| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.3 L+₹51,220.47 (4.35%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | DIVYA ENGINEERING | VIGNESH TRADERS |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding for works in 3m heights, using 13 to 15 cm dia casuarina props, the distance between the two rows being 1.25m and the spacing of posts being 2m in both the rows with two horizontal posts with 0.5m overlap on either side and braces at 2m c/c including longitudinal & transverse middle braces to step up and providing a platform with country wood planks of 40 mm thick & 1m width, etc including cost of all materials, labours, lead, lift, safety measures, etc. complete. | 47.2 | Rm | 23,287.06 ₹27,478.73 Lowest | 24,300.45 ₹28,674.53 |
| 2.00 | Dismantling the spalled/ distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of all labour, lead, lift etc., complete. | 6.5 | M3 | 30,098.77 ₹35,516.55 Lowest | 31,408.72 ₹37,062.29 |
| 3.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. | 287 | Kg | 26,579.07 ₹31,363.3 Lowest | 27,735.68 ₹32,728.1 |
| 4.00 | Providing Micro concrete using Rendroc RG / equivalent to the distressed/ spalled concrete pedestals by applying one coat of Nitozinc / equivalent primer after thorough cleaning of rust in the reinforcement, fabricating and erecting slurry tight form work with plywood shutters with suitable supports which do not deform or leak due to pressure of micro concrete, mixed micro concrete should be placed continuously for an average thickness of 75mm, applying one coat of polymer modified acrylic emulsion (Nitobond AR /equivalent) on the finished surface as a curing membrane, applying DEKGUARD / equivalent primer by spraying to the concrete surface, and applying Two coat of DEKGUARD/ EQUIVALENT top coat to the concrete surface by brush or roller (coating should be done continuously without any break), rate including cost of all materials, labour, lead, lift, T&P's etc., complete. | 86.1 | M2 | 3,36,967.85 ₹3,97,622.06 Lowest | 3,51,633.26 ₹4,14,927.25 |
| 5.00 | Chipping and cleaning the existing damaged plastered surface from walls rate including cost of all labour, lead, lift etc., complete. | 32.8 | M2 | 295.2 ₹348.34 Lowest | 307.99 ₹363.43 |
| 6.00 | Plastering with CM 1:5, 12mm thick including cost of all materials, labour, lead, lift etc., complete. | 32.8 | M2 | 9,334.88 ₹11,015.16 Lowest | 9,740.94 ₹11,494.31 |
| 7.00 | Providing painting with two coats of approved quality of anticorrosive black paint over the inner and outer surfaces of walls including cost of all materials such as paint, through cleaning, brush, labour, lead, lift, etc., complete. | 397.9 | M2 | 51,611.61 ₹60,901.7 Lowest | 53,859.74 ₹63,554.49 |
| 8.00 | Guniting the prepared concrete surface at an average thickness of 50mm in to two layers of 25 mm each using OP/PP cement and sand 1:3 by volume as per ISI 9082/ 1978 using guniting equipment the mixture being ejected and shot into the surface by means of compressed air including treating the existing concrete surface before guniting with watering and applying cement slurry with supplying of materials, labours, lead, etc., complete. | 202.5 | M2 | 6,80,452.65 ₹8,02,934.13 Lowest | 7,10,066.25 ₹8,37,878.18 |
| 9.00 | Cleaning and removing the slush, silt and other debris etc., requiring the aid of baskets from inner compartment with an average lead of 30 m and lift of 4 m and clearing away from the site with a lead of 1 km rate including cost of all labour, lead, lift etc., complete. | 55.6 | M3 | 18,257.37 ₹21,543.7 Lowest | 19,051.9 ₹22,481.24 |
Tender Value
Refer Docs
EMD Value
₹10,300
Closing Date
24 Jul 2025, 2:00 pmClosed
CE TTPS TTN 4
O/o SE Civil TTPS TTN 4
Repair and Maintenance Works to the Ash Slurry Sump Stage 2 for Unit 3
2025_EB_579932_1
CE SE C TTPS Spec No.173 25 26
Open Tender
Civil Works - Others
Item Rate
60 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,300
Yes
1 Nov 2025
9 Jul 2025
25 Jul 2025
9 Jul 2025
24 Jul 2025
9 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .