Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹68.6 L
EMD Value
₹1.4 L
Closing Date
17 Oct 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER
MINOR IRRIGATION DIVISION CHATRA
Construction of PCC Road from H/O Anil Turi to H/O Khadni Bigpul, Village-, Fulwariya, GP- Mishrol, Block-Tandwa, Dist.-Chatra.
2026_WRD_119668_1
DMFT/MID/CHATRA/F2-17/2026-27
Open Tender
Civil Works
Percentage
Mishrol
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.4 L
8 Oct 2026
8 Oct 2026
21 Oct 2026
8 Oct 2026
17 Oct 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearance in borrow area, building premises, flanks and slopes on the roads, canals and embankment by removing the grass and the jungle bushes from the top including weeding out shrubs including roots and levelling etc. complete as per direction of E/I. ( 2.02 PART A) | 0.35 | Ha | 19,760.3 | ₹6,916.11 |
| - | Compacting original ground supporting subgrade (Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.)SOR Item No. 3.20 Case-1 | 517.5 | M3 | 52.6 | ₹27,220.5 |
| - | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts& leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)S.O.R. Item No. 3.18 RCD | 140 | M3 | 131.3 | ₹18,382 |
| - | Construction of Granular Sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
(i) for grading- I Material
S.O.R. Item No. R.W.D 4.01 B (I) | 502.5 | M3 | 1,437.6 | ₹7,22,394 |
| - | Construction of un-reinforced, dowel jointed ,Plain Cement Concrete Pavement over a prepared sub base, with approved grade cement @400 kg per cum coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site laid with a fixed or slip form paver, spread, compacted finished in continuous operation including provision of contraction and expansion, construction and longitudanal joints,joint filler, seperation memberane, sealant primer,joint sealant,debonding strip,dowel bar,tie rod admixtures as approved,curing compound finishing to lines and grade as per drawing RCD 6.02 | 610 | M3 | 5,360.4 | ₹32,69,844 |
| - | CD=Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) (I) Ordinary Soil (Depth up to 3 m) S.O.R. Item No. 3.13 I B (I) | - | M2 | 55.8 | - |
| 7 | Dary rubble flooring (construction of dry rubble flooring at cross drainage works relatively less important works)
S.O.R. Item No. 16.09 | - | M3 | 1,544.4 | - |
| - | Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications
(P.C.C. Grade M-15 using batching plant & manual placing
S.O.R. Item No. 12.08 (A) Case II | - | M3 | 3,754.4 | - |
| - | Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Random Rubble Masonry in C.M. (1:3) in foundation
S.O.R. Item No. 12.07 (A) | - | M3 | 3,583.9 | - |
| - | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Random Rubble Masonry in C.M. (1:3) in substructure
S.O.R. Item No. 13.04 (B) | - | M2 | 3,727.1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tender_documents.pdf
Tender Documents • 2.27 MB
BOQ_161935.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .