accessories shall be maintained from the first day of the AMC on an as - it- where- is basis.
(f) BINDING DECISION : Decision of the Garrison Engineer Guwahati shall be final and binding in determining whether the repairs had been taken up within the stipulated time, proceeded with due diligence and completed satisfactorily within the stipulated time. (g) SERVICE VISITS : Service Engineer of the Firm shall visit the Dept twice in each week to check the dept's computer equipment.
PAYMENT TERMS (a) Installments : Payment shall be made in four equal installments to be made at the end of each quarter (after three months) by means of SBI CMP through and by the GE Guwahati. (b) The following documents at the end of each such quarter shall be submitted by the firm for payment. (i) Pre- stamped & pre-receipted bill in triplicate. (ii) Satisfactroy maintenance/repair report. (iii) FINAL BILL : Original copy of AMC shall be returned alongwith the final bill.
11. If any time after conclusion of this agreement, the client decides to postpone or abandon the project, he may, by giving seven days’ notice in writing to the consultant terminate this agreement, provided that if the project or any part thereof is postponed, the client, may, in lieu of terminating this agreement require the consultant in writing to suspend the carrying out of his services under this agreement, for the time being. If the client does not require the consultant to resume performance of services in respect of any postponed work within a period of three month from the date of the client’s requirement in writing to the consultant to suspend the carrying out of his services, such work shall be considered to have been abandoned and this agreement shall be deemed, to be terminated. 12. If this agreement is terminated in pursuance of Clause 11, the consultant shall be eligible for payment of proportionate fees for the portion of consultancy services already rendered, as assessed by the client. The client’s decision in this respect shall be final and binding; no other compensation whatsoever shall be paid.
13. If the consultant commits any breach of any of the provisions of this agreement, the client shall be entitled to cancel this agreement and on such cancellation the fees payable shall be proportionate to the services, if any, already rendered by the consultant as assessed by the client, less ten percent. 14. All payments to the consultant shall be made through crossed cheque, A/C payee by the GE Guwahati. 15. If the consultant fails to complete the work of any phase on or before the date(s) fixed for completion of that phase he shall, without prejudice to any other right or remedy of client on account of such breach, be liable to pay compensation for delay in completion of work @ 1% per week for that particular phase subject to the maximum of 10% of total value of work for the phase.
Appx 'B' The consultancy services for evaluation/assessment of structural soundness of more than 30 years old six storied building alongwith providing remedial measures for rehabilitation & restoration to enhance its life to suit further habitation as mentioned hereinafter shall be provided in three phases as under with the following time schedules :-
Phase-I Collection of all preliminary details, and discussion on various details as mentioned in Section 1 hereinafter. Carrying out tests on ground and necessary laboratory tests, analysis of tests, detail dovetailing on drawings, preparation of remedial measures for Rehabilitation work etc.
Phase-II Visit to Site during execution of work (03 Nos) at appropriate stages.
Phase-III Submission of final report for satisfactory execution of rehabilitation work on ground
Note:- Separate work orders for each Phase shall be placed by client as per actual ground requirement. The consultancy services shall consist of following scope of work which is required to be conducted/ carried out to the satisfaction of the client for the building which is more than 30 years old of brief specifications as under. Consultant shall furnish structural soundness of building based on tests given hereinafter under Section 2(c), engineering practice/concepts and any other methods/tests required to be carried out to arrive the conclusion. Consultant shall give detailed remedial measures required to repair the distress and furnish details for retrofitting/restoration & rehabilitation, to enhance its life to suit further habitation.
BRIEF SPECIFICATION OF BUILDING:- (a) Type of Building : (G+5) storied with length approx. 45.13 m & width approx. 43.92m & 36.74m (b) Construction : RCC Framed construction (c) Foundation : RCC (d) Structure components: RCC Columns , Beam with brick partition (e) Roof/floor slabs : RCC Slab (f) Slab support/beams: RCC Beam (g) Plaster : Cement Plaster (h) Roof treatment : PCC Padding
SECTION 1:- (A) Preparation of survey report of structure w.r.t. its present condition, ageing, exposure condition, habitation, pattern of distresses, surrounding environment, weathering effects, ground water table, drainage system, internal & external services, change pattern of loading, maintenance, collection of ground data etc. (B) Preparation of drawings & sketches and to demarcate location extent of distress, pattern of cracks, shear failure, repair & retrofitting etc.:- (C) The consultant shall get the above mentioned drawings checked from GE Guwahati for correctness.
SECTION 2:- (A) Condition Assessment and Analysis:- (a) Identification of cause of problem in building (b) Effects of earlier repair work & restorations (c) Effects/extent of deterioration due to leakage, seepage from roof, toilets, roof top tanks etc. (d) Carbonation in RCC slabs, spalling of reinforcement covers and plaster. (e) Distress if any caused due to over burden of structure by addition/alteration. (f) Seepage if any through basement, foundation and side walls. (g) Ventilation (h) Roof treatments by PCC padding & present polymer based products. (j) Thermal effects such as shrinkage, creep, expansion etc. (k) Relative humidity progression (l) Assessment of residual strength of critical section and members
(B) Condition Mapping: - Following shall be identified and marked on the drawing/sketches:- (a) General defects & deterioration such as dampness, seepage, erosion, signs of ageing etc. (b) Structural cracks (c) Areas of distresses (d) Repair & retrofitting with sketches & sections
(C) Mandatory Field and Laboratory Tests: - Following main tests shall be carried out to assess the soundness of the structure in terms of IS 13311 Pt I of II, relevant IS, BS & International codes. (i) Rebound Hammer Test( As per Standard) -60 Nos (ii) Ultrasonic Pulse Velocity Test( As per Standard) -60 Nos (iii) Half Cell Potential Test( As per Standard) -12 Nos (iv) Rebar Scanning(G+5 Storied Col Beam Str)– 01no (v) CAPO Test(As per standard ASTM C900)-08 Nos (vi) The above minimum test are required to be carried out at site to check soundness of building. However if more no of tests over to specified in each case are required to carry out arrived final result the same shall be carried out without any extra cost to the client. (vii) The test result shall be carried out in the present of nominated representative of client and all the testing shall be recorded by a video graphic content shall be submit along with the detailed project report. (viii) The location of test where it has carried out shall be made good to the satisfaction of the GE.
(D) Analysis of Tests and Data:- After collection of various ground data, field & laboratory tests, analysis shall be carried out to arrive the reasons/causes of distress & extent of deterioration occurred over a period of time & durability and adoption of protective measure for each cause. All details shall be furnished step by step to arrive the conclusion.
(E) Submission of Report :- Irrespective of whether the consultant recommends the present building suitable for present habitat i.e. single living accommodation for troops or not, the consultant shall submit recommendation/suggestion to make more smooth utilization of building in future for purpose other than present habitation along with final report containing following :- (a) Detailed report containing details given Section 1 & 2 above. (b) All test results observations and results thereof along with video graphic recording in DVDs. (b) Architectural drawings and sketches. (c) Soft copy of architectural drawings, analysis etc. (d) A power point presentation on the complete project report after preparation of detailed report in the office of the client by taking prior appointment from the client for the time and date of presentation.
(K) Bills of Quantities (BOQ) and Estimation:- Consultant shall furnish detailed scope of work and specifications for each item of work required to be carried out for rehabilitation of the building, to GE Guwahati.
VISHWAKARMA ELECTRICAL
stage.html
html • 0.02 MB
finance_397288.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .