EXECUTIVE ENGINEER
ELECTRICITY 400KV SUBSTATION DIVISION DAHI CHOWKI UNNAO
REPLACEMENT OF HV BUSHING AND OIL CENTRIFUGING ALONG WITH TRANSPORTATION OF BHUSING FROM BAREILLY TO UNNAO
2024_UPTCL_978643_1
04/ESDU/2024-25
Open Tender
Miscellaneous Works
Fixed-rate
30 days
ELECTY 400 KV SUBSTATION UNNAO
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EXECUTIVE ENGINEER
₹2,000
27 Dec 2024
30 Nov 2024
23 Dec 2024
30 Nov 2024
23 Dec 2024
30 Nov 2024
Amount
Following work to be carried out at 400KV S/S Unnao under Electricity 400KV S/S Division Unnao.
Shifting of 01 No. 420KV Bushing from the store to loading point and safely loading of the above Bushing into DCM/Trucks very safely with help of hydra/crane at 400KV Substation Bareilly along with associated works with all cost of men, materials and hydra/crane required for completion of work.
Safe carriage/transportation of 01 No. 420KV Bushing by DCM/Trucks very safely arranged by the contractor at his own cost from 400KV Substation Bareilly to 400 KV Substation Unnao (Approx. Distance 265 Km.) with all cost of men, DCM/Trucks and T&P.
Unloading and proper stacking of 01 No. Bushing from DCM/Trucks very safely and proper stacking of the above Bushing at suitable place with help of hydra/crane at 400KV Substation Unnao along with other associated works with all cost of men, materials and hydra/crane required for completion of work.
Dismantling of HV Bushing (R-Phase) of 50 MVAR 400 KV Unnao-Bareilly-I Line Reactor. (Crane shall be arranged by the contactor).
Complete erection & commissioning of HV Bushing of 50 MVAR Line Reactor with replacement of Bushing Gasket work to complete the job satisfactorily as per instruction manual or direction of the Engineer.(Crane shall be arranged by the contactor).
Centrifuging of transformer oil of main tank, Radiator tank, Conservator tank, taking IR value at a period of 4 hrs. with BDV value at a period of 12 hrs. till satisfactory results are obtained. Labour, T&P, Centrifuging Technician and Centrifuging machine shall be provided by contactor at his own cost.
Perfect Power Transformer Associates (BID ID -4803700)
Gupta Elect and Engg Works (BID ID -4801537)
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .