Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.6 LAccepted-AOC | L1 | Accepted-AOC Lowest rate quoted bidder | |
| 2 | L2₹34.4 L+₹76,031.16 (2.26%)Rejected-Finance 15 29 G S SOUTH STREET MANNARKUDI THIRUVARUR | L2 | Rejected-Finance L2 Bid Rank | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-The bidder has submitted a withdrawal letter. |
| Sl No | Description | Qty | Unit | ILAYARAJA M L2 | BHARATHI CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of Pullavarayan Kudikadu Vadakku theory Annanagar link Road km 1.010 | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 606.6 | Sqm | 6 ₹3,639.6 | 5.93 ₹3,597.14 Lowest |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 1,011 | Sqm | 25 ₹25,275 | 21.84 ₹22,080.24 Lowest |
| 4.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A | 121.32 | Cum | 135 ₹16,378.2 | 131.29 ₹15,928.1 Lowest |
| 5.00Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 6.00 | Km 0/0 -1/0 | 45 | Cum | 850 ₹38,250 | 833.8 ₹37,521 Lowest |
| 7.00 | Km 1/0 -1/011 | 0.49 | Cum | 850 ₹416.5 | 843.24 ₹413.19 Lowest |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 9.00 | Km 0/0 -1/10 | 375.32 | Cum | 3,100 ₹11,63,492 | 3,024.43 ₹11,35,129.07 Lowest |
| 10.00 | Km 1/0 - 1/011 | 4.12 | Cum | 3,100 ₹12,772 | 3,024.43 ₹12,460.65 Lowest |
Tender Value
Refer Docs
EMD Value
₹36,500
Closing Date
25 Jun 2025, 3:00 pmClosed
Joint Director/Project Director
1st floor, DRDA, Collectorate campus,Tiruvarur
Strengthening of Pullavarayan Kudikadu Vadakku theory Annanagar link Road km 1.010
2025_RDTN_568791_1
DIPR/2866/Tender/2025 dt 06.06.2025 pack 11
Open Tender
Civil Works - Roads
Item Rate
180 days
Needamangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹36,500
1st floor, DRDA, Collectorate campus,Tiruvarur
14 Oct 2025
14 Jun 2025
25 Jun 2025
14 Jun 2025
25 Jun 2025
17 Jun 2025
18 Jun 2025
Amount
Strengthening of Pullavarayan Kudikadu Vadakku theory Annanagar link Road km 1.010
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over BM surface using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Bituminous Concrete to 25/30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP .(using Power Roller)
Provision of 5 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Provision for Kilometer stone
Provision for Hectometer Stone
Name Board Charges
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ILAYARAJA M (BID ID -1379330)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .