| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 LAccepted-AOC | ₹4.5 L Quoted ₹6.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹7.7 LRejected-AOC | ₹7.7 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S.GOPALA KRISHNAN CONTRACTOR L1 | M/s. Rajesh and Company L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for cutting and removal of heavily eroded flue gas duct plates and its supports (Multilayer) from the parent plate, transporting & devoluting scrap to Central Stores/T.T.P.S. | 30 | m² | 45,000 ₹53,100 | 51,000 ₹60,180 |
| 2.00 | Charges for welding eroded initial welding joints in the flue gas duct below 2 Meter level | 100 | Mtr. | 20,000 ₹23,600 | 50,000 ₹59,000 |
| 3.00 | Charges for transporting of 6mm M.S.Plate/Supports to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct above 1.5 meter level and welding the same | 30 | m² | 75,000 ₹88,500 | 90,000 ₹1.1 L |
| 4.00 | Charges for transporting new guide vanes/ splitter plate and leading to boiler flue gas duct. Fixing and welding in the duct | 30 | m² | 78,000 ₹92,040 | 99,000 ₹1.2 L |
| 5.00 | Removal of wear resistance plate for patch up the eroded intricate portion and re fixing the same after completing the patch up | 20 | m² | 32,000 ₹37,760 | 40,000 ₹47,200 |
| 6.00 | Charges for transportation of required scaffolding materials, clamps, wooden planks, etc. from pocket stores to site, leading, lifting and erection of temporary platform in flue gas duct for replacing of wornout support pipes and M.S plates, expansion joint and dismantling the platform and returning to stores after completion of works. | 11 | No. | 80,300 ₹94,754 | 88,000 ₹1.0 L |
| 7.00 | Charges for cleaning of ash from APH hopper and ESP suction side duct portions for 1 APH hopper and two ESP suction paths. | 2 | No. | 5,600 ₹6,608 | 7,000 ₹8,260 |
| 8.00 | Charges for removal of insulation in Expansion Joint fixing area and relaying of single layer insulation with new/released insulation materials after replacement of wornout expansion joint in flue gas duct. | 30 | m² | 33,000 ₹38,940 | 45,000 ₹53,100 |
| 9.00 | Charges for renewal of expansion joint of size 2810 X 2810 mm in Flue gas duct including drawal of materials and devolution of scrap at Central stores. | 2 | No. | 2,76,000 ₹3.3 L | 3,00,000 ₹3.5 L |
Tender Value
Refer Docs
EMD Value
₹4,800
Closing Date
5 Jan 2026, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit II Patch up works in ducts including supports and fixing of guide vanes splitter in flue gas ducts of B pass C path D path for the year 2025 2026
2025_EB_633277_1
CE/TTPS/SE/M-II/No.345/2025-26
Open Tender
Miscellaneous Works
30 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹4,800
Yes
25 Mar 2026
17 Dec 2025
6 Jan 2026
17 Dec 2025
5 Jan 2026
17 Dec 2025
Charges for cutting and removal of heavily eroded flue gas duct plates and its supports (Multilayer) from the parent plate, transporting & devoluting scrap to Central Stores/T.T.P.S.
Charges for welding eroded initial welding joints in the flue gas duct below 2 Meter level
Charges for transporting of 6mm M.S.Plate/Supports to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct above 1.5 meter level and welding the same
Charges for transporting new guide vanes/ splitter plate and leading to boiler flue gas duct. Fixing and welding in the duct
Removal of wear resistance plate for patch up the eroded intricate portion and re fixing the same after completing the patch up
Charges for transportation of required scaffolding materials, clamps, wooden planks, etc. from pocket stores to site, leading, lifting and erection of temporary platform in flue gas duct for replacing of wornout support pipes and M.S plates, expansion joint and dismantling the platform and returning to stores after completion of works.
Charges for cleaning of ash from APH hopper and ESP suction side duct portions for 1 APH hopper and two ESP suction paths.
Charges for removal of insulation in Expansion Joint fixing area and relaying of single layer insulation with new/released insulation materials after replacement of wornout expansion joint in flue gas duct.
Charges for renewal of expansion joint of size 2810 X 2810 mm in Flue gas duct including drawal of materials and devolution of scrap at Central stores.
M/s. Rajesh and Company (BID ID -1546190)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_757651.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid