| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.2 LAccepted-AOC | ₹53.2 L | L1 | Accepted-AOC AOC |
| 2 | L2₹55.6 L+₹2.4 L (4.53%)Rejected-Finance | ₹55.6 L+₹2.4 L (4.53%) | L2 | Rejected-Finance 2nd Highest |
| 3 | L3₹59.5 L+₹6.3 L (11.9%)Rejected-Finance | ₹59.5 L+₹6.3 L (11.9%) | L3 | Rejected-Finance Third Highest |
| 4 | L4₹63.8 L+₹10.6 L (20.0%)Rejected-Finance | ₹63.8 L+₹10.6 L (20.0%) | L4 | Rejected-Finance 4th Highest |
| 5 | L5₹66.0 L+₹12.8 L (24.1%)Rejected-Finance | ₹66.0 L+₹12.8 L (24.1%) | L5 | Rejected-Finance 5th Highest |
| Sl No | Description | Qty | Unit | Mamra estate L5 | RAI BUILDERS L6 | MAJHA EARTHMOVERS L2 | ANIL ARCHITECT AND ENGINEERING CONSULTANTS L3 | Sharma Constructions L1 | SHIVAY CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | HOISTING, ROOFING AND WATER PROOFING Top Khurra 0.6mx0.6m for rain water pipe in 25mm thick cement concrete 1:2:4 over 50.00 thick cement concrete 1:8:16 | 63 | Nos. | 80 ₹5,040 | 100 ₹6,300 | 53 ₹3,339 Lowest | 80 ₹5,040 | 95 ₹5,985 | 95 ₹5,985 |
| 2.00 | Cement concrete 1:2:4 gola 10cm x 10cm concave quadrant along junction of roofs with parapet wall finished smooth, where specially specified. | 963 | Mtr | 58 ₹55,854 | 50 ₹48,150 Lowest | 53 ₹51,039 | 50 ₹48,150 Lowest | 100 ₹96,300 | 60 ₹57,780 |
| 3.00 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes single socketed (working pressure 4 kgf / cm²) conforming to IS : 4985, including fixing with MS clamps. U-PVC pipes (working pressure 4 kgf. / sqcm) pipe 110 mm dia. | 306.9 | mt | 286 ₹87,773.4 | 250 ₹76,725 | 203 ₹62,300.7 Lowest | 240 ₹73,656 | 250 ₹76,725 | 245 ₹75,190.5 |
| 4.00 | Providing and fixing 110 mm dia. U.P.V.C bend for Rain water pipe as per IS:14735 including jointing complete as per specifications and to the entire satisfaction of Engineer- in- charge.UPVC 110 mm bend | 126 | Nos. | 140 ₹17,640 | 150 ₹18,900 | 103 ₹12,978 Lowest | 120 ₹15,120 | 110 ₹13,860 | 130 ₹16,380 |
| 5.00 | Water proofing of roof terraces, Basements, Retaining Walls, Water tanks etc with Zydex Zycoprime / Elastobar / Equivalent solution so as to form a water-resistant cementitious bonding coat and to form on-site seamless cross-linked elastomeric membrane on the concrete surface to reduce its porosity. Creating a cementitious elastomeric polymeric membrane of Elastobar and Zycoprime/Equivalent after application of Zycosil & Zycoprime Solution in New Construction. Take equal parts of Elastobar and Cement and form a paste. Add little water to the paste to make it brushable. Apply the paste on surface with brush. Leave the surace for drying for at least 4 - 6 hours to get elastomeric membrane. After this application, make one more layer of rough cementatios membrane using mixture of 1 Part of Zycoprime + 1 Part of Cement + 1 Part of fine sand. Apply paste on the surface with a brush to make a rough texture. Now your surface is ready to bond well with tiles/screed. | 1,768.23 | Sq.Mtr | 415 ₹7,33,815.45 | 440 ₹7,78,021.2 | 333 ₹5,88,820.59 Lowest | 395 ₹6,98,450.85 | 350 ₹6,18,880.5 | 425 ₹7,51,497.75 |
| 6.00 | DISMANTLING Dismantling concrete Cement concrete plain1:2:4 mix | 38.37 | Cum | 1,186 ₹45,506.82 | 1,500 ₹57,555 | 791 ₹30,350.67 Lowest | 900 ₹34,533 | 4,000 ₹1,53,480 | 1,400 ₹53,718 |
| 7.00 | Dismantling cement conglomerate floors 25mm to 50mm thick without concrete base | 3,712.52 | Sq.Mtr | 35 ₹1,29,938.2 | 40 ₹1,48,500.8 | 43 ₹1,59,638.36 | 45 ₹1,67,063.4 | 25 ₹92,813 Lowest | 50 ₹1,85,626 |
| 8.00 | Scraping Cement plaster | 1,192.5 | Sq.Mtr | 38 ₹45,315 | 25 ₹29,812.5 | 21 ₹25,042.5 | 20 ₹23,850 Lowest | 80 ₹95,400 | 35 ₹41,737.5 |
| 9.00 | MATERIALS Supply of tiles 22.86cm x 11.43 cm x 3.81 cm hand moulded at kiln site in place of broken tiles Including loading & unloading Tiles 22.86cm X 11.43cm X 3.81cm hand moulded at kiln site for all Districts. | 3,000 | each | 20 ₹60,000 | 8.5 ₹25,500 | 6 ₹18,000 | 8 ₹24,000 | 6.9 ₹20,700 | 5.5 ₹16,500 Lowest |
| 10.00 | CONCRETE Cement concrete 1:2:4 mixing by me mixer volumetric type | 33.55 | Cum | 4,800 ₹1,61,040 | 4,500 ₹1,50,975 | 2,500 ₹83,875 Lowest | 5,000 ₹1,67,750 | 5,000 ₹1,67,750 | 4,500 ₹1,50,975 |
Tender Value
₹73.8 L
EMD Value
₹1.5 L
Closing Date
2 Jul 2026, 1:00 pmClosed
Executive Engineer
Execuitve Engineer Building Maintenance and Plantation Shahpurkandi
Estimate for special repair works of T 6 Type Residential quarters including roof treatment external wall pointing painting and other allied works at RSD Colony Shahpurkandi
2026_WR_170112_1
30/2026
Open Tender
Civil Works - Buildings
Item Rate
90 days
Ranjit Sagar Dam Colony Shahpurkandi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹1.5 L
10 Aug 2026
15 Jun 2026
3 Jul 2026
15 Jun 2026
2 Jul 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HOISTING, ROOFING AND WATER PROOFING Top Khurra 0.6mx0.6m for rain water pipe in 25mm thick cement concrete 1:2:4 over 50.00 thick cement concrete 1:8:16 | 63 | Nos. | - | - |
| 2 | Cement concrete 1:2:4 gola 10cm x 10cm concave quadrant along junction of roofs with parapet wall finished smooth, where specially specified. | 963 | Mtr | - | - |
| 3 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes single socketed (working pressure 4 kgf / cm²) conforming to IS : 4985, including fixing with MS clamps. U-PVC pipes (working pressure 4 kgf. / sqcm) pipe 110 mm dia. | 306.9 | mt | - | - |
| 4 | Providing and fixing 110 mm dia. U.P.V.C bend for Rain water pipe as per IS:14735 including jointing complete as per specifications and to the entire satisfaction of Engineer- in- charge.UPVC 110 mm bend | 126 | Nos. | - | - |
| 5 | Water proofing of roof terraces, Basements, Retaining Walls, Water tanks etc with Zydex Zycoprime / Elastobar / Equivalent solution so as to form a water-resistant cementitious bonding coat and to form on-site seamless cross-linked elastomeric membrane on the concrete surface to reduce its porosity. Creating a cementitious elastomeric polymeric membrane of Elastobar and Zycoprime/Equivalent after application of Zycosil & Zycoprime Solution in New Construction. Take equal parts of Elastobar and Cement and form a paste. Add little water to the paste to make it brushable. Apply the paste on surface with brush. Leave the surace for drying for at least 4 - 6 hours to get elastomeric membrane. After this application, make one more layer of rough cementatios membrane using mixture of 1 Part of Zycoprime + 1 Part of Cement + 1 Part of fine sand. Apply paste on the surface with a brush to make a rough texture. Now your surface is ready to bond well with tiles/screed. | 1,768.23 | Sq.Mtr | - | - |
| 6 | DISMANTLING Dismantling concrete Cement concrete plain1:2:4 mix | 38.37 | Cum | - | - |
| 7 | Dismantling cement conglomerate floors 25mm to 50mm thick without concrete base | 3,712.52 | Sq.Mtr | - | - |
| 8 | Scraping Cement plaster | 1,192.5 | Sq.Mtr | - | - |
| 9 | MATERIALS Supply of tiles 22.86cm x 11.43 cm x 3.81 cm hand moulded at kiln site in place of broken tiles Including loading & unloading Tiles 22.86cm X 11.43cm X 3.81cm hand moulded at kiln site for all Districts. | 3,000 | each | - | - |
| 10 | CONCRETE Cement concrete 1:2:4 mixing by me mixer volumetric type | 33.55 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
BOQ_346300.xls
BOQ • 0.33 MB
CorrigendumT6.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .