Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC | L1 | Accepted-AOC Awarded | |
| 2 | L3₹12.7 LSame as L1Rejected-Finance AT PO RETANG PS TAMANDO DIST KHORDHA | RETANG | KHORDHA | ODISHA | L3 | Rejected-Finance Not Sucess in Lottery | |
| 3 | L3₹12.7 LSame as L1Rejected-Finance | L3 | Rejected-Finance Not Sucess in Lottery | |
| 4 | L3₹12.7 LSame as L1Rejected-Finance | L3 | Rejected-Finance Not Sucess in Lottery | |
| 5 | L3₹12.7 LSame as L1Rejected-Finance AT PAMPALO PO CHANAHATA PS BALIANTA DIST KHURDA | L3 | Rejected-Finance Not Sucess in Lottery |
Tender Value
₹12.7 L
EMD Value
₹12,711
Closing Date
7 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, BHUBANESWAR
Bisuniapada to Baliamala road_Road_CC Overlaying0.200 to 0.500
2026_CERWI_134062_1
Tender online Division BBSR-08
Open Tender
Civil Works - Roads
Percentage
60 days
Khordha
2 documents required · 2 mandatory
₹6,000
₹12,711
Yes
9 Oct 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
7 Jul 2026
2 Jul 2026
2 Jul 2026 - 7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of grith upto 300mm removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means andstacking of serviceable materials to be used or auctioned upto a lead of 1000m incuding removal and disposal of top organic soil not exceeding 150mm in thickness as per direction of Engineer-in-charge. | 239.7 | Sqm | 8.63 | ₹2,068.61 |
| 2 | Cement concrete of proportion (1:3:6) in foundation using 4cm size black broken granite stone aggregates of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm(6") thick to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with T&P required for the work etc. complete i as per direction of the Engineer-in-charge. | 3.97 | Cum | 6,448.69 | ₹25,601.3 |
| 3 | Providing Cement Concrete of (1:1.5:3) with 20mm down graded stone aggregate in foundations upto a depth of 1.5m below ground level and upto a height of 1.5m above ground level / bed level including cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C. | 158.63 | Cum | 7,838.57 | ₹12,43,432.36 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.50 MB
Tendernotice_1.pdf
PDF • 2.55 MB
BOQ_599205.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .