Regional Officer, Itanagar, MoRTH
Tezpur Assam 784001
Rectification of Accident Black Spots at Lekhi Village (Km 46.300 to Km 46.870), Bage Tinali (Km 48.500 to Km 49.500), New Galaxy Academy (Km 49.820 to Km 50.700) and Banderdewa (Km 58.900 to Km 59.170) on NH 415 in Arunachal Pradesh
2020_MoRTH_540639_1
RW/NH/30002/Black Spot/Naharlagun/2019-20
Open Tender
Civil Works - Highways
Item Rate
90 days
Arunachal Pradesh
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
RPAO MoRTH
Exempted
7 Feb 2020
31 Jan 2020
6 Feb 2020
31 Jan 2020
5 Feb 2020
31 Jan 2020
31 Jan 2020 - 3 Feb 2020
Amount
Providing road safety measures to Blackspot No. 1 Banderdewa
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Supplying and fixing at site retro-reflectorised type sign boards/signs made of encapsulated lense type of reflective sheeting fixed over aluminum sheeting complete including vertical pipes/ angles/ posts etc. all complete as per drawing and technical specifications Clause 801 & IRC 67
60 cm circular
60 cm octagonal
60 cm equilateral triangle
Hazard marker
Direction Signs (<than 0.9 sqm size )
Solar Blinkers
Providing and fixing of reflective Pavement marker (Road studs) installed in concrete or asphaltic surface by drilling and bedded in a suitable bituminous grout or epoxy mortar, all complete as per BS 873 part 4:1973
Providing Road Marking in 3 rows with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface as speed breakers
Street Lighting (Providing and erecting street light mounted on a steel circular hollow pole of standard specifications for street lighting, 10 m high spaced 30 m apart, 1.8 m overhang on both sides if fixed in the median and on one side if fixed on the footpath, fitted with sodium vapour lamp and fixed firmly in concrete foundation.)
Providing Shoulder Repair complete
Providing footpath complete
Construction of embankment with approved materials from Borrow area complete as per Technical Specifications Clause 305 (3.5m wide additional lane 100m straight + 70 taper both side).
Construction of Subgrade and Shoulder with approved material obtained from borrow area with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 of MoRTH specification complete as per drawings and Technical Specification Clause 305.and 408.
Constructing Granular Sub-base by providing close graded material mix conforming to Grading –V(Table–400-1) complete as per Technical Specifications Clause 401.
Providing laying spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per Technical Specifications Clause 406 and Table 400-13
Providing and applying bituminous prime coat (cationic Bitumen Emulsion SS1 Grade conforming to IS: 8887) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of mentioned in Table 500-3 of Technical Specification using mechanical means.
Providing tack coat (cationic Bitumen Emulsion RS1 Grade conforming to IS: 8887) using emulsion pressure distributor at the rate mentioned in Table 500-5 of Technical Specification on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying Dense Graded Bituminous Macadam Course (With Bitumen VG-30 Grade) as per Technical Specification Clause 505 and Table 500-10 complete in all respect as per direction of Engineer.
For Grading I
Providing & laying Bituminous Concrete complete as per drawing and Technical Specification Clause 507 and Table 500-17 complete in all respect as per direction of Engineer.
For Grading-I
Sub Total
Providing road safety measures to Blackspot No.2 New Galaxy Academy
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Supplying and fixing at site retro-reflectorised type sign boards/signs made of encapsulated lense type of reflective sheeting fixed over aluminum sheeting complete including vertical pipes/ angles/ posts etc. all complete as per drawing and technical specifications Clause 801 & IRC 67
60 cm circular
60 cm Octangle
60 cm equilateral triangle
Hazard marker
Solar Blinkers
Providing and fixing of reflective Pavement marker (Road studs) installed in concrete or asphaltic surface by drilling and bedded in a suitable bituminous grout or epoxy mortar, all complete as per BS 873 part 4:1973
Providing Road Marking in 3 rows with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface as speed breakers
Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 810
Street Lighting (Providing and erecting street light mounted on a steel circular hollow pole of standard specifications for street lighting, 10 m high spaced 30 m apart, 1.8 m overhang on both sides if fixed in the median and on one side if fixed on the footpath, fitted with sodium vapour lamp and fixed firmly in concrete foundation.)
Providing Shoulder Repair complete
Providing footpath (1.5m width)complete
Construction of embankment with approved materials from Borrow area complete as per Technical Specifications Clause 305.
Construction of Subgrade and Shoulder with approved material obtained from borrow area with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 of MoRTH specification complete as per drawings and Technical Specification Clause 305.and 408.
Constructing Granular Sub-base by providing close graded material mix conforming to Grading –V(Table–400-1) complete as per Technical Specifications Clause 401.
Providing laying spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per Technical Specifications Clause 406 and Table 400-13
Providing and applying bituminous prime coat (cationic Bitumen Emulsion SS1 Grade conforming to IS: 8887) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of mentioned in Table 500-3 of Technical Specification using mechanical means.
Providing tack coat (cationic Bitumen Emulsion RS1 Grade conforming to IS: 8887) using emulsion pressure distributor at the rate mentioned in Table 500-5 of Technical Specification on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying Dense Graded Bituminous Macadam Course (With Bitumen VG-30 Grade) as per Technical Specification Clause 505 and Table 500-10 complete in all respect as per direction of Engineer.
For Grading I
Providing & laying Bituminous Concrete complete as per drawing and Technical Specification Clause 507 and Table 500-17 complete in all respect as per direction of Engineer.
For Grading-I
Sub Total
Providing road safety measures to Blackspot No. 3 Bage-Tinali
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Supplying and fixing at site retro-reflectorised type sign boards/signs made of encapsulated lense type of reflective sheeting fixed over aluminum sheeting complete including vertical pipes/ angles/ posts etc. all complete as per drawing and technical specifications Clause 801 & IRC 67
60 cm circular
60 cm equilateral triangle
Hazard marker
Direction Signs (<than 0.9 sqm size )
Solar Blinkers
Providing and fixing of reflective Pavement marker (Road studs) installed in concrete or asphaltic surface by drilling and bedded in a suitable bituminous grout or epoxy mortar, all complete as per BS 873 part 4:1973
Providing Road Marking in 3 rows with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface as speed breakers
Providing cement concrete paving for parking with 150mm Granular subase, 50mm sand layer and 80mm thick paving tiles complete.
Street Lighting (Providing and erecting street light mounted on a steel circular hollow pole of standard specifications for street lighting, 10 m high spaced 30 m apart, 1.8 m overhang on both sides if fixed in the median and on one side if fixed on the footpath, fitted with sodium vapour lamp and fixed firmly in concrete foundation.)
Providing Shoulder Repair complete
Providing footpath complete
Construction of embankment with approved materials from Borrow area complete as per Technical Specifications Clause 305.
Construction of Subgrade and Shoulder with approved material obtained from borrow area with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 of MoRTH specification complete as per drawings and Technical Specification Clause 305.and 408.
Constructing Granular Sub-base by providing close graded material mix conforming to Grading –V(Table–400-1) complete as per Technical Specifications Clause 401.
Providing laying spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per Technical Specifications Clause 406 and Table 400-13
Providing and applying bituminous prime coat (cationic Bitumen Emulsion SS1 Grade conforming to IS: 8887) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of mentioned in Table 500-3 of Technical Specification using mechanical means.
Providing tack coat (cationic Bitumen Emulsion RS1 Grade conforming to IS: 8887) using emulsion pressure distributor at the rate mentioned in Table 500-5 of Technical Specification on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying Dense Graded Bituminous Macadam Course (With Bitumen VG-30 Grade) as per Technical Specification Clause 505 and Table 500-10 complete in all respect as per direction of Engineer.
For Grading I
Providing & laying Bituminous Concrete complete as per drawing and Technical Specification Clause 507 and Table 500-17 complete in all respect as per direction of Engineer.
For Grading-I
Sub Total
Providing road safety measures to Blackspot No. 4 Lekhi Village near Essar Petrol Pump
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Supplying and fixing at site retro-reflectorised type sign boards/signs made of encapsulated lense type of reflective sheeting fixed over aluminum sheeting complete including vertical pipes/ angles/ posts etc. all complete as per drawing and technical specifications Clause 801 & IRC 67
60 cm circular
60 cm equilateral triangle
60 cm octagonal
Solar Blinkers
Providing and fixing of reflective Pavement marker (Road studs) installed in concrete or asphaltic surface by drilling and bedded in a suitable bituminous grout or epoxy mortar, all complete as per BS 873 part 4:1973
Providing Road Marking in 3 rows with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface as speed breakers
Street Lighting (Providing and erecting street light mounted on a steel circular hollow pole of standard specifications for street lighting, 10 m high spaced 30 m apart, 1.8 m overhang on both sides if fixed in the median and on one side if fixed on the footpath, fitted with sodium vapour lamp and fixed firmly in concrete foundation.)
Providing Shoulder Repair complete
Providing footpath complete
Construction of embankment with approved materials from Borrow area complete as per Technical Specifications Clause 305.
Construction of Subgrade and Shoulder with approved material obtained from borrow area with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 of MoRTH specification complete as per drawings and Technical Specification Clause 305.and 408.
Constructing Granular Sub-base by providing close graded material mix conforming to Grading –V(Table–400-1) complete as per Technical Specifications Clause 401.
Providing laying spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per Technical Specifications Clause 406 and Table 400-13
Providing and applying bituminous prime coat (cationic Bitumen Emulsion SS1 Grade conforming to IS: 8887) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of mentioned in Table 500-3 of Technical Specification using mechanical means.
Providing tack coat (cationic Bitumen Emulsion RS1 Grade conforming to IS: 8887) using emulsion pressure distributor at the rate mentioned in Table 500-5 of Technical Specification on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying Dense Graded Bituminous Macadam Course (With Bitumen VG-30 Grade) as per Technical Specification Clause 505 and Table 500-10 complete in all respect as per direction of Engineer.
For Grading I
Providing & laying Bituminous Concrete complete as per drawing and Technical Specification Clause 507 and Table 500-17 complete in all respect as per direction of Engineer.
For Grading-I
Sub Total
KUSHAL KONWAR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .