Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.2 LAccepted-AOC | ₹44.2 L Quoted ₹44.5 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹44.8 L+₹28,628 (0.64%)Rejected-Finance | ₹44.8 L+₹28,628 (0.64%) | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹45.0 L+₹49,685 (1.12%)Rejected-Finance | ₹45.0 L+₹49,685 (1.12%) | L3 | Rejected-Finance Other than L1 |
| 4 | L4₹45.4 L+₹86,777 (1.95%)Rejected-Finance H NO 273 VPO SURHERA WEST DELHI 110043 | WEST DELHI | DELHI | 110043 | ₹45.4 L+₹86,777 (1.95%) | L4 | Rejected-Finance Other than L1 |
| 5 | L5₹46.7 L+₹2.2 L (4.90%)Rejected-Finance | ₹46.7 L+₹2.2 L (4.90%) | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | SHIV SHAKTI BUILDERS L5 | Vinod Kumar Bajaj L3 | M/S RAJESH KUMAR and CO. L4 | V R TRADERS L7 | GOURAV M ENTERPRISES L6 | mehar buildcon L2 | SHARMA ARCHITECT L1 | NAV DURGA CONSTRUCTION CO L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Cement concrete (unreinforced) of any description and in any position not otherwise specifically provided and removing to low lying area within station where directed complete all as specified | 59.5 | Cum | 700 ₹41,650 | 850 ₹50,575 | 830 ₹49,385 | 1,200 ₹71,400 | 450 ₹26,775 Lowest | 1,400 ₹83,300 | 1,400 ₹83,300 | 500 ₹29,750 |
| 2.00 | Water proofing treatment to sunken slab and adjoining vertical surfaces as specified under :-
(a) Cleaning of sunken portion and roughening to receive treatment.
(b) M&L rendering 10 mm thick in cement plaster (1:3) using coarse sand mixed with integral water proofing compound trowel even and smooth with steel trowel on sunken surfaces
(Note : WPC shall be measured and paid separately)
(c) Applying first coat of chemical pidifin 2K(Dr Fixit) on cleared RCC surfaces @ 0.86 Kg/Sqm (Minimum) as recommended by manufacturer.
(d) Provide a layer glass fibre mesh of size 2.25mm x2.25mm (45 GSM) over first coat of chemical Pidifin 2K as per manufacturers recommendation.
(e) Applying second coat of chemical Pidifin 2K (Dr Fixit) / equivalent @ 0.86 Kg/Sqm (minimum) layer glass fibre mesh of size 2.25mm x 2.25mm (45 GSM) as recommended by manufacturers.
Note: The plan area of floor shall be considered for payment | 100 | Sqm | 1,200 ₹1,20,000 Lowest | 1,500 ₹1,50,000 | 1,450 ₹1,45,000 | 1,200 ₹1,20,000 Lowest | 1,500 ₹1,50,000 | 1,250 ₹1,25,000 | 1,200 ₹1,20,000 Lowest | 1,250 ₹1,25,000 |
| 3.00 | M&L for broken brick bats 40 to 80mm as in filling of sunken floors etc. complete all as specified and directed | 40 | Cum | 1,500 ₹60,000 | 860 ₹34,400 | 650 ₹26,000 | 3,000 ₹1,20,000 | 500 ₹20,000 Lowest | 850 ₹34,000 | 650 ₹26,000 | 950 ₹38,000 |
| 4.00 | M&L for 25mm thick PCC 1:2:4 type B-0 (using 12.5mm graded aggregate) with WPC under floor over sunken complete all as specified and directed | 100 | Sqm | 300 ₹30,000 | 400 ₹40,000 | 450 ₹45,000 | 300 ₹30,000 | 650 ₹65,000 | 420 ₹42,000 | 400 ₹40,000 | 275 ₹27,500 Lowest |
| 5.00 | M&L for 50mm thick PCC (1:3:6) type C-2 (using 40mm graded aggregate) as in plinth protection and floors including making grooves complete all as specified and directed | 200 | Sqm | 380 ₹76,000 | 360 ₹72,000 | 400 ₹80,000 | 300 ₹60,000 Lowest | 700 ₹1,40,000 | 350 ₹70,000 | 350 ₹70,000 | 300 ₹60,000 Lowest |
| 6.00 | Demolition of RCC of any description such chajja, shelves etc and in any position not otherwise specially provided for complete all as specified and directed by Engineer in Charge and removing waste material to low lying area within station where directed complete all as specified and directed | 5 | Cum | 800 ₹4,000 | 550 ₹2,750 | 560 ₹2,800 | 4,000 ₹20,000 | 700 ₹3,500 | 510 ₹2,550 | 500 ₹2,500 Lowest | 500 ₹2,500 Lowest |
| 7.00 | M&L for reinforced cement concrete 1:1.5:3 type B-1 (using 20 mm graded aggregate) as in Slab supported on walls, beams and column in floors, roofs, landings, balconies, deck slabs and in shelves and etc. and setting in mortar complete with joints to match complete all as specified | 5 | Cum | 9,000 ₹45,000 | 9,000 ₹45,000 | 8,500 ₹42,500 | 5,000 ₹25,000 | 4,000 ₹20,000 Lowest | 9,000 ₹45,000 | 9,000 ₹45,000 | 9,500 ₹47,500 |
| 8.00 | M&L for TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with the including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified | 100 | Kg | 100 ₹10,000 Lowest | 120 ₹12,000 | 105 ₹10,500 | 120 ₹12,000 | 100 ₹10,000 Lowest | 110 ₹11,000 | 100 ₹10,000 Lowest | 105 ₹10,500 |
| 9.00 | Use and waste of form work through finished surfaces of soffits of suspended slab such as roof slabs, floor slabs, landings and similar work not exceeding 200mm thick and in beams/ columns etc. complete all as specified and directed | 50 | Sqm | 700 ₹35,000 | 600 ₹30,000 | 600 ₹30,000 | 500 ₹25,000 | 450 ₹22,500 Lowest | 675 ₹33,750 | 680 ₹34,000 | 900 ₹45,000 |
| 10.00 | Taking up or down GI/CPVC/any other tubing 15mm bore pipe incl removing to MES store complete all as specified and directed | 50 | RM | 25 ₹1,250 | 20 ₹1,000 | 30 ₹1,500 | 20 ₹1,000 | 20 ₹1,000 | 15 ₹750 Lowest | 20 ₹1,000 | 50 ₹2,500 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
30 Jul 2026, 6:00 pmClosed
GE Faridkot
GE FARIDKOT MIL STN
MISC REPAIR OF ORs JCOs MD ACCN UNDER AGE BR M AT FARIDKOT MIL STN
2026_MES_771809_2
GE FRD-17/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE Faridkot
Class D a i
9 documents required · 9 mandatory
₹500
GE FARIDKOT
₹90,000
Yes
1 Sept 2026
18 Jul 2026
1 Aug 2026
18 Jul 2026
30 Jul 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Cement concrete (unreinforced) of any description and in any position not otherwise specifically provided and removing to low lying area within station where directed complete all as specified | 58.75 | Cum | - | - |
| 2 | Water proofing treatment to sunken slab and adjoining vertical surfaces as specified under :-
(a) Cleaning of sunken portion and roughening to receive treatment.
(b) M&L rendering 10 mm thick in cement plaster (1:3) using coarse sand mixed with integral water proofing compound trowel even and smooth with steel trowel on sunken surfaces
(Note : WPC shall be measured and paid separately)
(c) Applying first coat of chemical pidifin 2K(Dr Fixit) on cleared RCC surfaces @ 0.86 Kg/Sqm (Minimum) as recommended by manufacturer.
(d) Provide a layer glass fibre mesh of size 2.25mm x2.25mm (45 GSM) over first coat of chemical Pidifin 2K as per manufacturers recommendation.
(e) Applying second coat of chemical Pidifin 2K (Dr Fixit) / equivalent @ 0.86 Kg/Sqm (minimum) layer glass fibre mesh of size 2.25mm x 2.25mm (45 GSM) as recommended by manufacturers.
Note: The plan area of floor shall be considered for payment | 100 | Sqm | - | - |
| 3 | M&L for broken brick bats 40 to 80mm as in filling of sunken floors etc. complete all as specified and directed | 40 | Cum | - | - |
| 4 | M&L for 25mm thick PCC 1:2:4 type B-0 (using 12.5mm graded aggregate) with WPC under floor over sunken complete all as specified and directed | 100 | Sqm | - | - |
| 5 | M&L for 50mm thick PCC (1:3:6) type C-2 (using 40mm graded aggregate) as in plinth protection and floors including making grooves complete all as specified and directed | 200 | Sqm | - | - |
| 6 | Demolition of RCC of any description such chajja, shelves etc and in any position not otherwise specially provided for complete all as specified and directed by Engineer in Charge and removing waste material to low lying area within station where directed complete all as specified and directed | 5 | Cum | - | - |
| 7 | M&L for reinforced cement concrete 1:1.5:3 type B-1 (using 20 mm graded aggregate) as in Slab supported on walls, beams and column in floors, roofs, landings, balconies, deck slabs and in shelves and etc. and setting in mortar complete with joints to match complete all as specified | 5 | Cum | - | - |
| 8 | M&L for TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with the including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified | 100 | Kg | - | - |
| 9 | Use and waste of form work through finished surfaces of soffits of suspended slab such as roof slabs, floor slabs, landings and similar work not exceeding 200mm thick and in beams/ columns etc. complete all as specified and directed | 50 | Sqm | - | - |
| 10 | Taking up or down GI/CPVC/any other tubing 15mm bore pipe incl removing to MES store complete all as specified and directed | 50 | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_873019.xls
BOQ • 0.44 MB
TenderDocuments17.pdf
Tender Documents • 0.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .