Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-Finance | ₹11.2 L | L1 | Accepted-Finance Responsive/Succesfull |
| 2 | L2₹11.4 L+₹17,100 (1.53%)Accepted-Finance | ₹11.4 L+₹17,100 (1.53%) | L2 | Accepted-Finance Responsive |
| 3 | L3₹11.6 L+₹38,569.99 (3.45%)Accepted-Finance | ₹11.6 L+₹38,569.99 (3.45%) | L3 | Accepted-Finance Responsive |
| 4 | L4₹12.2 L+₹97,659.98 (8.73%)Accepted-Finance | ₹12.2 L+₹97,659.98 (8.73%) | L4 | Accepted-Finance Responsive |
| 5 | L5₹13.2 L+₹2.0 L (18.0%)Accepted-Finance | ₹13.2 L+₹2.0 L (18.0%) | L5 | Accepted-Finance Responsive |
Tender Value
₹19 L
EMD Value
₹38,000
Closing Date
5 Aug 2026, 3:00 pmClosed
Executive Engineer RSGC
Executive Engineer RSGC, Srinagar
Stone Lake Edging for Lake C at RSGC, SGr.
2026_Tourm_316949_1
E-NIT 09 of 2026-27 dated 20-07-2026
Open Tender
Civil Works
Percentage
50 days
RSGC srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Secretary RSGC
₹38,000
6 Aug 2026
20 Jul 2026
6 Aug 2026
20 Jul 2026
5 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removal of existing old damaged wooden planks and Cutting of Rubina Wooden posts to the desired height and disposal fof the same upto 100 lead. | 1,100 | Sft | 11 | ₹12,100 |
| 2 | Earthwork excavation in all types of soil for foundation, trenches, draws or other required works including dressing of sides ramming of bottom and disposal of surplus excavated earth upto 50 mtr. Lead a directed by E.I.C | 52.01 | cum | 350 | ₹18,203.5 |
| 3 | Providing and laying of hand packed stone solving of specified size thickness properly laid packed and compacted complate in all respects as directed by E.I.C | 15.57 | cum | 950 | ₹14,791.5 |
| 4 | Providing and laying of cement concrete of specified grade including compacting, finishing using vibrator all works upto plinth level including cost of carriage and head load but excluding lost of shuttering as directed by E.I.C
A: 1:4:8 (M 7.5) | 10.59 | Cum | 4,800 | ₹50,832 |
| 4.1 | B; 1:2:4 ( M 15) | 60.04 | Cum | 8,500 | ₹5,10,340 |
| 4.2 | C; RCC )1: 1.5 :3) (M20) | 21.23 | Cum | 10,200 | ₹2,16,546 |
| 5 | Stone work for wall linning etc (veneer work) in 1:4 Mix with chisel dressed of quarry stone incl C/o Carriage and head load complete as directed by E.I.C | 61.33 | SM | 14,545 | ₹8,92,044.85 |
| 6 | Raised pointing on stone wall work with cement motor mix in 1:3 mix as directed by E.I.C | 61.33 | SM | 225 | ₹13,799.25 |
| 7 | Providing, cutting, bending, binding and fixing of steel bars reinforcement of approved quality RCC works complate in all respects as directed by E.I.C | 1,373.62 | kgs | 93 | ₹1,27,746.66 |
| 8 | Providing and fixing centering and shuttering with necessary props, supports etc complete in all respects as directed by E.I.C | 78.1 | SM | 283 | ₹22,102.3 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_1036405.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .