Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹46.0 LAccepted-AOC | 1st | Accepted-AOC Tender allotted | |
| 2 | 2nd₹47.1 L+₹1.1 L (2.45%)Rejected-AOC HOUSE NO 1872 SECTOR 13 17 HOUSING BOARD COLONY PANIPAT 132103 | PANIPAT | PANIPAT | HARYANA | 132103 | 2nd | Rejected-AOC Tender not alloted | |
| 3 | 3rd₹48.0 L+₹2.0 L (4.45%)Rejected-AOC | 3rd | Rejected-AOC Tender not alloted | |
| 4 | 4th₹48.3 L+₹2.3 L (4.98%)Rejected-AOC | 4th | Rejected-AOC Tender not alloted | |
| 5 | 5th₹48.5 L+₹2.5 L (5.52%)Rejected-AOC | 5th | Rejected-AOC Tender not alloted |
Tender Value
₹53.7 L
EMD Value
₹1.1 L
Closing Date
8 Apr 2025, 5:00 pmClosed
RISHI SACHDEVA
PD-I, Kurukshetra
CONSTRUCTION OF BOUNDARY WALL OF MIRZAPUR TEMPORARY BUS STAND DHAND ROAD IN DISTRICT KURUKSHETRA
2025_HRY_434755_1
2025D0C40930 6991 4466 938B 2898451C79B6609BAR
Open Tender
Civil Works
Works
120 days
MIRZAPUR
CONSTRUCTION OF BOUNDARY WALL OF MIRZAPUR TEMPORARY BUS STAND DHAND ROAD IN DISTRICT KURUKSHETRA
2 documents required · 2 mandatory
₹5,000
₹1.1 L
Yes
Ambala Circle, PWD BandR, Ambala Cantt
16 Jul 2025
20 Mar 2025
8 Apr 2025
20 Mar 2025
8 Apr 2025
20 Mar 2025
24 Mar 2025
Amount
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[11.58]Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete [Through Rate]
[11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate]
[11.67.1]Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 1. Water thinnable cement primer [Through Rate]
[11.69.1]Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. 1. With ready mixed pink or grey primer on wood work (hard and soft wood) having VOC content less than 50 grams/ litre [Through Rate]
[11.84.1]Painting over the wooden/metal surface with aluminium paint of approved brand and manufacture to give an even shade . 1. Two or more coats on new work [Through Rate]
[11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate]
[13.30.1]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubes [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns [Through Rate]
[6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
[7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
Credit for Good Bricks @ Rs. 4 / Each (Minimum Reserved Price)
Credit for Brick Bats @ Rs. 450 / Cum (Minimum Reserved Price)
Dilbag singh contractor (BID ID -1237495)
VANI CONSTRUCTION CO (BID ID -1237191)
The Tirupati Co-Op L/C Society Ltd (BID ID -1237600)
PARLAHAD SINGH CONTRACTOR (BID ID -1238161)
M S CONSTRUCTION CO. (BID ID -1238254)
The New Karnal Coop Society Ltd (BID ID -1236494)
Rohit Kumar Contractor (BID ID -1236356)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .