Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.5 LAdmitted-Fee/PreQual/Technical/Finance | -35.99% | ₹9.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.9 L+₹42,960.73 (4.51%)Admitted-Fee/PreQual/Technical/Finance | -33.10% | ₹9.9 L+₹42,960.73 (4.51%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.1 L+₹61,245.05 (6.44%)Admitted-Fee/PreQual/Technical/Finance | -31.87% | ₹10.1 L+₹61,245.05 (6.44%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹10.1 L+₹61,542.36 (6.47%)Admitted-Fee/PreQual/Technical/Finance | -31.85% | ₹10.1 L+₹61,542.36 (6.47%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹10.2 L+₹69,420.97 (7.30%)Admitted-Fee/PreQual/Technical/Finance | -31.32% | ₹10.2 L+₹69,420.97 (7.30%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.9 L
EMD Value
₹29,730
Closing Date
21 Sept 2026, 6:00 pmClosed
Executive Engineer
RnB Division Kralpora
Construction of Culvert at Shiekh Mohalla Nallah Vij Daril
2026_PWDJK_324666_3
E tendering NIT No 37/RnB/Kralpora of 2026-27
Open Tender
Civil Works
Percentage
40 days
Kralpora
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer RnB Division Kralpora
₹29,730
24 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
14 Sept 2026 - 19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing damaged Culvert, including slab and Abuts, disosal of rubbish (all complete job) incl. diversion of Nallah and dewatering of Foundation Trenches till sub structure is completed | 1 | No | 10,000 | ₹10,000 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. in all kinds of soil | 78.75 | Cum | 187.3 | ₹14,749.88 |
| 3 | Supply and laying of dry stone soling in foundation trenches tightly handpacked with hand ramming, watering and compacting to required density and level surface including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 5.4 | Cum | 1,000 | ₹5,400 |
| 4 | Providing and laying in position cement concrete 1:4:8 grade (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) including curing but excluding the cost of centring and shuttering all work upto plinth level. including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 4.05 | Cum | 5,202.9 | ₹21,071.75 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level (1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 11.34 | Cum | 7,788.4 | ₹88,320.46 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with with:1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 23.76 | Cum | 10,500 | ₹2,49,480 |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 48.6 | Cum | 8,422.45 | ₹4,09,331.07 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all levels incl all costs and carriages Complete Job Thermo-Mechanically Treated bars of grade Fe-500D or more including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 4,135.36 | Kg | 123.2 | ₹5,09,476.35 |
| 9 | Backfilling behind abutments, wing wall and return Wall by way of Nallah muck as per specification incl. Consolidation with PRR all complete including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 36 | Cum | 1,000 | ₹36,000 |
| 10Centering and shuttering including strutting, propping etc. and removal of form work for | |||||
stage.html
html • 0.02 MB
finance_1095375.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.58 MB
BOQ_1095375.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .